MTO EMERGENCY STAIR

PT. JATI MURNI AGUNG


Thick Width Length Weight MTO BOM WASTE Incoming Shortage
NO DESCRIPTION Remarks
(mm) (mm) (mm) (kg/m) (kg/pcs) (pcs) (kg) (kg) (kg) (%) (pcs) (kg) (pcs) (kg)
I. BY PT.JATI MURNI AGUNG
1 PIPE 1 1/2" DIA 6.000 1,51 9,08 6 54,48 44,38 10,10 19% 4 36,32 2 18,16
2 PIPE 1/2" DIA 6.000 0,64 3,81 8 30,48 28,83 1,65 5% 10 38,10 -
3 L50X50X5 3.000 12,43 37,29 4 149,15 126,78 22,37 15% 6 223,73 -
4 UNP250X90X9 6.000 29,11 174,65 2 349,29 2 349,29 -
418,69
5 UNP250X90X9 5.000 29,11 145,54 1 145,54 76,15 15% 1 145,54 -
6 GRATING 300 300 1.200 17,712 17 301,104 301,10 - 0% 16 283,39 1 17,71
SUBTOTAL 38 1.030,05 919,78 110,26 11% 39 1.076,37 3 35,87
II. BY PT.BBC
1 PLATE 15 91,55
2 PLATE 8 20,80
3 PLATE 5 5,91
SUBTOTAL 118,26
GRAND TOTAL 38 1.030,05 1.038,04