Professional Documents
Culture Documents
9839-MUTU-ZIRA-21-STA-DST-0001 - Rev.A Cover
9839-MUTU-ZIRA-21-STA-DST-0001 - Rev.A Cover
SWALANG INFRASTRUCTURE
DEVELOPMENT
TITLE OF DOCUMENT:
DOCUMENT NO.:
9839-MUTU-ZIRA-21-STA-DTS-0001
ISSUED
REV. STATUS PREPARED BY REVIEWED BY APPROVED BY
DATE
A 1-Feb-23 Issued for Information FMM BAZ MCH / ARQ
DETAIL ENGINEERING DESIGN OF
SWALANG INFRASTRUCTURE
DEVELOPMENT
REVISION HISTORY
Page 2 of 6
DETAIL ENGINEERING DESIGN OF
SWALANG INFRASTRUCTURE
DEVELOPMENT
TABLE OF CONTENT
INTRODUCTION ................................................................................................................................................................. 4
1.1 PROJECT BACKGROUND ................................................................................................................4
1.2 PURPOSE AND SCOPE....................................................................................................................5
DATASHEET FOR UTILITY TRANSFER PUMP.......................................................................................................... 5
Page 3 of 6
DETAIL ENGINEERING DESIGN OF
SWALANG INFRASTRUCTURE
DEVELOPMENT
INTRODUCTION
The location of the project can be reached by the following mode operation. Access routes
are shown on the map above with the duration of the trip shown in the table below.
Transportation Options
Destination Palangkaraya Banjarmasin Balikpapan
In-land Transporation ± 5 hr 20 mn ± 6 hr 45 mn ± 9 hr 25 mn
Page 4 of 6
DETAIL ENGINEERING DESIGN OF
SWALANG INFRASTRUCTURE
DEVELOPMENT
Page 5 of 6