You are on page 1of 34

Title of the Project

Name:
Index No:

London Metropolitan University


2018 March
Declaration

i
Dedication

ii
Acknowledgments
Thank those who helped (supervisor, friends, parents, etc.) you.

iii
Abstract
 Use approximately 300 words to summaries the subject matter of the report, the problem
being solved, the motivation for solving it, the approach taken, your findings and
conclusions.
 Complete the abstract after you have completed the rest of the report. It normally takes
several revisions to achieve a good abstract.
 This should be one page description that comprises of the problem that you address, your
approach (users, input, output, and process), analysis & design, implementation,
valuation and conclusion. Write more about your work. Do not use citations,
abbreviations and further works in the abstract.
Keywords : Ordering, Customer Service

iv
Table of Contents
Here you should list headings of chapters/sections/subsections with page numbers.

Contents
1 Chapter 1 Introduction.....................................................................................................................1
1.1 Goals...........................................................................................................................................1
1.2 Motivation..................................................................................................................................1
1.3 Method........................................................................................................................................1
1.4 Overview.....................................................................................................................................1
2 Chapter 2 Background and Problem Statement.............................................................................2
2.1 Introduction...............................................................................................................................2
2.2 Literature Review......................................................................................................................2
2.3 Problem Statement....................................................................................................................2
3 Chapter 3 project management........................................................................................................3
3.1 Approach....................................................................................................................................3
3.2 Initial Project Plan.....................................................................................................................3
3.3 Problems and Changes to the Plan...........................................................................................3
3.4 Final Project Record..................................................................................................................3
4 Chapter 4 feasibility study................................................................................................................4
4.1 Time feasibility...........................................................................................................................4
4.2 Cost feasibility............................................................................................................................4
4.3 Scope feasibility..........................................................................................................................4
4.4 Technical feasibility...................................................................................................................4
4.5 Economic feasibility...................................................................................................................4
5 Chapter 5 design................................................................................................................................5
5.1 Introduction your choice of proposed network system...........................................................5
5.2 Hardware and software requirements.....................................................................................5
5.3 Evaluating of solutions..............................................................................................................5
6 Chapter 6 implementation................................................................................................................6
7 Chapter 7 testing and verification....................................................................................................7
8 Chapter 8 EVALUATION and CONCLUSION..................................................................................8

v
9 References...........................................................................................................................................9
10 Appendices....................................................................................................................................10

vi
Table of figures

Here you should list captions of Figures followed by names, with page numbers.

vii
Table of tables
Here you should list captions of Tables followed by names, with page numbers.

viii
Abbreviations
A shortened or contracted form of a word or phrase, used to represent the whole,
as Dr. for Doctor, U.S. for United States, lb. for pound.

ix
1 Chapter 1 Introduction
Every chapter should start with an introductory paragraph to summaries the content. This tells
the reader both how this chapter follows on from previous chapters, and what to expect in the
chapter. Do not just repeat the table of contents for the chapter.
1.1 Goals
State what was to be achieved in the project?
1.2 Motivation
Describe why the problem is worth solving
1.3 Method
Summaries how was the project was carried out
1.4 Overview
Give a brief summary of the technical area

1
2 Chapter 2 Background and Problem Statement

Introductory paragraph
2.1 Introduction
In your own words, provide a description of the problem domain
2.2 Literature Review
Present the ‘state-of-the-art’ of product/systems in this area. You should organize this in some
other way than by company or by date in order to show your understanding!
2.3 Problem Statement
Clearly state the problem that you are attempting to solve in your project

2
3 Chapter 3 Project Management
Introductory Paragraph
3.1 Approach
Discuss how you planned the project, and why you planned it the way you did
3.2 Initial Project Plan
Project Purpose

Initial Objectives and Success criterions of the project

Project Deliverables

Deliverable Recipients Delivery Date Delivery Method

Milestone (Main Tasks Scheduled Initially)

Show your initial project plan in the form of a Gantt chart and a brief description, showing
planned dates. If your task names are not self-explanatory, provide a table to explain the
tasks.
Main Tasks Start Date End Date Duration (days)

1
1
3.3 Problems and Changes to the Plan
Identify problems you faced that caused you to change the plan, and justify the changes.
Problems and Issues
20 days for initiation process –

3.4 Final Project Record


Show your final project plan in the form of a Gantt chart and a brief description, showing
actual dates.
According….

Main Initial Project Plan Schedules Scheduled Dates after Changes Comment
Task Start End Duratio Start Date End Date Duratio
Date Date n n
PB
FB 22/11/05 22/12/31 22/11/05 23/01/07 A Change of
extra 10 day
allocated.

1
4 Chapter 4 feasibility study
Terms, a feasibility study involves taking a judgment call on whether a project is doable
Introductory Paragraph
4.1 Time feasibility
Time Feasibility is the most important for project success. A project will fail if not completed on
time.

4.2 Cost feasibility.


Helps organizations assess the viability, cost, and benefits associated with projects before
financial resources are allocated

4.3 Scope feasibility


Scope of Feasibility Studies are in depth technical evaluations of your objectives

4.4 Technical feasibility.


There will be high possibilities of implementing the propose system

4.5 Economic feasibility


Analysis of a project's costs and revenues in an effort to determine whether or not it is logical
and possible to complete

1
5 Chapter 5 design
Introductory paragraph
5.1 Introduction your choice of proposed network/ software system
5.2. Development Model

5.3. Requirement Specification

Functional Req

Non Functional

5.4. Hardware and software requirements


5.5 Diagrams and Explanation

5.2 Evaluating of solutions


Solution evaluation in project analysis is the assessment of existing, or potential solutions.
Discuss how well your solution solves the problem.
Justification to your Solution (1pg)

2
6 Chapter 6 implementation

Introductory paragraph
Implementation is the carrying out, a method, or any design, idea, model, specification, and
standard or for doing project. (E.g. firewall configurations, any configurations). Then if you want
to include screenshot for the document. You can include screenshots.

3
7 Chapter 7 testing and verification
You must include test plan and test cases for this task.
Activity Start Date End Date

Modules Description No of Test No of Test No of Test Priority (High,


Cases Cases passed Cases pending Me, Low)
Executed

4
8 Chapter 8 EVALUATION and CONCLUSION
You must include critically EVALUATION and CONCLUSION from your project. (Summaries
the project and your solution in one or two paragraphs.

5
9 References
Include a list of references cited in the report here. Either use the [numbered] or [name’date]
convention

6
Gannt Chart

10 Appendices
Interim Progress Reports
Company letter.
Progress approval form and Project commencement meeting sheet.