1000
300
7-16MMØ MAT BARS
@ 0.12 MOC B.W.
8-16MMØ VERT BARS
1000
300
10MMØ STEEL TIES
SPACED: 5 @ 0.05
MOC, 0.10 MOC;
REST @ 0.20 MOC
PLAN
4" CONC. SLAB
4" GRAVEL
8-16MMØ VERT BARS
300
WF
950
10MMØ STEEL TIES
SPACED: 5 @ 0.05
1250
MOC, 0.10 MOC;
REST @ 0.20 MOC
7-16MMØ MAT BARS 3" GRAVEL
@ 0.12 MOC B.W.
75
300
SECTION
C1F1 DETAILS
2 COLUMN/FOOTING DETAILS
S 2 S C A L E 1 : 2 5
This is an example of column/footing details. The footing is 1m x 1m x 0.3m and is 1.25m deep,
while the column is 0.3 x 0.3m. The mat bars are 7 pieces of 16mm diameter rebars spaced at
0.12m on center and laid in both directions (bw=both ways, left to right & top to bottom). The
main bars (vertical bars) in the column include 8 pcs of 16mm diameter bars and are tied using
10mm diameter bars with spacing that starts close (0.05m) at the bottom and increases upward.
Learn from this example and make your own pedestal-footing detail based on the GIVEN
information in your NEUVLE assignment details.