ENERGY SAVINGS HERON ISLAND RESORT ......................................................................................... 1
1
EXECUTIVE
SUMMARY............................................................................................................................................ 4
2
IMPLEMENTATION .................................................................................................................................................. 6
3
INTRODUCTION ........................................................................................................................................................ 7
3.1
GENERAL....................................................................................................................................................................................7
3.2
OBJECTIVES ..............................................................................................................................................................................7
3.3
SCOPE
OF
WORKS...................................................................................................................................................................7
3.4
METHODOLOGY ......................................................................................................................................................................7
3.5
LIMITATIONS ...........................................................................................................................................................................7
3.6
CAVEAT.......................................................................................................................................................................................8
3.7
SITE
INSPECTIONS
AND
INTERVIEWS..........................................................................................................................8
4
BACKGROUND ........................................................................................................................................................... 9
4.1
LOCATION..................................................................................................................................................................................9
4.2
HERON
ISLAND
RESORT .....................................................................................................................................................9
4.2.1
HERON ISLAND RESORT FACILITIES ............................................................................................................ 9
5
CURRENT
ENERGY
USAGE ...................................................................................................................................10
5.1
ANNUAL
ENERGY
USAGE ................................................................................................................................................. 10
5.2
PEAK
POWER
DEMAND
&
LOAD
DURATION........................................................................................................... 10
5.3
RESORT
ENERGY
SERVICES
USAGE............................................................................................................................. 11
6
AUDIT
–
ENERGY
SERVICES.................................................................................................................................13
6.1
RESORT
ENERGY
SERVICES............................................................................................................................................ 13
6.2
LIGHTING ................................................................................................................................................................................ 14
6.2.1
DESCRIPTION OF EXISTING SYSTEM.........................................................................................................14
6.2.2
LIMITATIONS OF EXISTING DESIGN.............................................................................................................14
6.2.3
EFFICIENT ALTERNATIVE DESIGN ................................................................................................................14
6.3
AIR-‐CONDITIONING
&
VENTILATION ........................................................................................................................ 16
6.3.1
DESCRIPTION OF EXISTING SYSTEM.........................................................................................................16
6.3.2
LIMITATIONS OF EXISTING DESIGN.............................................................................................................16
6.3.3
EFFICIENT DESIGN ALTERNATIVE ................................................................................................................17
6.4
HOT
WATER........................................................................................................................................................................... 18
6.4.1
DESCRIPTION OF EXISTING SYSTEM.........................................................................................................18
6.4.2
LIMITATIONS OF EXISTING DESIGN.............................................................................................................18
6.4.3
EFFICIENT ALTERNATIVE DESIGN ................................................................................................................18
6.5
CATERING
FACILITIES ...................................................................................................................................................... 19
6.5.1
DESCRIPTION OF EXISTING SYSTEM.........................................................................................................19
6.5.2
LIMITATIONS OF EXISTING DESIGN.............................................................................................................19
6.5.3
EFFICIENT ALTERNATIVE DESIGN ................................................................................................................19
6.6
REFRIGERATION
FACILITIES......................................................................................................................................... 20
6.6.1
DESCRIPTION OF EXISTING SYSTEM.........................................................................................................20
6.6.2
LIMITATIONS OF EXISTING DESIGN.............................................................................................................20
6.6.3
EFFICIENT ALTERNATIVE DESIGN ................................................................................................................20
6.7
LAUNDRY
FACILITIES ....................................................................................................................................................... 22
6.7.1
DESCRIPTION OF EXISTING SYSTEM.........................................................................................................22
6.7.2
LIMITATIONS OF EXISTING DESIGN.............................................................................................................22
6.7.3
EFFICIENT ALTERNATIVE DESIGN ................................................................................................................22
6.7.4
UNMET SERVICES......................................................................................................................................................22
6.8
OTHER
SERVICES....................................................................................................................................................................... 23
6.8.1
DESCRIPTION OF EXISTING SYSTEM.........................................................................................................23
6.8.2
EFFICIENT ALTERNATIVE DESIGN ................................................................................................................23
7
CONCLUSIONS ..........................................................................................................................................................24
8
RECOMMENDATIONS ............................................................................................................................................25
8.1
OVERVIEW.............................................................................................................................................................................. 25
8.2
ENERGY
EFFICIENCY
AND
ENERGY
MANAGEMENT
INITIATIVES................................................................ 25
APPENDIX
1
-
PROJECT
METHODOLOGY................................................................................................................27
APPENDIX
2
-
LOAD
STATISTICS...............................................................................................................................29
APPENDIX
3
-
PEAK
POWER
DEMAND ....................................................................................................................30
APPENDIX
4
-
LOAD
DURATION ................................................................................................................................31
Integrated Energy Services Corporation Pty Ltd PO Box 5926 West End Qld 4101
Ph: 61 7 3844 8338 Fax: 61 7 3036 6245 Email:office@ensight.com.au website:www.ensight.com.au
APPENDIX
5
-
EQUIPMENT
DETAILS........................................................................................................................32
APPENDIX
6
–
SERVICE
USAGE ..................................................................................................................................33
Integrated Energy Services Corporation Pty Ltd PO Box 5926 West End Qld 4101
Ph: 61 7 3844 8338 Fax: 61 7 3036 6245 Email:office@ensight.com.au website:www.ensight.com.au
Prepared by EnSight
1 EXECUTIVE SUMMARY
The Heron Island Resort is currently using energy in-efficient technologies with an estimated existing
energy demand of 1,767 MWh per annum. The resort currently spends $621,358 per annum on diesel
fuel with the cost of diesel fuel to generate the electricity (excluding maintenance) being $0.35/kWh,
and LPGas at a cost of $0.11/kWh. This means that there are generally very short payback periods on
investment in energy efficient technologies and practices.
Based on implementing all the initiatives the resort could decrease its energy demand by 802 MWh,
reducing total operating costs by $280,000 a reduction of 47%. The capital investment required to
achieve this saving is estimated to be $996,000 providing a rate of return on investment of 29%. The
environmental benefits are also significant, with a reduction in greenhouse gas emissions estimated to
be 721 tonnes per annum. These energy savings are made up of several separate initiatives that are
summarised below.
Lighting - Through the wide spread adoption of energy efficient lighting in the resort, energy usage
will be reduced by over 178,000 kWh per annum, and operational savings of $62,400 will be achieved
for an estimated capital investment of $159,000 giving a rate of return on the investment of 39%.
Climate Control - Through the wide spread adoption of energy management in the application of air
conditioning throughout resort, energy usage will be reduced by over 165,900 kWh per annum, and
operational savings of $58,000 will be achieved for an estimated capital investment of $307,000 giving
a rate of return on the investment of 19%.
Hot Water - The implementation of a hot water ring main to some accommodation units, use of gas
boosters instead of electric water heaters, will reduce energy usage by over 117,000 kWh per annum
and operational savings of $41,000 will be achieved for an estimated capital investment of $206,000
giving a rate of return on the investment of 20%.
Refrigeration - The implementation of super efficient refrigeration equipment for cold rooms and
freezer rooms, upgrading 30 guest bar fridges and removing the remainder will reduce energy usage
by over 78,400 kWh, saving over $27,400 per annum. The estimated capital cost to upgrade the
energy management system would be in the order of $102,000 giving a rate of return on the
investment of 27%.
Laundry - The implementation of cold water laundry washing product will reduce energy consumption
by over 16,300 kWh saving over $5,700 per annum. The estimated capital cost to upgrade the
washing detergent would be in the order of $1,000 giving a rate of return on the investment of nearly
500%.
Kitchen - The implementation of new gas kitchen equipment will reduce electricity consumption by
over 56,400 kWh saving over $19,700 per annum. The estimated capital cost to upgrade the energy
management system would be in the order of $91,500 giving a rate of return on the investment of
21.5%.
Metering - The implementation of extensive online metering along with an Energy Management Plan
with efficiency benchmarks for each major energy use has the ability reduce electricity consumption by
over 80,000 kWh saving over $28,000 per annum. The estimated capital cost to upgrade the energy
Page 4 of 4
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
management system would be in the order of $85,000 giving a rate of return on the investment of
33%.
Page 5 of 5
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
2 IMPLEMENTATION
Heron Island Resort’s diesel generators currently operate with 3 generators on during peak demand
and a minimum of two generators at other times. By implementing immediate demand management
strategies, the diesel generators will be able to operate with 2 generators at peak and 1 generator at
off peak hours. The key implementation measures for the resort are:
• implement boosting hot water services with gas on other guest and staff accommodation water
heating
• installation of gas appliances in the kitchen including rack conveyor, urn, combi steamer, pass-
through, and espresso machine
Page 6 of 6
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
3 INTRODUCTION
3.1 GENERAL
Wide Bay Water Corporation engaged EnSight to undertake a detailed energy audit and develop cost
and energy saving strategies for Heron Island Resort.
3.2 OBJECTIVES
• Reduce annual energy costs without compromising the Resort's level of service to its clients.
• Identify energy saving opportunities from the adoption of energy efficient technologies
This Report:
• Describes energy consuming appliances and energy supply technologies and their current usage
patterns in the resort;
2. Site familiarisation
3.4 METHODOLOGY
Details of the methodology used in the development of this report are contained in Appendix 1.
3.5 LIMITATIONS
This report is only concerned with issues that impact upon energy use. The report has relied on data
provided by Heron Island Resort, and the analysis and recommendations are based on this data.
Water issues have been addressed only in the context of their impact on energy use and do not
address matters such as water supply, and matters that impact on the site such as sewerage
Page 7 of 7
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
3.6 CAVEAT
Whilst every effort is taken to ensure that the accuracy of this report, EnSight does not accept any
liability for any economic loss to the Heron Island Resort from reliance of the findings of this report. To
obtain the benefits outlined in this report detailed engineering is required to be undertaken. Due to the
report’s conceptual approach, this detailed engineering may identify additional technical issues that
need to be addressed that are not identified in this report. EnSight does not intend that Heron Island
Resort will proceed with any project identified in this report without undertaking detailed engineering
designs and budgets to confirm or otherwise the report’s recommendations unless this report was
accepted and EnSight took full responsibility for implementing the report’s findings.
EnSight’s Energy Auditors, Francis Barram and Paddy Atkinson carried out an inspection of the site
th th
between the 8 and 12 February 2010. As part of the site visit, extensive interviews were carried out
with the Resort’s Maintenance Manager.
Page 8 of 8
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
4 BACKGROUND
4.1 LOCATION
Heron Island, east of Gladstone by some 72km on Queensland’s Capricorn Coast. The 18-hectare
coral cay. The island is located on the World Heritage-listed Great Barrier Reef and is one of a handful
of coral cays off the Queensland coast.
Heron Island comprises 109 rooms across 5 distinct accommodation styles: 1 Beach House, 4 Point
Suites, 2 Wistari Suites, 20 Beachside Suites, 50 Reef Suites and 32 Turtle Rooms.
Page 9 of 9
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
This section details the current annual energy consumption of the Resort facilities. Because electricity
consumption is not metered, fuel usage is the best indicator of annual electricity use. Resort purchase
records were provided for the past 2 years, along with recorded electricity consumption of the resort
and the readings for the University of Queensland’s Research Station. Details of annual fuel usage
based on purchases as related to over the past year are provided in the table below.
Total Power Station
Diesel Fuel Use
Fuel Yearly Fuel Yearly Cost
Usage
Diesel 649,523 L $746,951
Based on total fuel consumption records 649,523 litres and electricity generation records 2,092 MWh
(refer to Appendix 2: Load Statistics). Based on diesel fuel costs of $1.14 per litre, the cost per kWh to
generate electricity is estimated at $0.35. Generator efficiency is at 30.3%.
The resort’s portion of the Total diesel fuel consumption is 540,311 litres which costs the resort some
$621,358 per annum.
Heron Island Resort
Diesel Fuel Use
Fuel Yearly Fuel Yearly Cost
Usage
Diesel 540,311 L $621,358
The energy audit and computer modeling of hourly electricity use (and based on the results from on-
site monitoring), indicates that the resort has a peak power demand of 450kW (refer to Appendix 3:
Peak Power Demand). The load duration curve, which is the estimated hourly load ranked from
highest demand to lowest demand for each of the 8,760 hours per year is in Appendix 4: Load
Duration.
Page 10 of 10
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
A breakdown of energy usage for Resort facilities based upon audit results and computer modeling is
provided in Table 2 and Figure 1.
Component of Energy Use Annual Energy Proportion of Total
Use Energy Use (%)
(kWh/yr)
Air Conditioning 287,245 16.3%
Ventilation 122,561 6.9%
Workshop Equip. 766 0.0%
Cooking & Catering 82,084 4.6%
Lighting 279,934 15.8%
Laundry 28,691 1.6%
Refrigeration 292,634 16.6%
Office & Entertainment Equipment 80,303 4.5%
Pumping 280,855 15.9%
Hot Water 259,624 14.7%
Miscellaneous 52,762 3.0%
TOTALS 1,767,459 100.0%
Table 2: Breakdown of Total Energy Use by Service
Page 11 of 11
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Total energy use on site (including water services detailed in Section 7) is 1,767 MWh (refer to
Appendix 5: Equipment Details). As can be seen from the table and pie chart, air conditioning &
ventilation followed by water heating, lighting, pumping, and refrigeration constitutes the highest
energy uses on site.
Page 12 of 12
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
This section details our audit findings for each of the services provided on site, excluding water that is
provided in Section 7.
1. Lighting
2. Air conditioning
3. Hot water – guest, staff and operational services
4. Cooking facilities – Main kitchen.
5. Refrigeration – guest, staff and operational services.
6. Other services – includes appliances, office equipment, and workshop equipment.
Page 13 of 13
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
6.2 LIGHTING
Lighting uses 89,709 kWh/year of energy per year and accounts for an estimated 18% of the total
energy use of the Resort. Lighting sources at the Resort include:
• Low voltage halogen spot lighting and compact fluorescent lighting accommodation and central
core
• Low voltage halogen and CFLs for path and garden lighting
Equipment
The existing lighting system in the guest accommodation and facilities of the resort utilises a range
of 35 watt to 50 watt halogen lamps. There is program of replacing all failed 50 watt lamps with 35
watt lamps, reducing lumen output for each application.
The existing lighting system does not utilise efficient energy management practices.
The existing lighting system in the office and back of house areas utilise the inefficient T8
fluorescent lamps.
Practices
In many cases, 66% of unoccupied guestrooms were found to have one or more lights left on.
Equipment
Replace all halogen downlights with a 10 watt LED (similar lumen output to 50watt halogen)
downlight.
1
Based on the cost of electricity generation of $0.35/kWh.
Page 14 of 14
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Practices
Educate staff and guests to switch off lights when not in use. For example, switching off halogen
downlights in the Shearwater Restaurant during daylight occupancy can reduce energy usage
from 18,000 kWh/year.
Page 15 of 15
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Air-conditioning and Ventilation which also ceiling fans uses around 409,806 kWh/year of energy per
year and accounts for an estimated 23.2% of the total electricity use of the Resort. Air conditioners are
used in seven guest units, the Shop, Aqua Spa, dive training room, Wobbly Bar, Staff Gym, Head
Chef, Pastry Kitchen and staff accommodation. All of the air conditioners are of the refrigerative direct
expansion split air conditioner type. This type of unit has a maximum technical efficiency of 300%.
Ventilation consists of kitchen exhausts and
Equipment
The performance of DX type air conditioners are not controlled by room based energy
management technology, resulting in air conditioners operating in unoccupied rooms.
The ceiling fan technology used throughout the resort uses on average 70 watts of power at high
speed compared with world best practice 25 watts, with higher air movement output, resulting in
wasted power.
The kitchen exhaust ventilation fans are currently operated from early AM to late PM, the fan
exhaust volume is unable to be adjusted in accordance with the need of the kitchen’s levels of air
pollution.
Practices
In areas such as the back of house, the air conditioners are on when there is often no occupancy,
wasting electrical energy.
The resort has a desire to offer more wide spread guest room air conditioners. Current power
station constraints however, do not allow additional air conditioners to be installed.
Page 16 of 16
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
1. Install a movement-controlled energy management system on all air conditioners in the Resort
that allow the air conditioner to turn off when no one is utilising the office area, savings of up to
50% are estimated.
2. Replace all ceiling fans with high efficiency pulse modulated DC motor type units, saving up to
75% of the energy.
3. Install variable speed drive and light sensors in the main kitchen hoods to control the ventilsation
fans, this will reduce the expected energy usage by up to 70%.
Page 17 of 17
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Hot water uses an estimated 144,387 kWh/year of energy per year and accounts for 28% of the total
energy use of the Resort. The resort has a range of water heating solutions it uses, including electric
storage, electric boosted solar, gas instantaneous and heat recovery.
2. A hot water supply line, in the order of 40mm pipe, with a return pump, would connect into the
existing power station hot water ring main and connect to the maintenance house water heater. A
controller would be installed on the existing hot water return in the maintenance shed to reduce
unneeded hot water recirculation.
Page 18 of 18
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
2. Replace electric passthroughts, urn and 3 group coffee machines with an equivalent gas model.
The current cost of running an electric passthrough over one shift is $15. Using current pricing,
the equivalent gas unit would cost $5 for the same period.
3. Replace electric conveyor toasters with sensor controlled conveyor toasters. The current cost of
running the electric units each morning is $6.5. Using current pricing, the equivalent units with
sensor controls would cost $2 for the same period.
Page 19 of 19
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Refrigeration uses an estimated 292,634 kWh/year of energy per year and accounts for 16.6% of the
total energy used on site. Most of the Resort’s refrigeration capacity is located in the kitchen and
dining area. Equipment includes:
• freezer room (kitchen)
• cool room (kitchen)
• 4 door underbench cooler (kitchen)
• 4 door fridge/freezer ((kitchen)
• ice machine (kitchen)
• 2 door fridge (dining room)
• 2 door underbench fridge (dining room)
Equipment
The existing refrigeration requirements appear to meet the current needs of the Resort with reference
to storage volume. The key limitations of the systems are as follows:
Use of multiple small compressors, which are relatively inefficient, compared to a few larger type
refrigerator compressors.
No redundancy in any one unit compressor, if a unit fails, its system will fail to operate.
The 109 x 100L bar fridges used in the guest rooms are inefficient relative to newer models.
1. Rationalise the number of small compressors, with efficient larger compressor and establish a
racking system, with a variable speed drive to improve overall performance of the refrigeration
system.
Install digital controls on the refrigeration system, with each evaporator installed with a digital
TX valve, pressure and temperature monitoring equipment.
2. Install more efficient 100L bar fridges and modify suite cabinets to allow bar fridges to breath and
cool.
Page 20 of 20
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Page 21 of 21
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Laundry facilities (washers and dryers in the laundry) use an estimated 114,619 kWh/year and
account for 22% of the resort’s total energy usage. The electric clothes dryers use a significant
proportion of the resort power generation capacity at the resort, approximately 20%.
Current laundry requirements are being met with the following equipment:
• 3 x Commercial Electric Washer
• 3 x Commercial Dryers
• 1 x Electric Clothes Iron
Equipment
Drying clothes using electricity is very energy inefficient. The dryers operate for up to 14 hours a day.
This constitutes a substantial energy use and power load for the resort.
1. Replace the guest laundry electric clothes dryers in the guest laundry facilities similar capacity
gas dryers.
A sheet flattener, which dries and flattens sheets has been purchased.
Page 22 of 22
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Other energy loads of the Resort include Office Equipment, Appliances (such as dive air compressors,
TVs, audio equipment, etc), Ventilation and Workshop Equipment. The energy use attributed to each
of these services is given in Table 15.
Table 15: Appliances, Office, Ventilation and Workshop Equipment - Audit Results
Practices
1. In the short term there are no cost-effective recommendations with respect to the existing
equipment. However, in the longer term it is recommended that energy efficiency be included as
part of the purchase decision when procuring future equipment. For example, photocopiers,
printers, and computers with the Energy Star label have the capacity to 'go to sleep' when not in
use, potentially cutting consumption by around two-thirds.
Page 23 of 23
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
7 CONCLUSIONS
Heron Island Resort can achieve substantial energy savings from the implementation of energy
efficient technologies and energy management practices. The total energy demand of 1,767 MWh per
annum can be reduced by approximately 832 MWh, bringing the Resorts’ total electricity load down to
965 MWh per annum. This can be seen in Table 24.
Modelling of the peak power demand indicates it will be reduced from 460kW to 250kW (refer to
Appendix 3: Peak Power Demand). This reduction in load equates to an annual saving in fuel
consumption of 241,000 litres of diesel valued at $280,000.
Page 24 of 24
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
8 RECOMMENDATIONS
8.1 OVERVIEW
Heron Island Resort has an opportunity to reduce its diesel purchases by nearly $280,000 per annum
through investing an estimated $966,000 in energy efficiency and energy management initiatives
(these savings are based on the Resort’s current occupancy rates). This represents a rate of return on
investment of 29%. In addition, it provides greenhouse gas savings of approximately 620 tonnes per
annum. A summary of the recommendations for implementation of energy efficiency measures is
given in Table 25. It contains the electrical savings achievable by implementing the recommendations.
Please note that the difference between the totals in Table 24 and 25 equates to the increased use of
LPGas, a cheaper, cleaner fuel supply.
Energy Efficiency and Energy Management Initiatives fall into two categories: technology and
practices. The implementation of the recommended technology initiatives appears easy, but is only the
beginning of an effective Energy Management Program. Without the implementation of best practice
policies and procedures, long term energy savings can be compromised.
All levels of Management and Staff need to feel they have ownership of energy efficiency
management within the Resort. The energy efficiency paradigm needs to be a part of the business
culture. Senior Management needs to demonstrate commitment through their business plans,
reporting and actions, and needs a particular Manager to champion energy efficiency. Other Staff
members need training to raise awareness of how to achieve energy efficient outcomes. Lodge
Guests will require education about energy and water conservation measures.
kWh
LIGHTS Saving CapX Opx ROI GHG
16W Led fluro replacements (some
energy management) 58,050 42,000 20,318 48.4% 47.4
6W LED incandescent and CFL
replacements (some energy
management) 17,591 24,000 6,157 25.7% 14.4
10W LED halogen replacement (some
energy management) 102,751 93,671 35,963 38.4% 83.9
Total 178,392 159,671 62,437 39.1% 145.7
kWh
AIR CONDITIONING Saving CapX Opx ROI GHG
Energy management air conditioners 89,375 128,500 31,281 24.3% 73.0
Efficient fans 54,356 166,000 19,024 11.5% 44.4
Energy management on kitchen 22,124 12,500 7,743 61.9% 18.1
Page 25 of 25
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
exhaust
Total 165,855 307,000 58,049 18.9% 135.4
kWh
WATER HEATING Saving CapX Opx ROI GHG
Solar with gas instantaneous 96,445 33,756 191,000 17.7% 78.8
Heat recovery from generator to supply
maintanance managers hot water
system 20,971 7,340 15,000 48.9% 17.1
Total 117,417 41,096 206,000 19.9% 95.9
kWh
CATERING Saving CapX Opx ROI GHG
Gas passthroughs, gas instant hot
water, gas espresso machines 12,263 26,500 4,292 16.2% 10.0
Automatic conveyor toasters 3,581 5,000 1,253 25.1% 2.9
Gas rack conveyor dishwasher 45,370 60,000 15,880 26.5% 37.0
Total 91,500 21,425 23.4% 50.0
kWh
REFRIGERATION Saving CapX Opx ROI GHG
Bar fridges in family suites replaced
with efficient models 6,578 10,000 2,302 23.0% 5.4
Bar fridges in non-family suites
removed 20,082 2,000 7,029 351.4% 16.4
VSD racked compressors with digital
controls for kitchen coldrooms and
freezer rooms and VSD and digital
controls for bar coldroom 54,207 89,500 18,972 21.2% 44.3
Staff vending machine energy
management 241 500 84 16.9% 0.2
Total 81,107 102,000 28,387 412.5% 66.2
kWh
LANUDRY Saving CapX Opx ROI GHG
All guest dryers replaced with gas types 4,030 11,000 1,411 13% 3.3
Use cold/warm water detergents in
laundry 12,264 4,000 4,292 107% 10.0
Total 16,294 15,000 5,703 38% 13.3
*
This
is
the
modelled
electricity
saving
in
kWh.
It
does
not
include
LPGas
usage
as
Table
24
does.
Page 26 of 26
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
APPENDIX 1 - PROJECT
METHODOLOGY
A detailed audit including the installation of energy measuring equipment at the main switchboard and
testing of particular equipment was undertaken to determine:
• The Resort’s total energy load and its power demand pattern
• Individual energy consuming loads throughout the resort
• Energy use patterns of end-use appliances and technologies
• Current maintenance regime and annual operating costs
EnSight will provide a summary of design solutions and recommendations that satisfy eco-efficient
principles and:
• Meet established quality service standards
• Meet clients’ investment criteria
• Meet maintenance and building user requirements
• Meet the clients’ Environmental Management System requirements
Modeling of audit and demand management options for the resort was undertaken using EnSight’
proprietary software ECO-EFFICIENT DESIGNSOFTWARE.
Project Deliverables:
Page 27 of 27
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
A comprehensive report outlining energy efficiency measures for implementation are provided. The
report provides a tiered action plan for immediate opportunities and longer-term eco-efficient
opportunities. Topics covered in this report include:
• Power generation
• Renewable energy systems
• Air conditioning
• Lighting
• Water heating
• Passive strategies
Page 28 of 28
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Page 29 of 29
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Page 30 of 30
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft
Prepared by EnSight
Page 31 of 31
Project No: 1087
Energy Services Report – Heron Island Resort
Prepared: 3 March 2010 Revision: Draft