Rall Nox 24513 B, Tech. 7th Sem. (Civil Engg.) Examination — May, 2015 ESTIMATING & COSTING Paper: CE05-F ‘Time : Taree Hours) [ Masimum Marks: 100 Before nsring he qustos aia sould ensure Ht hey Fave ben suppliod the correct and complete question pape. NO oan in Ba end lebanon. [Note : Students have to attempt fie question in total at Teast one questions from each Section. All questions carry equal marks, SECTION-A 1. G) Reiefly explain the different types of estimates liscustng when each oe is preferred. 18 (©) How to prepare an abstract estimate 5 2 Estimate the quantity of (a) Barth work Excavation, ©) Footing concrete, (0) Masonry in footing (@ DPCand 24510125046 310808) BT.0. (©) Brick work in superstructure forthe building from. . {he given plan and section having folowing size Wall thickness = 230mm: head room height» 3.2m footing conerete=1 m x03 mI footing =0.7x03 my; 1 footing = 05 x03 m ; Basement = 04x 0.4 m j Aooring conrete = 150mm: floor Finish CM 1 mm; DPC = 20 mm; roof slab = 125. mm; ‘woathoring course LC = 75 many Assure the bce of footing is 11 mbelow GL. gmx3m | 6mx3m | 3mx3m mm | 33m | 6mm im . ‘SECTION - 3.Write down the detailed specifications for the {ollowing items of works 20 (@) Earthwork in excavation in foundation, (©) Reinforced cement concrete. (RCC) (0 Damp proof course 25 cm of cement concrete 1a, () Brick work frst lass. 4. (@) Explain the general specification of first class building, 10 (©) How to prepare an abstract estimate? 10 24s10:.250(7-9N0.8K15) (2) SECTION-C. 5. (a) Explain briefly the various factors affecting the rate analysis. e (©) Work out the rate analysis ofthe following tems (230 eam wall in CM 13 on ground floor () Cement plaster 12 mm thick in M15. 12 6. () Calevlae the rate for I m? of cement concrete az 10 (©) Differentiate between ‘Analysis of rates’ and ‘Schedule of rates, 10 SECTION-D 7. (a) What is meant by depreciatlon ? What are the various methods of determining depreciation ? plain any one briefly. 2 (@) What are the different purposes for which the valuation in undertaken? 8 1. (a) What ate the diferent types of contracts? Explain them briefly with their merits and demerits. 10 (0) Explain the fllowing: © (Tender (6) Tender Notice (Gi) Security deposit 2asrsz50(P3NO.8KI5) (3)

You might also like