Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:

Student Names: Alex Bain Nathaniel Coates Sheet

Production Title: The Nostalgic Basement 1 of 1

DATE / LESSON: PRE / PROD / POST TASK TO BE COMPLETED BY? TO BE RESCHDULED?

13/03/23 PRE Initial Brainstorming of topic 13/03/23 NO

13/03/23 PRE Begin PowerPoint presentation of ideas --- NO

17/03/23 PRE Begin Name + Logo concepts 20/03/23 NO

Start to collect data + research (Create Surveys


17/03/23 PRE --- NO
with current progress)
Finalise PowerPoint (ensure all research is on
20/03/23 PRE PowerPoint, labelled, slides completed and 22/03/23 NO
formatted properly)
Perform presentation, upload PowerPoint and
24/03/23 PRE recording + gather peer feedback and upload to 24/04/23 NO
site (include conclusion of feedback)
Begin/Attempt to complete supporting
30/03/23 PRE documents (Risk assessment, Location Reccee, --- NO
Contingency plan)

31/03/23 PRE Contiune supporting documents 31/03/23 YES

Check over all props and ensure they are all


--- PRE --- ---
brought in (props list document maybe)
21/4/23 PRE Write and complete Script/AV Script 21/4/23 NO
Start and complete script for Express VPN
21/4/23 PRE 21/4/23 NO
advert for podcast
Source clips to be used as overlay footage to be
21/4/23 PRE -- --
used during podcast edit
24/4/23 PROD Film documentary 24/4/23 NO

24/4/23 PROD Film Ad for Express VPN 24/4/23 NO