You are on page 1of 3

ALD-QHSES-RA-026

WORKING NEAR OR ABOVE WATER

Consequence (ref. DEME-QHSES-SOI-065)

Consequence (ref. DEME-QHSES-SOI-065)


Probability (ref. DEME-QHSES-SOI-065)

Probability (ref. DEME-QHSES-SOI-065)


Risk (ref. DEME-QHSES-SOI-065)

Risk (ref. DEME-QHSES-SOI-065)


Measures cf. ISO 45001
1. Elimination
2. Substitution
3. Engineering controls

P,A,Q,E,R
4. Administrative controls (Procedures, signage, warnings,
training, inspecting equipment)
5. Personal protective equipment
Nr (Sub)Activity Hazard/Aspect Event: consequence/impact 6. Damage Control Actions
References Applicable High Risk Tasks
Ref.1
Ref.2
Ref.3
1 General
1 Standard mitigating measures for all activities 4. Personnel competent for the task
4. Toolbox talk to be held prior operation
4. Perform "Take 5" (LMRA)
5. Standard PPE to be worn
2 Activities
1. If weather permitting the MOB can be lowered (masters
decision)
Fall from heights - break down hoisting 4. MOB drill according SOLAS frequency
Use of rescue boat: Lowering/ hoisting Fatality, injury, damage to equipment P 2 5 10 1 5 5
equipment 4. Periodical maintenance and inspection of LSA
5. Wear appropriate PPE: Lifejacket, Survival suit, Personal
locator beacon
1. In emergency situations weather permitting the MOB
can be launched (masters decision)
4. MOB drill according SOLAS frequency
Use of rescue boat: Sailing Capsizing, man overboard Fatality, injury, damage to equipment P 3 4 12 2 4 8
4. Periodical maintenance and inspection of LSA
5. Wear appropriate PPE: Lifejacket, Survival suit, Personal
beacon
1. If possible postpone the works to drydock/MR
3. Working with LOP certified crane
Crane not suitable for Lifting Of 4. Crane operator has a crane certificate
Working above water in manbasket People stuck in basket/ Falling into sea P 2 5 10 1 5 5
Persons 4. Proper maintenance and inspection on the crane and
manbasket are to be done according to manufacturers
instructions
1. If possible postpone the works to drydock/MR
3. Working with LOP certified crane
4. Crane operator has a crane certificate
Working above water in manbasket Crane operator lack of training People stuck in basket/ Falling into sea P 2 5 10 1 5 5
4. Proper maintenance and inspection on the crane and
manbasket are to be done according to manufacturers
instructions

Rev. 2021-11-18 Uncontrolled if printed. Most recent version is available on Navigator. page 1 of 3
ALD-QHSES-RA-026

WORKING NEAR OR ABOVE WATER


1. Proper risk assessment prior to commencement of works
if all conditions are acceptable. Otherwise postpone the
work.
4. PMS and maintenance crane according to
Crane failure: crane stops working Injury of persons inside manbasket/ manufacturer's instructions
Working above water in manbasket P 2 5 10 1 5 5
above water Falling into sea 5. Use of PPE: fall harness+ lifejacket according to
procedures
6. Activate Emergency control of crane
6. Use of emergency stops if necessary
6. First aid/ Evacuation plan
1. Proper risk assessment prior to commencement of works
if all conditions are acceptable. Otherwise postpone the
work.
4. PMS and maintenance crane according to
Injury of persons inside manbasket/
Working above water in manbasket Crane failure: crane wire rope breaking P 2 5 10 manufacturer's instructions 1 5 5
Falling into sea
4. Crane has a wire rope certificate
5. Use of PPE: fall harness+ lifejacket according to
procedures
6. First aid/ Evacuation plan
1. Proper risk assessment prior to commencement of works
to assess if the weather conditions are acceptable.
Otherwise postpone the work.
4. Use of taglines and sufficient trained persons available to
guide the manbasket
4. Proper training for crane operator
4. Proper communication between crane operator and
Injury of persons inside manbasket/
Working above water in manbasket Bad weather conditions P 2 5 10 manbasket 1 5 5
Falling into sea
4. Adhere to procedures DEME-QHSES-SOI-045 working
near and above water, DEME-QHSES-PRO-015 Working at
height and DEME-QHSES-SOI-031 Lifting of persons
5. Use of PPE: fall harness+ lifejacket according to
procedures
6. First aid/ Evacuation plan

1. Proper risk assessment prior to commencement of works


if all conditions are acceptable. Otherwise postpone the
work.
4. Use of taglines and sufficient trained persons available to
guide the manbasket
Injury of persons inside manbasket/
Working above water in manbasket Crane movements causing swaying P 2 5 10 4. Proper training for crane operator 1 5 5
Falling into sea
4. Proper communication between crane operator and
manbasket
5. 5. Use of PPE: fall harness+ lifejacket according to
procedures
6. First aid/ Evacuation plan
3. Provide and maintain proper condition of railings -
replace damaged railings.
Working near water on deck Slipping/tripping Falling overboard P 3 4 12 3. Provide anti slip while painting deck 1 4 4
5. PPE such as lifejackets to be worn with Personal locator
beacon
5. Wear appropriate PPE (Lifejacket, Personal beacon, fall
Working near water on deck Falling from heights into water Fatality, injury P 3 4 12 2 2 4
protection)

Rev. 2021-11-18 Uncontrolled if printed. Most recent version is available on Navigator. page 2 of 3
ALD-QHSES-RA-026

WORKING NEAR OR ABOVE WATER


4. Rest hours in place and to be respected
5. Wear appropriate PPE (Lifejacket, Personal beacon, fall
Working near water on deck Fatigue Fatality, injury P 3 4 12 1 4 4
protection)

4. Keep track of weather conditions and perform good


seamanship by stopping all works near water when weather
Adverse weather conditions resulting
Working near water on deck Fatality, injury P 3 4 12 deteriorates (see DEME-VMS-SOI-025) 1 4 4
in falling overboard
5. Wear appropriate PPE (Lifejacket, Personal beacon, fall
protection)

Rev. 2021-11-18 Uncontrolled if printed. Most recent version is available on Navigator. page 3 of 3