REVANTHA SERVICES PRIVATE LTD
Doc No.: CL CT 02 A
Ref.: ISO 9001 : 2015
DEPARTMENT QUALITY MANUAL - CONSTRUCTION clause – 8.5
CHECKLIST – FORM WORK (VERTICAL MEMBERS) Sheet: 1 of 1

VENDOR: _________________________________________________ DATE: ______________

PROJECT NAME: _______________________________________ LOCATION: _____________________

Sl. Aspects to be answered/covered Yes/No Remarks


1. Level of Sab/Beam/Column/Shear wall/Concrete walls from proper
reference level
2. Are all the plates/ply woods cleaned and polished property
3. Type of oil/polish used on the surface of shuttering
4. Check for suitability, stability, safety& rigidity of assembled forms

VERTICAL MEMBERS-Columns, shear walls, starters etc..,


1 Check alignment of all vertical members at floor level with respect to
grid lines
2.
Check plump for vertical members (mi. Two sides)
3.
Check right angle and diagonals of the vertical member from the top
4.
Check for alignment with respect to adjacent vertical members
5.
Check for adequate support as per shuttering design
6.
Check for adequacy of cover block
.
DE shuttering
1.
Check for DE shuttering time after concreting as per the specifications

2. Check the condition of shuttering assembly


3.
Clean, oil and stack shuttering materials for future use

*Observation & Comments:

Approved __________

Vendor Representative Site Engineer Quality Control