eter No: TPL/UI/ES/QMD/86 ote: 24 May 2022 [M/S FS india Solar Ventures Pivate Limited Solar PV manufacturing tacit, SIPCOT nous Ps, Pilcipatco, Tami Na nc, Through Savils Property Services nfo] Put Ld, Chena Kind An: Me. Atulazhagan V, General Manager Project: Solar PV manufacturing faci, SIPCOT Indust Pork, Pllaipakkom, Tar Nadu, Subject: Submision of Method Statement for instalation of HI/LT Coble laying and Termination Doar si, With Reference to Subject matter please enclosed herewith follwing document, for your Information and record. No Description MS Document No Remark Method Statement for 1 | Insolation of HILT Cable | PL/UIS70057/GMD/MS/99, Rev. | ying and Termination | NO* RO | Thanking You and essing you our best service always, Fot TATA PROJECTS UMITED Tota Projects Liitod ‘TATA PROJECTS LIMITED Reghered ole: One Boulevard 2,348 foo, Lake Boulevard Steel, Powol, Mumbol~400076 Tel 91226740 2700 Fox + 91226740 2960, Mat jpmumbalatalproects.com wr dctopoietscom ‘to Oe: Tat ret Lt Slr PY marefacxng ny, SPCOT neti Par Ppa Sipebu, arctan 05 fa na 5 Solar PV Manufacturing Fality Project e TEATA PROJECTS | MetiodSutementfornsaltion ol MAT le — Sec ‘avingand Termination Fist Slo "HUES TOST/ COND /MSTMEEPIS Revd Page Lof 10 METHOD STATEMENT FOR INSTALLATION OF HT/LT CABLELAYING AND. ‘TERMINATION Doc No: TPL/UI-670057/QMD/MS/MEP/39 FS Solar PV Manufacturing Facility Project Pillaipakkam, Tamil Nadu, India j2o22| Ro boa! Date er 5 wy I Pewoon| [aan] | od Lar [ae] ad Past Pwr mae | nana [oma | rer | me name | were | gg | ssn | sgaseenaran | sR = Se cans pastas Sign Vos Qo Date Da/s/202 96/222 Designation Project Director queso vane M coinats yevparen TATA PROJECTS smeycte 5 Solar PV Manufacturing Fality Project Method statement For instalation of HT/LT Cable ving and Termination ‘SAVIIS rest Sota - “TPIT MNS /eoNOs/Mee/ BRD Page? of 10 Table of contents Sr.No. Section Title of the Chapter Page No 1.0 Purpose 3 2 2.0. Scape 3 3-30. Reference 3 4 40. Manpower Deployment 3 5 5.0 Tools and Tackles 4 6 6.0 Work Sequence 4 7 7.0. Procedure 5 8 8.0 Mandatory Safety Requirements ° 9 9.0 Documentation u 30300 Attachments 1 erected ee ela rarer a "PI7UTE70057/QMO/RS/MEP/39 Rex 1.0 PURPOSE ‘The purpose of this procedure Is fr supervision of installation of HT/LT Cables laying work to ‘ensure that proper quality controls exercised at site. 20 SCoPE “This "Method Statement” covers the on-site installation and inspection of HT/LT Cables laying work t MRSS, SS-1 to S5-7 and factory Building. 3.0 REFERENCES: 3.1. Approved Project Quality Assurance Plan, 3.2 Approved GFC/Shop Drawing. 4.0 MANPOWER DEPLOYMENT: 1 [Ste Engineer 2 | Superisor 3 [raw | a | safety 5 | auaty (FOE) 7 | Eleetician 8 | Semiskled labour orien 10 | Unskled labour FS Solar PV Manufacturing Facility Project laying and Termination ‘TATA PROJECTS Since TPAVUTS70057 OND NAS /MEP/IS RED Page 4 of 10 5.0 Tools/ Tackles: [Si] Gablejack 32 | Hammer 53 _ | Ladders & Seafoldings ‘Sa | Measuring Tape 55 | Roller [36 [Megger ackeaw frame with blades | chor Fasteners 6.0 Work sequence: ean 12 Receiving, Storage & Handling of Cable Drums. Procedure for Laying of Cables. ‘+ Verifeation of able run layout and cable schedule. + Unciting and laying of ables ‘+ cable Laying Through Trench/Bured ‘Cable joloting Termination & Testing of Cables. FS Solar PV Manufacturing Facility Project TATA PROJECTS | —Methodstatement For instalation of HT/LT cable ‘sil. laying and Termination [AV ULG70057/AM/IS/MEP/3 REO 70 Procedure for Installation of HT/LT Cable laying: 7.4 Receving, Storage & Handling of Cable rums naa | Receving |The able ums on recat at ste shal be lnteraly Ispete wirt inspection | Ske Engineer / FOE clearance (FAT, Pocing Is bb _| the cble rumssallb wsuay spect for transportation damages Site Engineer / FOE << _ | major damages are noticed potosraphs ofthe same shall be sent to super for | Se Engineer / FOE rectitentonferectve sein 4 | esti rum aamags observe during unloading the Cable dus shal be stored Site Engineer / FOE separately wth prope enfin. renser 7a | Storage & aang > ‘Ste Engineer ent Location for unload the abe drums. 1 [unencate rs by ing ane athe rere ton iene € | imun pp stodd be mane beoeen rams tact cane, | Sie tnneer ‘ stg Cables shal be storedin drums with anges ofthe cable rum invert pston 72 | Verano abe rm jou, cable sehedule and Cable dum eating schedule ‘oro commencement fae aig, the approved cable ran aout fo parlor loestion sal ue stud a able shade ate drum eting schedule shall be | _Ste Engineer prepared nd iy mentonag ype of abe, no of core andlength of bie tased on these parame the cble drum hall be selected, Site Engineer ncoting anoying of HY Tables 2 Cale Tay ite Eagneee = | sent tha cable rum as per cable schedule. ae 1b _| Before commencement oflayng of abies folowing parameter shaulbeveriea | Sie Engineer Site Engineer FS Solar PV Manufacturing Facility Project ‘TATA PROJECTS Method Statement for Installation of HT/T able Sheth Tevog and Termination “TRLUES7O0S /aMD/MS/MEP/sDRevd | Page Gat 10 RRB ig RT Ray SN Tony ap AGSTRTTESTS | be proerv ern [77 [the ama me un tnd nd way pa be an regu Sie Eneneer | |e esis of he ae by ceting a wg uae nuton | | Restnceteter te observe sal erecodedinspopefomat hem | Ste gieer | ‘tebe wth emis hen proceed Tone sage | 1 | insane rum on bea ek Ste Engineer) |_| Esoretatthe crim ntaesinthe covet retontardem atonal | ge ngage thecal intothe wench | ATang cable Role slog cable wend and near ete yao and ste Engineer | sare tat lbenno cosirs are prone ake creo {| cae ha eyepiece wna ingles wih hehe aide | eraacay {boom it eso eed 1] tan ate ec rma rum mourtedon tek sha ae im _ | Forreston, se poner mode of onion between ble um end | See engineer aaaleaendtne cab pg ton Ste trainee 1 | wre ver egies, ect nth fing or aop fates tobe ranged. = © | Temporary cal gig tobe added on oth he ends atthe tinetcabecutng. | Engineer = | {atl cad shui be sealed with rope covet | Aterca ay, res tbe aes proper ‘SizEngeer | | Ceram mide cncete wen sal be supported on able won MS ant | Senger supp ad sabe nest ranged coed Sabie damping wisps and sds stl be wed for eepne the cable | St Engineer © | pest [cae ce Boe / wt sal be of apeoprite se, sabe oe LEI HC FRS | cue engeer inl armoured M/A eb specie votage rade 7A | catia Trough Tec Bued I Ske tneneer | heck thecal oie arch perth dong ost “an ‘Chek Depth a thf the cable ench Site Engineer ‘© | Get the clearance from cul department forthe trench before laying cables —— | FS Solar PV Manufacturing Failty Project ‘TATA PROJECTS | —HetodStatenentferisalaionstMTATCANE | Guy Sots tai Teinaton z TAUTE 7057 /OME SIS BRGD Page Taf @_ | eemetote routed deh hepa arenes Ste teeer € | The cable buried underground or in readymade trench shall be at minimum 4.2m: ‘Site Engineer mee ’ seaman | ‘The cable salle lnidon 2 180mm son aor. Cableshallbestedand paced over | Ste Engineer 1 | the sand cushion. Then straightened and covered with 120 mm thick layer of Sia ger B | Lay bricks over the cables for the full length of the excavation, "ei F Ss Ls ae be et or anlage og ~ guar te Engineer i ‘Backil the excavated earth in layers and compact as per the requirement. ‘Site Engi 11 | pad erasing areas Hume pipes to be ued fr cable lying 3 er drawings. ie Eraser 1 | ete Roe Mart ont Coan Gajee | ste Enger marten || Gland €arthing to be done ‘Site Engineer mM _| Check for proper cate tags & warning tap iver | ea ee GS redae given bow FS Solar PV Manufacturing Faciity Project Method statement For installation of HT/LT Cable oe una ‘Savills Frsesotor. entre condions spr the requirements THA7UES7005?/ONA0/MS/MEP/39 Revo Page § of 10 Shales ‘Walco og 150 0 veri 150 150 sboveupto ata 200 150 shove 13 *oisouter radu ofthe able 75 | Cable joing & Termination | & | ter cate aying & Store Termination, Meager Tests To Be Carried Out aad t — bp Before ad Aer inting. The rea fables must ot be removed unt = reparation fr oeting are competed - ‘te Engineer © | ensure soins sabe rises on the same dy 3 ommenced ca_| Cor out Salat tough intng with proved and cere cable oes © |e Enginer : Stee Aten endo ences be cng ung ned apes / ees | Allcabies shall be jointed colour to colour and tested for continuity & IR Test. oe y ‘Ste Engineer | ena inty wn oproved sind nd loping sa be 1255. h ee ‘Site Engineer “erminate both eds wh proved ale kt crimping too) ‘Site Engineer 1 | Ensure suitable crimping tool & cable cutter are using in termination, 7 r ‘Site Engineer J | Cable tag and Gland Earthing to be done as per 1S 12943 on | enerpze the cables after Gearance from all the concerned authorities oe |g oar porn a | : | Ste Engineer “Teflon tests lb conducted fr TI Cable aftr ang a a ‘Site Engineer ‘> | insulation Resistance Test (sectional and overs) - rT. ho «Site Eiger || sgn et et ona a per eqemnt 4 | continuity Resistance Test. | se Eneneer 7 =a Ske Engineer FS Solar PV Manufacturing Fality Project TATA PROJECTS shod Installation of W/LT Cable Spycate laying and Termination ‘Savills Frsesoter. "PIPUES70057 MO IMS/MED/D Reo Page9 of 10 8 _| Mandatory safety Requirements [se ocr-o8- work atheghe HSEOC?-05- Lf and erection SEOCP-05- Loading nd Unloasing SE OcP-07 Chest fo extended doy and nh shit HSE cP 0g chet or ot work HSE cP 01 Pei to workeytom HSE OcP—03—vertgo height pass est | NSE cP 11 —Safldngasemtly ane Dsmanting sn sbove Ocean otel procedures eto be owed whe cng cut | thasewty SE General Gntat conditions ae appsble ‘Stein carge/ Engineer ‘tein carge/ Engineer and Sub Contactor Regie pep ais, paved denonsvatons of sae pach work. > Subcontractor has to provide neces sey mate 8 pr work > Implement HS systems tae supervisor the safety nes before crvmencerent, during installation and etn nd comming of he > Organise training programs for sfery snares >> snl in kana and equre preventive measures akan. | > coorinates with ste arnsration frst-ald centey, doctor & espa > Menitrs mandatory safety requemens or workmen and werk > Schmmtedronings toe sbmitedin advance forrvew fey | eprtnene > tiAc tobe submited bythe contractor before conmencamont ofthe work > Storage othe materi tobe spect equenty > Falow the necessary codes related to ducting stem | > Mock dt tobe conducted | 1b Spec Pesta be provided forthe Workman fey inca Safety officer anu contactor safety parson Se incase FS Saar PY Manuf Fly ofc | @ TATA PROJECTS Instaltion of MYL abe = Seance lavigne Teminaton | IU 7005 eH /MS/ EIDE Page of) 9.0 Documentation: a _ [sno Name I Format No { 9.1. | Request for Inspection (RFI) 108.03.03/ FO 240 32 [np | Ba Na TPLTETOOSTINMEPTPVETO, Rev Installation of cables - underground Format No.08-03-05-FMT-£-CAB-CL003-00 (buried) check ist Format No.08-03-05-FMT-E-CAB-CL-002-800 ‘2 | installation of cables above ground s0.0ttachments: SrNo Name OC No /Format No eae Doc. No.: TPL/UW/670057/MEP/ITP/CL/O1, 10a | mp Rev. RO Installation of cables - underground (buried) check tit 10.3 | Installation of cables above ground | Format No.08-03-05-FMT-E-CAB-CL-002-R00 102 Format No.08-02-05-FMT--CAB-CL003-R00 zept Seay NN ee OR i onan mes et eh pn ND ne am ne ee En pe en! Sn sp oe ae sng er ee a [NOLAYAUAwaL. GN DNIAVT-21HV9 KTH 4O NOLLVTAVISNI-NVIL ASL ANY NOLINASNE a INSTALLATION OF CABLES - ABOVE GROUND ees ‘SAVIIS First soter. fa moxers CHECK List [ps apa rma Pisa fied Cae sus consis [aos cama ta justine ones anna sn fom Sgt factors semen Sab aeaer sca: Ret Rar ores Rovno ici Fetrinepocied Foatnepoeae [Tots! offered Quantity: [Accepted Quantity: [Rejected Quantity: 7 [ Seven of chakras yee ames = haere eam RST Get mare [ogres by cen sum Conraors r qstos and aperoved veto Statements approved by let (Sioa before Cable Laying [esi tor pense dd re cable Vays ao alld, vod opel an fe tom sap oto. [Soci bemeen supports res a ar Io tayoutrotng arming. fe ended conde ae posed stg mers, wherever [ensure no nterence win ate aches in [scree achancal eins, [cab ways ae ereced ax pr lyoaionina Jess tt ung along vas Jeans fr ere toto art moo aed eras cate chaos rae DOE {syn ensue ge oe power eaten be iin |retamaton ss per sproved rapec Te ang RH EW RSP as per sonar esse the cae Wenchs FES ToR lesure open ate worcester of fron spar approve doing INSTALLATION OF CABLES - = ‘UNDER GROUND (BURIED) MS ane CHECK LIST SAVIIS Frese. fo {F3 India Solar Ventures Private Limited inurl Par Papa, [Project Code: 670087 fs oro isk avn aoa lamar aaenT [cee Soe seed Soe fs oeipen ono ee ote, ype of Cases casa we appeal alo sw Concer pe alta apo uence Sane epee ce (acs Boe CS yg @_ [me TerchOspm Wana pera et eis on ate pT 3 [sr stig sn eons, conpoced hd ed [rsa ss Sonar beeen out 3 CORTESE [etmaced spe sop! sn win ofa, any nis wate maa lesergion “cab pian Cae Romeo” [cate poston we pucesin acho oa en taperloa song he rong spree sh ness cor pone ete tbe ain tel msn a er ores op i a aa HA aR TDG ve [Emon ag Cai omar a a Sd and onsen TA Fe a TR ROTA a Ua HGH WaT TAS aT] 1 [eahersotape rbenn tw oass aeganoned one er 3 i an a any pT sigateeatub-Conracar oats | igure of PLE & Ose snare of Caton! pectin Aton

You might also like