Job Methode Statement: Equipment, Accessories, & Ppe Special Tools Type 1 Scales Weight
Job Methode Statement: Equipment, Accessories, & Ppe Special Tools Type 1 Scales Weight
REV -
DOCUMENT NO : SAMPLING CATALYST AND
MPI-JMS- 015 RECORDING Date : 21-03-2023
Responsibility
Item Procedure Description Refer Doc. No. Checklist
By
2. Execution
2.1 After the top manhole opens, personil took photos and MPI
videos of the 25 mm Ceramic Ball
2.9 After the side manway opens and has atmospheric MPI
condition, Personnel take photos and videos of Mesh
Layer#3
NOTES: All samples are collected at every end of shift, and take them
to Site Lab for pretreatment before delivery for safety purpose.