You are on page 1of 126
ini — ‘constructions het insulation INSULATIONFINIGHING DETAILS FOR PIPING vere for piping Insulaton of pang by means of pipe sectors and blankets ‘Suppo frinslaton and lacking of varical and hariontl piping Insulaton support ngs for vera! ing “Traced piping in pe sections and wire mesh bankas Irsulaton and metal jacketng Insulaten at expansion ont oforzortal and vera piping Non insulated fanges, horizontal and vertical Frat oes n cada Inslaton a clamped pipe shoe “Tunnon supports for hrzonal and vera ping Hanger support Various T-ieces End caprT:plece constructions Hofiontal end vertical bows ‘Table or determination the number of jacket segments requ er 90° ows Concent reducers Eocene reducers Removable fange box, horzontal Removable flange bo, vertzal Removable valve box, LEAK DETECTION PPE — TORNECTION HPLC REE NOTE 4 VERTICAL NOTE {FOR MATERIALS ANO_FINSHENG IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS. AND. SPECIFICATION 2 FOR THE VALVE BOX DESIGNSEE CW 4.122 5 REMOVABLE STANLESS STEEL LEAK PREVENTION COLLAR SHALL BE FASTENED WITH STANLESS STEEL BANDS. THE SPACE BETWEEN COLLAR AND FLANGE SHALL BE SEALED WITH 2 mm THK GASKET (GESISTANT TO THE PRODUCT AND HEAN, 4A CELLULAR GLASS PPE SECTION SHALL B€ GLUED LiQUD-TGHT To THE PIPE ON LOWER SOE OF THE FLANGE BY PEANS OF HEAT-RESISTANT ie ele c Cini HEAT INSULATION Ot 431 NSULATIONFRESHING DETAIL 2006-10-08 REMOVABLE VALVE BOX" FOR VALVE WITH SPECTACLE BLN, VERTICAL see \ Dera & AND WITH QUEK._ RELEASE TOGGLE REF NOTE Se fe, NoTE 3 REF Wo RE WOTE 4 ne i aw CoveR BOX_SUPPORT _ANGLI sore {MATERIALS AND FINSIANG IN ACCORDANCE WITH NSTALLATIN INSTRUCTIONS AND SPECICATION, 2 OISTANCE BETWEEN INSULATION NO FLANGE TO BE BOLT LENGTH « 30m. 3 NSULATION THICKNESS, 4 TOP ANO BOTTOM PLATES SHALL BE FITTED UP AGAMST THE FLANGE BOLTS 5 TO PREVENT WATER INGRESS, OPEN SPACE SHALL BE SEALED WITH ALUMINUM TAPE IN ACCOROANCE. WITH CIN. 3.3.01 6 FOR THE VALVE BOX DESIG, SEE CM 4.122 -steting Commis late Mederlandsetnutie ole HEAT INSULATION aa 132 THA ssxsrovrnene ser ims REMOVABLE VALVE BOX FOR VALVE sheet of 4 WITH SPECTACLE BUND, HORIZONTAL REE. NOTE 4 DETAIL A REF REF Nove 2 NOTE 3 ana Wirt quick RELEASE TOGGLE REE_AOTE Nore, MATERIALS. AND FINISHING NV ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECIFICATION, DISTANCE BETWEEN INSULATION AND FLANGE TO BE BOLT LENGTH + 300m INSULATION THICKNESS, END PLATES SHALL BE FITTED UP AGANST THE FLANGE BOLTS TO PREVENT WATER INGRESS, OPEN SPACE SHALL BE SEALED WITH ALUMINUM TAPE IN ACCOROANCE. WITH CN 3.3.01 Foa THE VALVE BOX OESIGN, SEE CIM) 6.120, Stichting Ieoltie Nefelandee Indus ole (a (ini HEAT INSULATION ow 433 INSULATION J FINSHING DETAR, 2005-10-01 CONTROL SYSTEM / ORE PLATE Ti see oeran “2 | SEE DETAIL “A* . Ref, NOTE 5 & FoR REMOVABLE VALVE aox SGRLECT, a7 SE ON LA | hi ones Pate = FAS — ono on eucx . RELEASE TOGGLE ir REF, NOTE 2 | Ee ime C 188 cagunegon f auon Jepoungct BRE Ga UR oan 0x SUPPORT ance REF NOTE ¢ ETAL “A" oerAL “a shout orice plate vit oFFie plate NOTE 1 MATERIALS, AND FISHING WL ACCORDANCE WITH INSULATION INSTRUCTIONS AND. SPECECATONS 2 MEVSEEAATOS sation AO LANGE 10 BC OOLT LENGHT «2008 CTR PUBS PER! 20x TANIMAL TWO BOX SUFPORT ANGLES »30nn WIDE AND >0.8mm THICK BLING FLANGE" APPLIATIN AS PER CH SB sticking Commis ose Nederene Industrie comes HEAT INSULATION ni fiing deta org Zorro. Bag tan 4 Non contact insulation vos Laps as ie F sbuay oats Ok ha Pre MEER vi A nt OF 9 (ini HEAT INSULATION MEASUREMENT AND INSTALLATION OETAIL INSULATION MATTRESS FOR T-PIECES et i 4.150 99-09-09 . Esisting nstation secamterence 62 NOTE: a H Esting ieioton cecunference 63 MEASUREMENT DRAWING Sineasioe io me Gin | Desepion Z Inedaton mattress SACCORONG. WH INSTALLATION ial | aetna ASTRUCTONS. sho. SHC ATION any Bhat C & | Bstence tv Q 5 Distance ppaline centrfsise mattress stichting tsoatie Nederta INSULATION MATTRESS FOR FLANGES aT HEAT INSULATION gag gas; Fangs crcunterence Pina wining inuation greumorence G MEASUREMENT DRAWING acing see 4205, Casing see 4105 INSTALLATION DRAWING Se Seer aan Oa. | Oeseration ‘A | stance existing lation wa fhe Range NOTE: | ciecunerence existing insulation H k U MATERIALS. AND FSHNG SEE SPCCRCATION Miniqun overiap tsuatan mattress Eristing netaon stance between existing Insulation Greunerence of anges te Be insulates stichting Hee We HEAT INSULATION aw, THT essen no wsincanon ere noe INSULATION MATTRESS FOR STANDARD. VALVE sheet Tf 2 ale lexisting insulation. i Wau 4. Yr y Y Y y A eee epee evevexr A cxsoone | comee-ro-centae seurrarees on —/” sadn oun ves ruarten +L canons. C swace —-| DETAIL’ COVERED CLADDING SHEET note 1 MATERIALS AND FINISHING WN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECICATION ting Isolate Nederlandse Industrie hi cima.t3 HEATINSULATION-inelfon rinsing cas foreolmns ——SOHTSIOY ‘Support ring Cc Gri omaz.46 LHEATINSJLATION-nelaon/Fnching cas cols SONY IGOE Bed Ivan t ‘Support ring _TOERATURES uP 0 Loe vera. @ . HEATISULATION -tontston Fig dts rcoumns SGOT ini fe ‘ia vant ‘Vacuumring insulation inl a HEAT INSULATION INSULATIONFINSHING OFTAL NAMEPLATE. SUPPORT INSULATION MATERIAL Jo nanercare et | SELFTAPPERS want eauenent —f cao Nore, 1 MATE SECTION A-A ALS. AND FINSHING IN ACCOROANCE WITH INSTALLATION INSTRUCTIONS ANO_ SPECIFICATION C (ini HEAT INSULATION aM a20 SSULATION J ENSHNG OETAL, 260-01 VESSEL INSPECTION PLUG) INSULATION WATERAL EF, NOTE 2 i wT bose Woot ve wee. Nore 3 Vessel WALL 4 L SECTION AA can erent INSULATION MATERIAL —> note 1 MATERIALS AND FISHING mM ACCORDANCE WITH INSTALLATION STRUCTIONS AND SPECICATION 2 STALL THE VESSEL ISPECTION PLUG (VIP) IN ACCORDANCE WITH THE MANUFACTURER IRSTALLATION| STRUCTION, RCCESBLE FROM WALKWAYS. AND CAGE LADDERS 4 AFTER REMOVAL GF THE VIP" AND THE LOOSE. WOOL RSPECTION CAN. E EXECUTED (CO ater mispection Loose woot ANO Vip“ TO 8€” RENSTALLED _#ichtng Commiese Isolate Hederlndse Industrie enaaie a AT WSULATON-Isseon'neney certs SON Ot Gi a an aT e HEAT INSULATION gay case CUNT ses cae a INSULATION MATIRES FOR MANHOLES sheet 1 of 2 2 Dose 8 Wal enone Ke FRONT VIEW. ‘SIDE VIEW [Main dinensions for slation aatiress measirenant mensions ie aa ti, [ escrTan Note. ‘A [Distance betuoan Rengy ard wall (at The seed 1. MATERIAL'S. AND FISHING B |comection ameter INACCORDANCE witH WsTALLATION | C [Overall Thicimese of manhole flange INSTRUCTIONS. AND SPECICATION B |rtenge siameter Et [oistane mecsies E2| distance aacswee Hinge T oistance iting tug to caver 2 | nein nonate [Distance betwen flor sheet 2 of 2 e HEAT INSULATION gay gp / Wott equipment Exitng insulation equament Filer insation ete: C 1 MATEMAS 40 SINE ACORDANCE WT STALLATN STRUCT £40 SPECRATONS - 2 FOR MEASUREMENT SYSTEM, SEE Sete Swchting tsolatie Nederlandse Industrie OVERVIEW VERTICAL VESSELS We HEAT INSULATION ga isu Wo PING INSULATION T SEE 4.100 PE CONNECTION = WG SHE 6200 FTG. LUG 6303 \< 10° ome SEE 4203 AND 4.2.04 fevaz (t 42.09 Laouer suPPoRT _G See 4207 AND 4.208 EXPANSION JOWNT SS ste 4201 support See 43.02 J anno SEE 4.200 SAMPLE PONT See 43.0e & wy) REFERENCE, mOWCATER See 4.3.08 ee NAMEPLATE Ste 62. | 207TOM DOME SEE 43.1 PIPING INSULATION SEE hat support See 43.01 1 OVERVIEW HEAT INSULATION gw cu 99-07-02 TID vcsssencne aon 35000 25ten NN pr asutation PL See ata Nore, 1 MATERIALS ANO FINISHING IN ACCOROANCE WITH INSTALLATION INSTRUCTIONS. AND. SPECIFICATION. VESSEL SUPPORTS oe HEAT INSULATION gat goer suction cana THICKNESS, support 10900, 1000 cover uae 8 SeLFTAPPERS ‘ELFTAPPERS OR aLMo RIVETS, von & er, NOTE 2 SECTION A-A SECTION yore, 1 MATERIALS AND FINSHNG | ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND! SPECICATION, 2.IN CASE OF HEAT LOSS NEAR SUPPORT 1S UNACCEPTABLE, Vo TO BE C FILLED. WITH INSULATING MATERIAL Stichting leoltie Nederlandse industri HEAT INSULATION GM 303 ole 99-07-02 SELETAPPERS oR 8LND RIVETS c CONSTRUCTION 1 SECTION A-A wwstLaTion THICKNESS be SELETAPPERS 08 BLND RIVES CONSTRUCTION 2 18 SECTION B-B INSULATION FICKNESS wore, {MATERIALS AND FINISHING IN. ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECICATION. et io HEAT INSULATION GY 6.3.06 GN eee os REFERENCE INDICATOR. AND SAMPLE PONT SELETAPPERS oR LIND RIVETS. PERSPEX PLATE THICKNESS. Sn ea WALL eOUIPHENT ps aa = ko 00 [so] eal SECTION A-A DETAIL REFERENCE INDICATOR a4 SELETAPPERS waur eaupnent +f SECTION B-B DETAIL_SAMPLE POINT Nott 1 MATERIALS AND FIMISIENG ACCORDANCE WITH INSTALLATION INSTRUCTIONS ANO SPECIFICATION Stichting lsottie NegerlonéeeIndustie Dy VERVIEW HORIZONTAL. VESSELS a HEAT INSULATION a sip a - OVERVIEW TION conv sor g C 1 FOR FRONT VEEW, SEE 4321 2 MATERIALS, ANO FINSHING IN ACCOROANCE WITH INSTALLATION INSTRUCTIONS “AND SPECIFICATION Stichting leolatie Nedertandse Industrie elo HEAT INSULATION 32 TY — sxeeree nsuatoureesins setans 000 ( Woacontal ess cowecron we ever cause Mb ste cz RAN OUTSIDE INSULATION FRONT VIEW nove 1 FOR SIDE VEW, SEE 4.3.20 2 MATERIALS AND FINSHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS. AND. SPECICATION Stichting Inlate Nederlandse Industrie ave HEAT INSULATION gw 322 evel: GAUGE veo EDGE SELFTAPPERS oR GLASS WALL COUPNENT | SECTION A-A tee “ SECTION B-B sore {MATERIALS AND FINISHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS. AND SPECEICATION, Stichting teaatie Nederlandse Industrie SPHERICAL HEAG. (SEM €LUPTICAL) pani aT 6 HEAT INSULATION gus, fe TIL ssesrovrsesins cra aio.ts-0 MAXIMUM POSSIBLE SIZE PREFAS SEGYENTS TO OE INSTALLED BY MEANS OF BLIND RVETS Lvoraruona swaces LonaruonaL_swacs vo ae Farteh ose waren CERO SECTION A-A ALS. AND FINISHING IN ACCORDAN INSTRUCTIONS AND) SPECIFICATION WITH INSTALLATION Stichting teoatie Nederlandse Industrie (ir 4 HEAT INSULATION oe C nl INSULATIONFRNSHNG OETA. eae SPMERICAL HEAD (SEMI-ELLIPTICAL) sheet 1 of 1 IAXIMUY POSSIBLE SIZE PREFAB NTS TO BE ae SELETAPPERS 08 IW CASE OF : BLANKET INSULATION CE otiae SUPPORT RING, SEE 4.213 SWAGES 10 ae FLATTEN INSTALLED BY MEANS OF BLIND IVETS MANHOLE cavER SEE 4.290, INSULATION MATERIAL CORGITUOINAL_swActs To BE FLATTEN BERD SECTION A-A Noe 1 MATERIALS AND FINISHING IN_ACCORDANCE WITH INSTALLATION INSTRUCTIONS. AND) SPECIFICATION, 2 INSULATION TACKNESS Stichting Isolate Nederlandse Industrie oT oo HEAT INSULATION ge sos TIL ssxssoucrsins ocr mone BOTTOM NOZZLE BOX SULATION MATERIAL ee Detait & If OUAMETER 2500nm STIFFENER. LOGE SEE SECTION AA, 4.2.10 © Foon seam I nate 1 MATERIALS AND FINISHING mY ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECIFICATION Stichting Itlate Nedertandse Industrie 99-09-09 mt 4.4.00 HEAT INSULATION OVERVIEW NSULATION/EINSHING DETALS OVERVIEW HORLZONTAL HEAT EXCHANGERS Mi MIAM3A0 srr Bs NOIL23NNOD ate eer 3s vwuggot« 851 0 ow “TwNIONL INO avy as Sue dans ary 335 XO SHOHAWA sIBYAOH ER ser7 3 X08 Noishvax3 STBVAOARE sort Nau73hnd3 love 33s woods avai 340d stichting lel i OA. «1,0000n HEAT INSULATION INSULATION/FINSHING DETAIL OME HEAD (HORIZONTAL) at 6.401 99-09-08 StE_OETAL & SEE 0.02 \F BLANKET INSULATION subPont aNG, ‘See 6.243 3300 STIEFENER_ EDGE _ ia Sdn Sam SECTION A-A Nome SEE OCTAL VE FaLoED SEAM — TAlL_A 1 MATERIALS AND FINSHNG IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS. AND SPECICATION 2 INSULATION THICKNESS: Stichiing tsolatie Neferlandse Industrie te ini \ HEAT INSULATION a coup (suc ATION/Fausiou5 DETR 20-10-01 REMOVABLE MANHOLE BO HORIZONTAL) TWO SECTIONS 20x 10 Fx SF BLANKET misuLATION vit ON ‘cYUnDaicAL_ 80x ‘SUPPORT. RNG WITH SELPTAPPERS see 420 ue RELEASE TooGLe Rem wore 2 See 225029 ESE Sie BUND River ae. Linsuvaron Tall z eno oweo seam cur = 4 eens STRFENER bce ise ‘om 500mm Sian toes: nsuarioN “HINES 1 DETAIL B Sth vers SECTION ACA % Se vera Fone cue sore {MATERIALS AND FONSHING IN ACCORDANCE WIT NSTALLATION INSTRUCTIONS AND. SPECICATION 2 BANOS TO BE FIXED ONTO BOX BY MEANS OF BLNO RIVETS. stloting CommisteLaateHederlandse Indie oT o HEAT INSULATION gay gssp THAT ssestoveeesing ocr oe Cc REMOVABLE MANHOLE. 60x (HORIZONTAL) TWO SECTIONS 80x TO Fie IF BLANKET WSULATION REF, NOTE 3 Davin ‘ON CYLINDRICAL. Box SUPPORT RING WITH SELFTADPERS ste SEE 42.8 Seay se P—OETAL A C i Per wove 2 See 9250023 ae, esH 50 suiarion-< UID awer C sexo — Fouoeo sens cor iff RB ae ~ CLIP, THICKNESS SSR esti & 295 ‘kil es Tal 5e5 3 wove Foe ‘SECTION A-A gee ‘BLIND RIVETS a - ay oi ceva Fn cue DETAIL A wou 1 MATERIALS AND FINISHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS. AND SPECIFICATION. 2 BANOS TO BE FIXED ONTO BOX BY MEANS OF BLIND RIVETS, 3 DISTANCE BETWEEN INSULATION AND FLANGE TO BE BOLT LENGTH + 30mm, ‘Stichting Isolaie Nederlandse ndustale a) 1m ° HEAT INSULATION gw cies INSULATION/FRUSHING DETAIL 99-07-02 VERTICAL TOPSIE, eQUPMENT NOZZLE T Lb DETAIL A note SEE OETAL A Mateo FOse 108 THICRNESS| 200m REF. NOTE 2 SULA ‘SEE DETAIL 8 _ | SELFTAPPERS 1 MATERIALS. AND FINISHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECICATION 2 DISTANCE BETWEEN INSULA ON AND FLANGE TO BE BOLT LENGTH + 30mm. Stichting Isolate Nederlandse Industrie HORIZONTAL AND VERTICAL BOTTOMSIDE EQUIPMENT NOZZLE ae HEAT INSULATION a re (ini scustovrasing cers, sna SELETAPPERS SEE OFTAL 8 nove 2 ree SEE DETAL A DETAIL A 1 MATERIALS AND FNISHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECICATION C 2 DISTANCE BETWEEN INSULATION AND FLANGE TO BE BOLT LENGTH + 30am Stichting teolacie Nederlandse Industrie ove HEAT INSULATION cw ase c {OPERATING TEMPERATURE FROM 20% TO 180) FOR RAINWATER SHIELD SEE 45.07, OETAL C “ANG 901 FOR TANK ROOF SEE 4507 q ~oR SYSTEM BUILO UP ‘45.01 AND ‘902 a6 SLAB_WSULATION MATERIAL STAINLESS sTECL STORY. BANOS SEE NOTE 3 FoR WELDED (CONSTRUCTION see usar FOR PROTRUSIONS SEE 505, 4.506 ‘ni nate 2 FoR SUSPENSION CONSTRUCTION FOR FINISHING CETAILS. a a J Mawoue se 420 OVERVIEW {MATERIALS ANG FINISHNG IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND_SPECFFICATION 2 PROTRUSIONS FINSHED WITH FLAT SHEET, IW FIXED OR FLEXIBLE EXPANSION CONSTRUCTION, SEE 65.05 AND 4.506 PROTRUSIONS IN Tie BOTTOM TANK WALL RING SHALL BE LEFT UNNSULATED THERE IS A POSSIBLITY OF WATER INGRESS, 3 OSTANCE BETWEEN STORM BANDS, OM SOxD.Sum, MNMAL 1 PER SHEET HEIGTH, FOR SHALLER TANKS STORY SAMOS OM. 25x0.Sam, Stichting teoltie Negeriandce Industrie oT oo HEAT INSULATION an use GASKET FOR THERMAL DSSCONNECTION 4 = at asker For GALVANC DISCONNECTION - Focran @ SPACER vi Ww WYO oe FASTENING PROFLE WELONG OR POP_RIVETS Crore 1 MATERALS AND FRISHING IN Ai 2 FOR OETALS A AND B, SEE DANCE WITH INSTALLATION INSTRUCTIONS AND. SPECIFICATION SPECIFICATION 13.04, SUB. 4.012 Stichting Ielate Nederlandse Industrie etc HEAT INSULATION cw 4502 C FOR TANK WALL/TANK ROOF EDGE TAN ROOF RAINWATER SHIELO See ut [— cLabons TAN ROOF EDGE OF NON-INSULATED ROOF SULATION MATERIAL vara 4 ane war C_ootuso sieer TZ CRDONE a arena SAL mate vawaxr 2 Nou 1 MATERIALS ANO FINISHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECICATION Stichting feolatie Nedertandse Industrie one HEAT INSULATION cm 45.03 anas| DeTAN A S_ASTENNG SEETAPPER 20 CIE. More 1 MATERIALS ANO FINISHING IN ACCORDANCE WITH STALLATION NSTRUCTIONS AND INSTALLATION 2 FASTEN BAND TO SPACER WITH POP RIVETS (NOT SHOWN oT e HEAT INSULATION cw aso C TH A OMETER 2 UTSIDE SUSPENOING SYSTEM FLAT/SHEET CLADONG Cc ] Sy STRAPS AROUND ISOLATION SUBS FASTENING STRIPS atid H suspesion STRIP ‘ox RAINWATER SHELO OF THE TANK “eTAOONG. STORMBANO, FASTENING STRIP WiTHOUT SPACER FASTENNG SIRE, Th SUSPENSON STRIP Nore 1 MATERIALS AND FINISHING IW ACCORDANCE WITH INSTALLATION INSTRUCTIONS ANO_ SPECICATION, Stichting teottie Nederlandse Industrie oT ie HEAT INSULATION cm ass C ORIZONTAL. CONNECTION FIXED PROTRUSION PLATES BACK FACE/ERONT FACE BACK FACE SECTION A-A PROTRUSION OLA: TaN Wat. FRONT FACE NK WALL PROTRUSION PLATE Noe NATERIALS ANO FINISHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND. SP% ALLOW 500m CLEARANCE AROUND NOZZLE FOR INSPECTION PROTRUSION PLATE FITTING AROUND NOZZLE PROTRUSION PLATE OVERLAP 250m, OVERLAP PROTRUSION PLATE HORIZONTAL % CORRUGATION/PROFILE, VERTICAL =S0am FOR FLAT SHEET CLADDING, SEE 42.09. Nederlandse industrie C mi HEAT INSULATION om 4506 INSULATION-FRISHNG ETAL FOR TANKS zaco-sitt ORIZONTAL, CONNECTION ‘A. rvenece pRoTRUSDN PLATES. BACK FACE/FRONT FACE TT ‘SECTION AA BACK FACE ANWATER COVER SEALING PLATE Nop gout, Seat PLANE vos STR. | Jexorausow euate Nor THROUGH SEAL PRT sor, MATERIALS ANO FISHNG WL ACCORDANCE WITH NSTALLATION INSTRUCTIONS AND SPECKICATION ‘ALLOW SSoam CLEARANCE AROUND NOZZLE” FOR INSPECTION. PROTRUSION PLATE FITTING AROWNO NOZZLE, SHALL BF ABLE TO MOVE FREELY N GUONG STRIPS PROTRUSON PLATE OVERLAP 500m + EXPANSION. OVERLAP PROTRUSION PLATE HORZONTAL 1 CORRUGATION/PROFLE, VERTICAL 2500. FOR FLAT SHECT CLADONG, SEE 4.209, (ir s HEAT INSULATION c mM INSULATION-FONSHING DETAILS FOR TAN RODE cel SHEETING ARRANGEMENT 1 or cover SEE ON 4500 peta DETAL_A: OTA INSULATION CLADDING Anchoring sheeting to_ spiral. Detail A DETAIL _C SECTION SHEETING ROOF EDGE FINISHING cures Ce ered MIEW a. noPSte PLATE) ea RSaP pare DETAIL COVER set nore } cena ly yt (ee nove 3 ‘SCE NOTE pawwater snero e0se7” [See Nove 5 (Co mategiats_ an en IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECIFICATION TAKIUH 'sérsING WW FULONG. PACING + OEPENONG ON TAN. OMMETER, GUT HINMUM 15 mn 7 Maxie WUMGER OF SCREWS, CTC. 100mm, WITHOUT OEFORMING THE SHAPE OF THE COVER 5 INTERCONNECTION AT BOTTOMSIDE NOT WATERTIGHT ALLOWING ORAINAGE. os) HEAT INSULATION fe ( TID] sswsvovcrnsin cerns cor rc noe Sanh SHEETING ARRANGEMENT 2 fr RAILING __ VERTICAL PROTRUSION SEE 4260 SEE 4.207 DETAIL _C_SECTION OETAL_O ROOF EDGE FINISHING SEALING AT TOPSIDE OF SHEETING RAIN covER SECTION D-D hn Nate Cr watemm.s AND pusHNG 1 ACCORDANCE WITH NSTALLATION NSTAUCTONS. AND SPECICATION 2 MAXIMUM SETTING IN FOLDING. MACHINE 3 DEPENDING ON TAN DIAMETER, GUT NINKUM 15 nn, 1 Sixtus NUMBER OF SCREWS, CTC. "NO nm, WITHOUT DEFORMNG THE SHAPE OF THE COVER 5 INTERCONNECTION AT’ GOTTOMSIDE NOT WATERTIGHT ALLOWING. ORANAGE Stichting Isolate Nederland Industrie a f AN RAMWATER sietLo COG CLAO HEAT INSULATION ot ts SHEETING ARRANGEMENT 3 DETAIL ‘SHEET BENDING PATTERN (ORAWNWiTHOUT RAN COVER) DETAL_C SECTION ROOF EDGE FINISHING DETAIL COVER SEE_NOT: ye Gee vote s Lste_vore 4 VAINWATER_ SH nove § [nn \ see note 5 WATERALS AND FINSHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECIFICATION, 2 MAXIMUM SETTING TN FOLOINS, MACHINE 5 OLPENOWG GN TANK. DAMETER, BUT NINMUM 15 ao, 4 maximus NUMBER ‘OF SCREWS, CTC. 100 rp, WITHOUT OEFORMING THE SHAPE OF THE COVER, 5 INTERCONNECTION AT SOTTOMSIOE NOT WATEATIGNT ALLOWING DRAINAGE. Stichting tsolatie Nederlandse Industrie elo HEAT INSULATION cm 45:0 c (ini 1 ae aren TOPVIEW 8 itn reveravecs 03! ¢ HN avers i i & ~ snesenen 200 /f_| fomer® |? Stee SECT SeLeTAPPERs 1 ' VENT woues SEE NOTE 2 Mr HOLES, muLeo cost thro m & ee RAISED EDGES. ' apf =e GER sins |__JLiz CTL Fae nade SEEMS Al 225m OVERLAP 210mm « Severanvens, ow SLND RIVETS nove {MATERIALS AND FINISHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS ANQ_ SPECIFICATION 2-TOP COVER WITH SLOPE ie Stichting tuolatle Nederlandse Industrie NOZZLE PROTRUSION - VERTICAL aa HEAT INSULATION Mini ae ee DETAIL NOZZLE PROTRUSION PEREQRATEO SHEETING FOR VENTILATION Iysuaniog C sens ta9e Hens INS_TAPE AEE ore Cs watemais ano sins wv ACCORDANCE WITH STALLATION RSTRUCTONS AND SPECFICATION Stichting tsolasie Neéerlanése industri HEAT INSULATION a coos € FemavAgce Ox FOR. PUMP Suro we oes ene wt che, pcs INsuLaTiON ‘Taeeness Otte a QUCKRELEASE TOGGLE HOLE FOR, ‘to “Rivers: Se OETA FoONG CUP DETAIL A ee. ore 2 C1 i) nove 1 MATERIALS. AND FINISHING IN ACCORDANCE. WITH. NSTALLATION INSTRUCTIONS. AND SPECIFICATION. 2 OISTANCE: BETWEEN INSULATION AND FLANGE TO BE BOLT, 1 REE NOTE 2 totale Nedertandse Industrie ate HEAT INSULATION an C TAO WALLIROGE CORRECTION WITH RAMWATER StELO | mr rh ih L | —anuns i | ' NW I rogwotasuarea | | | | Ab roe soar . F. RAIL i QUTSIDE TANK RODE q ance mo | | MLTR A | awe rook ET Hy [ tHE Sasa 4 avens mow | ~~~ AL aan waren TELE compos waaay I sao \ corres sveroRtING STAB win ‘ie non ANGLE THICKNESS Senmeknn vane wa SEE NOTE 2 SEE NOTE 2 Cc Set NOTE 2 ote | MATERIALS ANG FOVSHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECFICATION. 2 INSULATION THICKNESS + CLAODING + 10mm, 3 RAINWATER SHELO TO BE INSTALLED ALONG FULL. CIRCUMFERENCE. MATERIAL OF RARWATER SHIELD SAME AS FOR ANGLE IRON eT 6 HEAT INSULATION ce uae m1 MECHANICAL ENGINEERING DETALS 2000-41-01 c fon TAM WALL SUUATIN SYSTEM Bout mur mi ce - ALTERNATIVE ‘SUSPENSION AY.UP SIRI, NOTE 3 EASTENNG STREP CENTRE TO CENTRE 1500 MAX. \. \. WALL-SIDE SUSPENDING SYSTEM C MATERIALS AND FINISHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECIFICATION. 2 BEND THE LIP OF SPACER CLIP AT RIGHT ANGLE QURNG INSTALLATION 3 THE LAY-UP STRPS CAN BE FIXED BY WELONG/BOLTING Stichting Ieottie Negeriandee Industrie oe HEAT INSULATION cm 4,993 MECHANICAL ENGINEERING DETAILS 2000-41-08 FOR TANK WALL INSULATION SYSTEM ANGLE RON ARC WATER”SAIELD TANK WALL SUPPORTING, HRP ininal Seb TANK Wa SUSPENSION HOOK WELOED #12 SEE NOTE 3 SUSPENSION STRIP CHC. 2000 MAX TIE MAK EAATON MESS a4) OUTSIDE SUSPENDING SYSTEM Noe MATERIALS ANO FINSHNG IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECIFICATION, SPACER: FASIEN WITH POP RIVETS/BOLTS AND NUTS. END SUSPENSION HOOK OVER AFTER INSTALLATION, THE LAY-UP STRIPS CAN SE FIXED BY WELDING/BOL TING, Stichting Isolate Nederlandse Industrie oc HEAT INSULATION a a308 ml MECHANCAL ENGNEERING DETAR SUSPENSION STRP 2990-11-01 Cc Fo TANK WALL MULATION SYSTEM oo AE tt ae ol a Se, el tet 7 EASTENNG STRP_ 4 HR hf A DETAIL A Nx 1500 \\ \ 1500 1500 C E At. anh 2 sous, fa { suseaio_stae ha} sore (1 MATERILS AND FRESHING WY ACCORDANCE WITH ASTALLATION RSTRUCTIONS AND. SPECICATION V Stichting Isolate Nederlandse Industrie HEAT INSULATION ou ues int MECHANCAL ENGNEERNG OETALS mooteen Tian WALL SATIN SYSTEM CLANOING_sPrING 2 ETAR A ‘OUTSIDE. SUSPENONG SYSTER LFASTENNG_STRP_3033 CLAMPING BOLTS, STALLSIOE” SUSPENOING SYSTEM EASTEWNG STRIP CLAMPING SPRING (SEE NOTE 3) CLAMPING BOLT FASTENING S| (SEE NOTE 2) ore 1 WATERIALS AND FINSHING AY ACCORDANCE WITH NSTALLATIN ASTRUCIONS AND SPECFICATIN 2 WAILSDE SUSPENSION SYSTEM. THE FASTENAG STAD 1S NSTALLED. ALONG CS oursine suseensin SYSTEM THE FASTENRG STP IS WSTAL THE BWLATON, THE TANK WALL £0 AT THE QUISOE OF cara HEAT INSULATION Uni ee ey TANK WALL INSULATION INSULATION THICKNESS ad SPACER_CLIP MATERIAL THICKNESS 2am COWECTON S18 SLND wil CENTER Pa EASTENNG PROFLE FASTENING PROFILE + CONNECTION STRIP non Co, MATERIALS NO FISHING ACCORDANCE WITH STALLATION NSTRUCTONS ANO SPECICATION elo HEAT INSULATION cw 49.07 clini Petite, ENREERNG OTA al ANCHORING SPIRAL bom WN SPIRAL ‘WELDED TO THE ROOF PATERIAL SPIRAL IDENTICAL (WITH TANK: ROOF” MATERIAL SECTION sox Cs raTemats ana PNSHING IN ACCORDANCE WITH RSTALLATION NSTRUCHIONS AND SPECCATIN 2 TEMPORARY SPACE: STR 3 am TAK, REMOVE AFTER ELON: ciniass0 di HEATINSULATION -Machenial ergeneingdotais 2011-10-01 Lugs for Insulation supports 7 HEAT INSULATION “ (ni Monn seme te mea NAMPLATE. SUPPORT C REF. NOTE 2 nox, {1 MATERIALS ANO_FIUSHNG IN_ACCOROANCE WITH INSTALLATION INSTRUCTIONS AND_ SPECIFICATION, 2 SUPPORT LENGTH EOUALS INSULATION THICKNESS.» 5mm (7) SPORT MATERAL SANE AS FOR EOUPHENT ele Gini HEAT INSULATION ou 42 MECHANICAL ENGINEERNG DETAIL 2000-11-01 MOUNUM STANCE” BETWEEN INSULATION SYSTEM |ANO SUPPORTING BEAMS. SUPPORTING BEAM REF, NOTE 2 Nore | MATERIALS AND FINSHING IN ACCORDANCE WITH INSTALLATION INSTRUCTIONS AND SPECIFICATION, (CU MCEARANCE NHUR" Soma FOR PROPER MSULATION APPLICATION. y ¢ ail HEAT INSULATION INSULATION/INSHING DETAIL FLEXIBLE JACKETING-oRP OVERLAP METHODE ayer.ap inate) INSULATION HATERIAL ore JACKETING NNSULATION Nore 3) SECTION A-A 1 WHEN MINERAL WOOL IS APPLIED, THE MATERIAL SHALL HAVE A (FACTORY) ALUMINIUM FOIL FACNG 2 WHERE POSSIBLE THE OVERLAP SHALL GE STAGGERED AT THE 4 AND HOUR POSITIONS IF NOT POSSBLE THE OVERLAP SHALL BE STAGGERED AT LEAST 70. mm 3 DRAIN HOLE TO GE INSTALLED ONE PER MAX. S LINEAR METER STRAIGHT PIPE RUN AND AT THE BOTTOMS OF ELBOWS AND CONNECTIONS. mM HEAT INSULATION Let «60.02 INSULATION/FaNSHNG_ DETAIL 20-10-01 FLEXIBLE JACKEEN-GRP OVERLAP METHOOE > BUTT JONTS METHOD nate 2) INSULATION MATERIAL TE 1 (GRP JACKETING GRP STRP InsuLarion GRP JACKETING INSULATION PPE craw pe oom) ore 3) 8 WON AzA BUTT JOINT SECTION 8-8 erg Cc 1 WHEN MINERAL WOOL IS APPLED, THE MATERIAL SHALL HAVE A (FACTORY) ALUMONIUM FOR, FACING, 2 WHERE POSSIBLE THE OVERLAP SHALL BE STAGGERED AT THE 4 AND @ HOUR POSITIONS F NDT POSSBLE THE OVERLAP SHALL BF STAGGERED AT (EAST 70 mm 3 DRAIN HOLE TO BE INSTALLED ONE PER MAX. S LINEAR METER STRAIGHT PIPE RUN AND {AT THE BOTTOMS OF ELBOWS: AND. COMNECTIONS. ¢ stihting Commie Toate Nederlandse Industrie (ni HEAT INSULATION a 4.69.03 C DNSULATON SHINS ETA 2010-01 Lexie JCKETING ore» | seouence iF aePuicaTion wore {WHEN MOWERAL WOOL 15 APPLED, THE MATERIAL SHALL HAVE A (FACTORY? ALUMINIUM FOL FACING ye Ge ini HEAT INSULATION can sons INSULATION/#WSHONG DETAR, 2010-10-01, Cc NSULATION RP sacKeTNG AT LOWER SDE © ‘nm c eur JowT ae woth SECTION A-A 1 WHEN MINERAL WOOL IS APPLED, THE MATERIAL SHALL HAVE A (FACTORY) ALUMINIUM FOL, FACING C ching Commies late Nederandee Industrie INSULATION/FaNSHING OETAR, 2010-10-01 FLEXIBLE JACKETING-cRP EXPANSION JON” HORIZONTAL PIPELINES sraae raze, coun wor ore stetve Prep Are ste? LORP JACKETING + ADHESIVE INSULATION MATERIAL —= (ni HEAT INSULATION ta sans (e WAX. 19am (NOTE 29 a0 PANSION JOINT WITH GRP STRAP METAL SLEEVE RP JACKETING — ORAM HOLE # ‘0mm RP STRIP, 30-S0em MAX. tone (NOTE 2) TO HOO” SLEEVE XPANSION JOINT WIT nore, 1 WHEN MINERAL WOOL IS APPUED, THE MATERIAL SHALL HAVE A (FACTORY) ALUMNIUM FOL FACING 2 MAX. EXPANSION JOWT TO BE APPLIED N CASE OF MAJOR LOCAL MAXPAM AND MINPAM. AMBIENT TEMPERATURES DIFFERENCES C3 SRBC SLEEVE, THEMESS 3 m0 toting Commies leolaie Nederlandse Industrie ini HEAT INSULATION tm uses [NSULATION/FINSHING DETAIL 2ra0-19-01, Cc FLEXIBLE JACKETING-GR? EXPANSION JONT IN VERTICAL PRELNES th | | | OVERLAP GRP AND ETAL, SLEVE Sen Mo METAL SLEEVE STRAP i GaP JACKET —¥ax_ 1000 (wove 2) wsicaron vatetn—/ |! oe —/S C EXPANSION JOINT WITH METAL SLEEVE sor 1 WHEN MNERAL WOOL IS APPLE, THE MATERIAL SHALL HAVE A (FACTORY) ALUMINIUM FOR. FACING 2 MAX, EXPANSION JODT TO BE APPLED IN CASE OF MAJOR LOCAL MAXIMUM AND. MIOHUM AMBIENT TEMPERATURES DIFFERENCES ¢ _tiohtng Commies IelaieNeerlandee Industrie . dni HEAT INSULATION von Cc INSULATION/FINISHING DETAIL 2010-10-01 FLEXIBLE JACKETING-CRP INSULATION TERMINATIONS AT PROCESS TEMPERATURES (« 90°C) GRP sAcKeTING INSULATION MATERIAL. ——, [> GRP EL. | oa sacKeTiNs a PIPE HORIZONTAL L OVERLAP 30-SOnm GRP IRCKETING OVERLAP 30-S0nm AN, | cae sacxerons I isucaTion MATERIAL PIPE_VERTICA ore 1 WHEN MINERAL WOOL IS. APPLIED, THE MATERIAL SHALL WAVE A (FACTORY) ALUMINIUM FOIL FACING tihng Commis ntti ederondse Indu ini HEAT INSULATION ‘CM ¢ 60.08 TNSULATIONNSHING DETAL 2070-10-01 Cc FLEXIBLE. JACKETING G2, INSULATION TERMINATIONS AT HIGH PROCESS TEMPERATURES (+ 90°C) GGRP_JACKETING METAL CAP ENO. I STP wore 2 INSULATION MATERIAL —— HT PASTE (NOTE 2) se 30-S0em Cc STRE WNOTE 3) HI PASTE (NOTE 2) METAL CONE COVER WA OVERLAP 30-Sonm| W J sap snceerns | wsunarion maveRiat WA q PIPE VERTICAL Note 1 WHEN MOVERAL WOOL IS APPLICD, THE MATERIAL SHALL HAVE A (FACTORY) ALUMIMUM FOIL FACNG. 2 AT PROCESS TEMPERATURES BETWEEN 90 - TIS*C JONNT TO BE SEALED WITH FLEXIBLE HT PASTE AN ACCORDANCE WITH CMI 2250123 13 APPLY STRIP FOR PROTECTION OF CORROSION PROTECTION LAYER ¢ (GUAS FlgRe” BAND OR PACKING HATERAL CEPENDING ON PROCESS. TEMPERATURE) Siting Commies lati Meranda ini HEAT INSULATION ct cass Cc NSULATION/FNISHING OETA zeve-0-0 ~ FLOALE YACRETING CAP MONCRENOVABLE FLANG BOX WITH SWGLE AND OOUBLE OVERLAP SINGLE OVERLAP «ore 2 SRP JACKETING ‘OVERLAP Sa-Stmm suarioy 68? JACKETNG. a DORAN HOLE dt LoweR Ses toan SECTION A-A DOUBLE OVERLAP. ore 3 eee rene fh cE — gene SEAL sTRP- AFTER INSTALLATION ‘GRP STR 30-S0m FLANGE BOX + GEL "| ow voce INSULATION GaP el. SEAL sTRES ‘ AETER INSTALLATION co FLANGE” BOX GEL RAN HOLE. AT LowER ide" ® "oma, ‘SECTION B-B yore 1 WHEN MINERAL WOOL IS APPUED, THE MATERIAL SHALL HAVE A (FACTORY) ALUMINIUM FOIL FACING 2 SINGLE OVERLAP TO BE APPUED' AT SMALL DIAMETERS PES, UP TO 4! DOUBLE OVERLAP TO BIG GIAMETER PPE. ic _Aiohting CommisieIolati Nederlandse Industrie ni HEAT INSULATION au sense [NSULATION/ANSHING DETAR 2a00-10-01 FLEXIBLE JACKETING-GR? NOW-REMOVABLE” VALVE BOX nore 2 (RP JAcKETING RAN HOLE | Lower Soe mm OVERLAP 3S GRP. STAP_30-50h0 Re sackeTING GRP. JACKETING RP et 1 ie seat sine AFTER INSTALLATION (oF FLANGE'BOX' GEL RP EL: ‘SECTION A-A ‘SECTION A-A. AT SMALL DIAMETERS AT BIG DIAMETERS wore 1 WHEN MINERAL WOOL IS APPLED, THE MATERIAL SHALL HAVE A (FACTORY) ALUMINUM FOIL FACING. 2 DEPENDING OF PROCESS TEMPERATURES JONT TO BE SEALED WITH FLEXBLE HT PASTE IN ACCORDANCE WITH CNL 225.01-2.9 OR GRP. STRIP (

You might also like