You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

13

12

11

10

7'
9

1
OFFICE OF THE BUILDING OFFICIAL
1


68670
PROVINCE OF QUEZON
x500)
6770 6000 6000 6000 6000 2925 3075 6000 6000 6000 6000 5000 2900 950 5000
MB2 (3. 0+40.15m
x500) ELEV
MB1 (300

.15m
ELEV. +4

HAVEN'T STARTED YET


x500)
MB1 (3. 0+40.15m RECOMMENDING APPROVAL:
ELEV
x500)
MB1 (3. 0+40.15m
1

ELEV

PENDING/ ON-GOING
0)
1 (300x50
MB1 (300x500)
10

MB . +4.15m
ELEV. +4.15m

ELEV
x500)
MB1 (3. 0+40.15m HEAD STRUCTURAL SECTION : DATE
ELEV
x500)

MB1 (3. 0+40.15m


M N
2300

APPROVED:
ELEV

BUILDING OFFICIAL DATE


MB1 (300x500)
x500)

5.0M SET BACK LINE


ELEV. +4.15m
5m
ELEV. +4.1
6000

MB1 (300

DONE
L

MB1 (300x500)
x500)

ELEV. +4.15m
MB1 (3. 0+40.15m

LEGEND:
6000

ELEV
K

x500)

MB1 (300x500)
5m

ELEV. +4.15m
6000

ELEV. +4.1
MB1 (300

3
2

3
ELEV. +4.075m
MB6 (300x500)
J

ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m HALF TRUSS - 5
MB1 (300x500) MB1 (300x500) MB1 (300x500) MB1 (300x500) MB1 (300x500)

MB6 (300x500)
MB1 (300x500)

ELEV. +4.075m
x500)

ELEV. +4.15m
MB1 (3. 0+40.15m
5000

ELEV

METERS
MEZZANINE FRAMING LAYOUT PLAN
ELEV. +4.075m
MB6 (300x500)
H

HALF TRUSS - 5

MB1 (300x500)

MB6 (300x500)
0)

ELEV. +4.075m
ELEV. +4.15m
x50
MB1 (300.15m
5000

ELEV. +4

ELEV. +4.075m
MB6 (300x500)
G
61673 mm

HALF TRUSS - 5
ELEV. +4.075m
W12x40

1:150
MB6 (300x500)
MB1 (300x500)
x500)

ELEV. +4.075m
ELEV. +4.15m
5m
ELEV. +4.1
5200

MB1 (300

ELEV. +4.075m
ELEV. +4.075m W12x40
MB6 (300x500)
F

HALF TRUSS - 5

MB6 (300x500)
MB1 (300x500)

ELEV. +4.075m
x500)

ELEV. +4.15m
MB1 (3. 0+40.15m
4800

SCALE
ELEV

ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m ELEV. +4.075m
MB3 (300x500) MB3 (300x500) MB3 (300x500) MB3 (300x500) MB6 (300x500)
E

S-12
HALF TRUSS - 5

S1

1
S1

S1
MB4 (300x500)

MB4 (300x500)

MB4 (300x500)

MB4 (300x500)

MB4 (300x500)

MB6 (300x500)
S1
x500)

S2

ELEV. +4.075m
MB3
ELEV. +4.15m

ELEV. +4.15m

ELEV. +4.15m

ELEV. +4.15m

ELEV. +4.15m
MB1 (3. 0+40.15m

ELEV. +4.15m

PC-1
MB7 (250x400)
5200

ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m


ELEV

MB5 (300x500) MB5 (300x500) MB7 (250x400) MB5 (300x500)

S2

S1

S1

S1
ELEV. +4.075m
MB6 (300x500)
D

ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m ELEV. +4.15m HALF TRUSS - 5
MB2 (300x500) MB2 (300x500) MB3 (300x500) MB3 (300x500) MB3 (300x500) MB3 (300x500)

MB1 (300x500)
x500)

ELEV. +4.15m
MB1 (300.15m
6000

ELEV. +4

FOR CONSTRUCTION
C

4
MB1 (300x500)
x500)

ELEV. +4.15m
MB1 (3. 0+40.15m
6000

ELEV

4
B

3
MB1 (3 00x500)

4173
m
V. +4.15
00x500)

x500)

6
ELE
MB1 (3

5.0M SET BACK LINE


MB1 (3. 0+40.15m
m
V. +4.15
ELE
00x5m 00)
MB1 (3

7
V. +4.15
ELE

ELEV
MB1 (300x500)
m
V. +4.15
ELE

DATE ISSUED : 09 / 17 / 2019



A

8

9
°
81

5
8
2425 2500 1075

6
5418 6000 6000 6000 6000 6000 6000 6000 6000 5000 2900 950 5000
61318

13

11

10

8b
8a
9

1
THIS DRAWINGS DULY SIGNED, STAMPED OR SEALED, PROJECT TITLE : PROJECT OWNER: SHEET CONTENTS CADD OHM.H / PC-19 REVISIONS: SHEET NO.
AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL
PROPERTIES AND DOCUMENTS OF THE ARCHITECT, DATE REMARKS
IAN B. BERTULFO MEZZANINE FRAMING LAYOUT PLAN DATE JANUARY 2019

DATE PRINTED: JANUARY 2019


CIVIL ENGINEER
WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
A PROPOSED COMMERCIAL BUILDING PRINCESSISA, INC.
1
12
PRC NO. : 109990 VALIDITY : 19 DEC 2021
PERSON, WITHOUT THE CONSENT OF THE ARCHITECT
OR AUTHOR OF SAID DOCUMENTS TO DUPLICATE OR
CHECKED G.A. 2 S
8/F, AYALA LIFE - FGU CENTER MINDANAO AVE., TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE FILE PATH 3
PC-GALLEGO19
COR. BILIRAN RD. CEBU BUSINESS PARK, CEBU CITY
TEL. NO.: (032)415-1494 FAX. NO.: (032)231-3453
PTR NO. : 0175902
PLACE : CEBU CITY
DATE
TIN
: 07 JAN 2019
: 260-144-243
REPETITION OF AND FOR OTHER PROJECTS OR
BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE.
LOCATION: LOPEZ, QUEZON ADDRESS: 3rd AVE. SELLGO BLDG. NORTH RECLAMATION AREA, CEBU CITY UPDATED SEPTEMBER 2019
4 14
- R.A.9266 ARTICLE IV, SECTION XXXIII 5

You might also like