The past few months have seen rain By SUNIL NARSEY control system safeguarded his reputation by documenting all return to many parts of the country Senior State Engineer MiTek Australia Limited inspection checks in the production and whilst that brings relief, it is also process, as well as photographing a timely reminder that the changing the completed packs along with the weather conditions can have an builders and fabricators can well do date of despatch from the yard. adverse affect on roof trusses if they without. are left exposed to the elements for In the event of any dispute, the any extended length of time. A fabricator I know recently noticed fabricator had all the systems in place on an unscheduled visit to a building to ensure his protection. The An example of such a situation is site that some of their trusses, which message for builders and fabricators one where the trusses and frames were delivered about four months is twofold. have been left uncovered on site earlier, had just been installed after For builders, it is imperative that during construction delays, having been left exposed to the when trusses or frames are delivered sometimes for many weeks and elements for that entire period. on site, immediate action is taken to possibly months. The fabricator conveyed his cover and protect them if they are not When the job recommences, the concerns to the builder and advised going to be installed soon after.
builder commonly neglects to have
the trusses and wall frames checked by the truss manufacturer or engineer. It cannot be ignored that when a house frame is subjected to excessive and prolonged exposure to sun and rain, any or all of the following may occur: the timber components may distort, split and that the trusses should be inspected A tarpaulin or other similar weather even suffer fungal damage; the by an engineer since there was proof material is suitable provided nailplates in trusses may corrode and evidence of severe weathering. allowance is made for adequate back out; the trusses may lose their A full and detailed report of the ventilation. Please refer to Gang-Nail shape and camber and may suffer truss condition and any Guidelines No. 92 “Proper Storage of greater creep deflection under service recommendations for rectification Trusses” for more detail on this than expected. would be required. subject. Cladding and lining a defective In essence, roof trusses in a For fabricators, it is important to structure is akin to sweeping dirt weathered state should not have ensure that your documentation and under the carpet; it is a disaster been installed in the first place quality control systems are up to date waiting to happen. without appropriate examination. and can withstand scrutiny if the The builder risked forfeiting his need arises. When structural movement (or worst still collapse) occurs, the truss warranty automatically had he It is essential that everyone subsequent ramifications of an inquiry simply finished off the house without understands the destructive effect into work practices, of liability for sourcing any professional help to prolonged weather exposure has on rectification and, in the unfortunate rectify this issue. frames and trusses so that instance, of injury to a third party and Fortunately, as part of their normal appropriate preventative measures possible criminal charges for operating procedure, the fabricator’s are taken before undesirable and negligence, are all predicaments manufacturing and delivery quality costly damage occurs. A