Foundation - Plan-Roof Framing PDF
Foundation - Plan-Roof Framing PDF
CHB WALL
GA. 24 PLAIN G.I. SHEET WALL FLASHING
RB1
RB1
RB1
RB1
RB1
RB1
RB3
RB3
RB3
RB3
RB3
RB3
RB1
RB1
RB3
RB1
RB1
RB1
RB1
RB1
RB3
RB3
RB3
RB3
RB3
RB3
RB1
RB1
B C D E F G H I
50 X 50 X 4.5 MM
1/2" THK. CEMENT
RB3
CONCRETE GUTTER CONCRETE GUTTER CONCRETE GUTTER PLASTER FIN.
RB1 RB1 RB1 RB1 RB1 RB1 RB2
5
RB1
RB1
RB1
RB1
RB1
RB1
RB3
RB3
RB3
RB3
RB3
RB3
6 MM THK. GUSSET
FT
RB1
PLATE
RB1
RB3
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
50 X 50 X 4.5 MM R.C. ROOF BEAM
BOTTOM CHORD
4
RB1
RB1
RB1
RB1
RB3
RB3
RB3
RB3
RB3
RB3
RB1
RB1
RB1
50 X 50 X 4.5 MM 50 X 50 X
4.5 MM
BOTTOM
10 MM DIA. VERT. CHORD
U-BARS AT 400 MM
PETER AARON R. NATO, UAP All designs, drawings, models, specifications and other contract documents and
PROPOSED TWO - STOREY COMMERCIAL / RESIDENTIAL
4
ARCHITECT copies thereof, duly signed, stamped and sealed and furnished as instruments of MARIA STEPHANIE L. PERDIGON
PRC NO.: VALIDITY:
service, are the intellectual property and documents of the Architect, whether the
work for which they were made is executed or not, and are not to be reproduced or
ARCADE BUILDING BS ARCHITECTURE - 3A
IAPOA NO.: O.R. NO.: DATE: used on other work expect with a written agreement with the ARCHITECT.
PTR NO.: DATE: ENGINEERING - ARCHITECTURE DEPARTMENT
LOCATION:
PLACE ISSUED: TIN: