Professional Documents
Culture Documents
AB Machinery and Mechanization Engineering
AB Machinery and Mechanization Engineering
Exercise No.: 4
PLANTING EQUIPMENT
I. OBJECTIVES:
A. To know the construction and parts of seeding equipment.
B. To perform calibration of seeding equipment.
II. MATERIALS:
III. METHODS:
DATA GATHERED
Settings Trial 1 Trial 2 Trial 3
1/4 t = 12.6 s t = 12.67 s t = 11.81 s
Drum 1 = 39.47g Drum 1 = 37.28g Drum 1 = 39.70g
Drum 2 = 32.66g Drum 2 = 33.66g Drum 2 = 35.11g
1/2 t = 11.11 s t = 12.15 s t = 14.43 s
Drum 1 = 36.50g Drum 1 = 36.81g Drum 1 = 40.89g
Drum 2 = 27.35g Drum 2 = 30.82g Drum 2 = 34.34g
3/4 t = 12.6 s t = 12.99 s t = 13.28 s
Drum 1 = 31g Drum 1 = 29.25g Drum 1 = 31.49g
Drum 2 = 23.81g Drum 2 = 22.87g Drum 2 = 30g
Full t = 13.21 s t = 14.72 s t = 12.89 s
Drum 1 = 20.26g Drum 1 = 25.57g Drum 1 = 26.73g
Drum 2 = 15.61g Drum 2 = 18.5g Drum 2 = 19.05g
Computations:
0. o 254 m
d= ᴫD = ᴫ x 6 in x
¿
= 0.48 in/row
S= ᴫ x 6 WD X 10
=ᴫ X 0.57M X 10
= 18.22 m
A= w x s
= 1.92 x 18.22
= 34.84 m2/pass
Table 3
Adjustmen Discharge/10 rev
t (DRUM 1 + DRUM 2)/2 = Discharge per trial
1/4 T¹ = 35.87 g T² = 35.47 g T³ = 37.40 g
m2
10,000 m2
ha 10,000
0. 03547 kg x ha
34.83 m
2
0.03740 kg x 2
34.83 m
¿ 10.25 kg /ha
¿ 10.74 kg /ha
1/2 T¹ = 31.93 g T² = 33.82 g T³ = 37.62 g
2
m2 m
10,000 10,0000
ha ha
0. 03382 kg x 0. 03762 kg x 2
34.83 m
2 34.83 m
¿ 9.71 kg /ha = 10.8 kg/ha
kg/ha
3/4 T¹ = 27.41 g T² = 26.06 g T³ = 30.75 g
m2 m2
10,000 10,000
ha ha
0.02606 kg x 0.03075
2
kg x 2
34.83 m 34.83 m
¿ 7. 48 kg /ha = 8.83 kg/ha
Full T¹ = 17.9 g T² = 22.04 g T³ = 22.89 g
2
5.14 kg/ha m
2 10,000
m ha
10,000 0.02289 kg x
ha 34.84 m
2
0.02204 kg x
34.83 m 2 ¿ 6. 57 kg/ha
6.33 kg/ha
Table 4 : Time Spent/10 rev
Time Trial 1 Trial 2 Trial 3
1/4 12.6 s 12.67 s 11.81 s
1/2 11.11 s 12.15 s 14. 43 s
3/4 12.60 s 12.99 s 13.28 s
Full Setting 13.21 s 14.72 s 12.89 s
Chart Title
12
10
0
one-fourth one-half three-fourth full setting