PATRA DINAMIKA

CHAIN LINK THICKNESS MEASUREMENTS


COPI Representative : Abdul Rochim Moekri Inspection date : August 27, 2010
ABS Surveyor : Harry David
Diving Supervisor : Abdul Rochman Inspection divers : Muhamad
: Agus Salim

Inspected Location
95 mm
ORIGINAL CHAIN DIAMETER FOR SINGLE LINK

Field Report UWILD FPSO Belanak 2010


PT. PATRA DINAMIKA
Continued: Chain Link Thickness Measurement Table
Location : Splash Zone
THICKNESS MEASUREMENTS
(in millimeters)
CHAIN
NUMBER
POSITION
Diminution
O’clock Original 1 2 3 4 5 6 7 8 9 10
Single Link
Position Thickness (Single) (Double) (Single) (Double) (Single) (Double) (Single) (Double) (Single) (5 Link)
(Average)
12-6 132 131 131 131 131 132 0.56%
4 244 243 243 242 3600
3-9 132 131 132 131 132 132 0.28%
12-6 132 131 132 131 131 131 0.56%
5 241 243 242 242 3600
3-9 132 132 131 131 132 132 0.28%
12-6 132 130 130 132 130 130 1.20%
8 244 244 242 244 3580
3-9 132 131 130 130 131 131 1.02%
12-6 132 130 131 131 130 130 1.18%
9 244 242 244 244 3590
3-9 132 130 131 131 132 131 0.72%

Location : -30 feet


THICKNESS MEASUREMENTS
(in millimeters)
CHAIN POSITION
NUMBER
Diminution
O’clock Original 1 2 3 4 5 6 7 8 9 10
Single Link
Position Thickness (Single) (Double) (Single) (Double) (Single) (Double) (Single) (Double) (Single) (5 Link)
(Average)
12-6 132 132 132 132 131 132 0.14%
4 241 242 241 241 3600
3-9 132 131 131 131 132 131 0.56%
12-6 132 131 131 132 131 131 0.56%
5 242 242 242 242 3600
3-9 132 132 132 132 132 131 0.14%
12-6 132 130 130 130 130 130 1.50%
8 244 243 242 244 3580
3-9 132 131 131 130 130 132 0.88%
12-6 132 130 131 130 130 131 1.18%
9 242 243 243 243 3590
3-9 132 130 131 131 130 131 1.02%

Continued: Chain Link Thickness Measurement Table


Field Report UWILD FPSO Belanak 2010
PT. PATRA DINAMIKA

Location : Deck Forward


THICKNESS MEASUREMENTS
(in millimeters)
CHAIN POSITION
NUMBER
Diminution
O’clock Original 1 2 3 4 5 6 7 8 9 10
Single Link
Position Thickness (Single) (Double) (Single) (Double) (Single) (Double) (Single) (Double) (Single) (5 Link)
(Average)
12-6 132 130 130 131 130 129 1.48%
12 249 250 251 247 2820
3-9 132 130 130 130 130 130 1.50%
12-6 132 130 130 130 130 131 1.34%
13 247 249 247 248 2840
3-9 132 132 130 132 130 132 0.60%
12-6 132 132 130 129 131 129 1.32%
14 247 247 247 247 2860
3-9 132 130 130 129 131 130 1.48%
12-6 132 131 132 131 132 129 0.72%
1 247 249 247 247 2840
3-9 132 130 132 130 132 130 0.90%
12-6 132 131 132 131 132 130 0.58%
2 247 250 247 249 2840
3-9 132 132 130 132 131 132 0.44%

Note:
 All measurements in Millimeters
 Measurement on o’clock position only for single chain measurement.
 The mooring chain diameter taken below sea level entry point , -30 ft from sea level and surface deck forward.
 Measurements in the chain No. 3 in surface deck forward can not be taken due to limited access (Chain Jack on top of mooring chain no.3)
 Dimensional Measurements were taken on 5 links all chain leg.
 The Chain link thickness measurements were taken on all mooring chain of this structure and recorded on DVD player, at during of the time
inspection.

Field Report UWILD FPSO Belanak 2010


PT. PATRA DINAMIKA

(Not To Scale)
KEY PLAN
FPSO BELANAK NATUNA
BOTTOM FRAME

Field Report UWILD FPSO Belanak 2010