APRIL 2008

GANG-NAIL GUIDELINES No.130

WET WEATHER WARNING FOR BUILDERS


The past few months have seen rain By SUNIL NARSEY
control system safeguarded his
reputation by documenting all
return to many parts of the country Senior State Engineer
MiTek Australia Limited inspection checks in the production
and whilst that brings relief, it is also
process, as well as photographing
a timely reminder that the changing
the completed packs along with the
weather conditions can have an builders and fabricators can well do date of despatch from the yard.
adverse affect on roof trusses if they without.
are left exposed to the elements for In the event of any dispute, the
any extended length of time. A fabricator I know recently noticed fabricator had all the systems in place
on an unscheduled visit to a building to ensure his protection. The
An example of such a situation is site that some of their trusses, which message for builders and fabricators
one where the trusses and frames were delivered about four months is twofold.
have been left uncovered on site earlier, had just been installed after For builders, it is imperative that
during construction delays, having been left exposed to the when trusses or frames are delivered
sometimes for many weeks and elements for that entire period. on site, immediate action is taken to
possibly months.
The fabricator conveyed his cover and protect them if they are not
When the job recommences, the concerns to the builder and advised going to be installed soon after.

builder commonly neglects to have


the trusses and wall frames checked
by the truss manufacturer or
engineer.
It cannot be ignored that when a
house frame is subjected to
excessive and prolonged exposure to
sun and rain, any or all of the
following may occur: the timber
components may distort, split and that the trusses should be inspected A tarpaulin or other similar weather
even suffer fungal damage; the by an engineer since there was proof material is suitable provided
nailplates in trusses may corrode and evidence of severe weathering. allowance is made for adequate
back out; the trusses may lose their A full and detailed report of the ventilation. Please refer to Gang-Nail
shape and camber and may suffer truss condition and any Guidelines No. 92 “Proper Storage of
greater creep deflection under service recommendations for rectification Trusses” for more detail on this
than expected. would be required. subject.
Cladding and lining a defective In essence, roof trusses in a For fabricators, it is important to
structure is akin to sweeping dirt weathered state should not have ensure that your documentation and
under the carpet; it is a disaster been installed in the first place quality control systems are up to date
waiting to happen. without appropriate examination. and can withstand scrutiny if the
The builder risked forfeiting his need arises.
When structural movement (or
worst still collapse) occurs, the truss warranty automatically had he It is essential that everyone
subsequent ramifications of an inquiry simply finished off the house without understands the destructive effect
into work practices, of liability for sourcing any professional help to prolonged weather exposure has on
rectification and, in the unfortunate rectify this issue. frames and trusses so that
instance, of injury to a third party and Fortunately, as part of their normal appropriate preventative measures
possible criminal charges for operating procedure, the fabricator’s are taken before undesirable and
negligence, are all predicaments manufacturing and delivery quality costly damage occurs. A