RENCANA ANGGARAN BIAYA

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6

I PEKERJAAN SURVEY
Survey
1 1.00 ls 19,687,500.00 19,687,500.00
Pengukuran
PEKERJAAN CUT &
II
FILL
1 Cut 8,736 m3 36,925.88 322,584,444.00
2 Fill 8,736 m3 134,817.73 1,177,767,667.44
PEKERJAAN
III
FINISHING
1 Pemadatan Tanah 960 m2 249,750.00 239,760,000.00
Fill Cut
Koef Compacted Sand
P (m)
Ukuran Jalan L (m) T (m) Estimate R Clay m3 m3
80 12 7 1.3 8736 8736

Kondisi Jalan Tanah Padat, Analisa sudah dimasukkan koefesien pemadatan

PETA LOKASI
REKAPITULASI

Nama Paket : Pembangunan Office


Lokasi : Kota Batam
Sumber Dana : Swasta
Tahun Anggaran : 2023

TOTAL
NO URAIAN PEKERJAAN JUMLAH
(Rp)
1 2 3
I PEKERJAAN JASA SURVEI Rp. 19,687,500.00
II PEKERJAAN CUT & FILL Rp. 1,500,352,111.44
PEKERJAAN FINISHING (PEMADATAN
III Rp. 239,760,000.00
TANAH)
SUB TOTAL I +II+III Rp. 1,759,799,611.44
Profit 15% Rp. 263,969,941.72
TOTAL
Rp. 2,023,769,553.16
BIAYA
Rp. 2,023,769,000.00
DIBULATKAN

TERBILANG : Lima Ratus Tiga Puluh Lima Juta Empat Ratus Enam Puluh Tiga Ribu Rupiah