You are on page 1of 2

Repair of Columns at DDM Building

STRUCTURE LOCATION DATE CASTED

GL B/9 (1st Lift,Level 3) SIKA215 24-Mar-23


GL B/5 (1st Lift, Level 3) SIKA 215 28-Mar-23
GL B/9 (2nd Lift, Level 3) SIKA 215 30-Mar-23
GL B/6.1 (1st Lift, GF) SIKA 215 30-Mar-23
GL A/5 (1st Lift, GF) SIKA215 11-Apr-23
GL B/2.1 (1st Lift, GF) SIKA 215 11-Apr-23
GL B/3.1 (1st Lift, GF) SIKA 215 15-Apr-23
GL C/3.1 (1st Lift, GF) SIKA 215 17-Apr-23
Repair of Columns at RDD Building

STRUCTURE LOCATION DATE CASTED

GL P/10 (1st Lift, Level 3) SIKA 215 19-Apr-23

You might also like