Professional Documents
Culture Documents
Vigas
Vigas
h aligerado = 20 cm
4.35/11= VP = 25 x 40
h= 0.39545455 0.4
METRADO DE CARGAS
Tabiqueria0.12*4*1.4
: = 0.67 tn/m
S/C 0.30*4*1.7
: = 2.04 tn/m
= 5.08 tn/m
CALCULO DE MOMENTO
Wu = 5.08 tn/m
(3.89×10^5)/
As =(0.9×4200∗(33.75−2.39/2)) As = 5.99
a= 4.23
As = 3.16 cm2
As = 5.97
3.16𝑥4200/0.85𝑥
a = 280𝑥25= 2.23 cm
a= 4.21
(3.89×10^5)/(0.9×4200∗(33.75−2.23/2))
As =
As = 3.15 cm2
a = 3.15𝑥4200/0.85𝑥28
0𝑥25=
2.22 cm
COLOCACION DE ACERO
1/11 (5.08)
((4+1.10)/2)^2= 3.00 tn/m
cm a= 1.71 cm a=
cm a= 1.70 cm a=
1.84 cm a= 4.22 cm
1.71 cm a= 4.05 cm
1.70 cm a= 4.04 cm
M6= 3.89Tn x m:
5−6.75/2)) (3.89×10^5)/(0.9×4200∗(33.75−6.75/2))
As=
As = 3.39 cm2
3.39𝑥4200/0.85𝑥
a = 280𝑥25= 2.39 cm
(3.89×10^5)/
As =(0.9×4200∗(33.75−2.39/2))
As = 3.16 cm2
3.16𝑥4200/0.85𝑥
a = 280𝑥25= 2.23 cm
(3.89×10^5)/(0.9×4200∗(33.75−2.23/2))
As =
As = 3.15 cm2
a = 3.15𝑥4200/0.85𝑥28
0𝑥25=
2.22 cm