REPUBLIC OF THE PHILIPPINES

TABLE OF CONTENTS OFFICE OF THE BUILDING OFFICIAL


CITY OF BAGUIO

ARCHITECTURAL
BUILDING OFFICIAL
TECHNICAL DESCRIPTIONS A-1: PERSPECTIVE
: SITE DEVELOPMENT PLAN
LINE BEARINGS DISTANCES
: LOCATION MAP
B O U N D A R Y
A2 : FLOOR PLANS
: SECTIONS
: ELEVATIONS
: DOOR & WINDOW SCHEDULES

N
STRUCTURAL
:
:
FOUNDATION PLAN
FOOTING DETAILS
LAND USE & ZONING
W E :
:
FLOOR FRAMING PLANS
BEAM & COLOUMN DETAILS
: SLAB DETAILS
: ROOF FRAMING DETAILS

S ELECTRICAL
4
4
E-1: LIGHTING AND POWER LAYOUT
LINE & GRADE
3 : LOAD SCHEDULE AND COMPUTATION
: RISER DIAGRAM
3.00 : SINGLE LINE DIAGRAM
9.00
2
: ELECTRICAL GENERAL NOTES
3.00
1
4.65

3.00 PLUMBING

P-1:
:
PLUMBING LAYOUT
SEPTIC TANK PLAN AND DETAILS
ARCHITECTURAL
: CATCH BASIN DETAILS
1 EXTERIOR PERSPECTIVE :
:
PLUMBING ISOMETRIC
GENERAL NOTES AND LEGEND
SCALE: 1:100 METERS

STRUCTURAL
9.30

PROPOSED BUILDING
A
3.65
2.50

ELECTRICAL
6.65

3
3.00

EX
IST
IN S.T.
G
AL
LE
Y
PLUMBING

2
SITE DEVELOPMENT PLAN
SCALE: 1:150 METERS

FIRE DEPARTMENT

VICINITY MAP
REVISION SHEET CONTENT SHEET NO:

SITE DEVELOPMENT PLAN


PERSPECTIVE
VICINITY MAP
TABLE OF CONTENTS
A1
1 2 3 4 1.20 2.10
9.00 1 2 3 4
3.00 3.00 3.00 1.00
4 3 2 1 0.30 0.30 0.30 0.30

1.40
W D W W W
2 2 3 3 6 APEX LEVEL

C
APEX LEVEL

0.30
REF
FIX FIX FIX FIX

1.40
T&B SEE TRUSS DET.

1.40
SINK

0.30
GLASSBLOCKS

.77
KITCHEN
BEDROOM W

3.00

RANGE

1.20

1.20
W 5 TOP OF ROOFBEAM
2 DINING .30 CEILING LINE CEILING LINE
.20 TOP OF ROOFBEAM

0.30
D D
3 .90 4

2.80
2.80
B

0.30
DIVIDER DIVIDER
6.65

.89
MASTER'S
UP D
2
TOP OF 2ND FLOOR BEAM BEDROOM FAMILY LIVING VIEWDECK
BEDROOM TOP OF 2ND FLOOR BEAM
RECEIVING

TERRACE
3.65

&LIVING 2- SETS STEEL WINDOW 2- SETS STEEL WINDOW

STAIRWELL
AREA W W

2.97
W LOCATED AT BEDROOMS, LOCATED AT BEDROOMS,
3 4

2.80
1
AT REAR ELEVATION AT REAR ELEVATION

2.80
D
3
D RECEIVING &
1
A

W TOP OF TIE BEAM BEDROOM LIVING AREA TERRACE


W W TOP OF TIE BEAM
2 3 1 1.20M 0.60

.89
2.19

ENTRANCE PORCH 0.30 0.30

1.00
DN

LONGITUDINAL SECTION
REAR ELEVATION

0.30
0.40
SCALE: 1:100 METERS
FIRST FLOOR PLAN

0.60
SCALE: 1:100 METERS

0.30
SCALE: 1:100 METERS

2- SETS STEEL WINDOW


W LOCATED AT BEDROOMS, 1- SET STEEL WINDOW
1 2 3 4 4 AT REAR ELEVATION W LOCATED AT TOILET &
9.00 .20
7 BATH
.30 A B C A B C
.80 3.00 3.00 3.00 1.00

W W W
3 2 2
C

0.90 0.80

CHILDREN 'S APEX LEVEL APEX LEVEL


CLOSET

GLASSBLOCKS

BEDROOM STUDY AREA & BEDROOM


3.00

1.40

1.40
W
2 LIBRARY 4
SEE TRUSS DET.

.77
D D
3 3
W TOP OF ROOFBEAM TOP OF ROOFBEAM
3
B
6.65

.89

WASHING

2.80

2.80
MACHINE
D
2
GLASSBLOCKS

W
FAMILY
3.65

4 MASTER'S LIVING TOP OF 2ND FLOOR BEAM TOP OF 2ND FLOOR BEAM BEDROOM BEDROOM
TERRACE
2.97

BEDROOM W

2.10

2.10
2 VIEW
D DECK
3 DN
2.80

2.80
A

W W
.50 1.00

2 2
.89

TERRACE
TOP OF TIE BEAM TOP OF TIE BEAM TERRACE BEDROOM BEDROOM

2.46 4.38 3.31

SECOND FLOOR PLAN RIGHT SIDE ELEVATION CROSS SECTION D 1 SET - KILN DRIED PANEL D 2 SETS - PANEL DOORS
LOCATED AT TERRACE &
DOOR LOCATED AT MAIN
SCALE: 1:100 METERS
SCALE: 1:100 METERS SCALE: 1:100 METERS
1 ENTRANCE 2 SERVICE

0.75 0.65
1 2 3 4 A B C 1.80 1.50

STEEL CASEMENT WINDOW 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
PREPAINTED ROOFING SHEET

PLAIN CEMENT FINISH


APEX LEVEL APEX LEVEL

0.30

0.30
FIX FIX FIX FIX FIX FIX FIX FIX FIX FIX FIX
1.40

1.40
.88

.88
.77

0.30

0.30
TOP OF ROOFBEAM TOP OF ROOFBEAM

1.20

1.20

2.10
0.30

0.30

2.10
PLAIN CEMENT FINISH
2.80

2.80

0.30

0.30
TOP OF 2ND FLOOR BEAM TOP OF 2ND FLOOR BEAM

1.50" DIA G.I. PIPE


W 2- SETS STEEL WINDOW W 7- SETS STEEL WINDOW
2.80

2.80

HANDRAIL
KILN DRIED PANEL DOOR 1 LOCATED AT LIVING ROOM 2 LOCATED BEDROOMS

TOP OF TIE BEAM TOP OF TIE BEAM


D D
3 4
4 SETS - PANEL DOORS
FRONT ELEVATION LEFT SIDE ELEVATION DOORS & WINDOW SCHEDULE LOCATED AT BEDROOMS
1 SET - PVC DOORS
LOCATED AT TOILET & BATH
SCALE: 1:100 METERS
SCALE: 1:100 METERS SCALE: 1:100 METERS

REVISION SHEET CONTENT SHEET NO:

FLOOR PLANS
ELEVATIONS
DOOR & WINDOW SCHEDULES
A2
STAIR DETAILS
1 2
9.00
3 4 1.30 BEAM SCHEDULES
3.00 3.00 3.00 1.00
14 PCS - 16MM DIA
GB GB GB FOOTING BARS SPACED BEAM
AT SUPPORT AT MIDSPAN
C F1C1 F1C1 F1C1 F1C1
AT 0.20M BOTHWAYS
DESIGNATION STIRRUPS
0.30

3.00
GB GB GB IB GB 0.25 0.25

3 PCS D16 TOP BARS 3 PCS D16 TOP BARS 10MMØ TIES SPACED 3 @ 0.05M, 3 @
GB GB GB TB 0.10M, REST @ 0.200M ON CENTER
B

0.30

0.30
6.65

.95
F1C1 F1C1 F1C1 F1C1 (TIE BEAM) 3 PCS D16 BOTT. BARS 3 PCS D16 BOTT. BARS
12MM DIA RSB SPACED
3.65

GB

1.30
@ 0.30M ON CENTER

0.30
2.97
GB 0.25 0.25
GB GB

GB TYPICAL BEAMS 3 PCS D16 TOP BARS


3 PCS D20 TOP BARS 10MMØ TIES SPACED 3 @ 0.05M, 3 @
A

2ND FLOOR BEAM 2 PCS D16 CUT BARS

0.30
GB GB

0.30
F1C1 0.10M, REST @ 0.200M ON CENTER

.89
F1C1 F1C1 F1C1 3 PCS D16 BOTT. BARS 2 PCS D16 TOP BARS
3 PCS D16 CUT BARS
FOUNDATION PLAN
SCALE: 1:100 METERS 0.25 0.25
F1C1 PLAN
RB 3 PCS D16 TOP BARS 2 PCS D16 TOP BARS 10MMØ TIES SPACED 5 @ 0.05M, 5 @
1 2 3 4

0.30
(ROOFBEAM)

0.30
0.10M, REST @ 0.18M ON CENTER
3.00 3.00 3.00 1.00
2 PCS D16 BOTT. BARS 3 PCS D16 BOTT. BARS
12MM DIA SLAB BAR SPACED BENT UP BARS,
STRAIGHT BARS, CUT BARS AT 0.15 BOTHWAYS
0.15 0.15
8 PCS-16MM COLUMN BARS WITH
C

B2 B2
B2 10MMØ TIES SPACED 4 @ 0.05M, 4 @ EB 2 PCS D12 TOP BARS 2 PCS D12 TOP BARS
10MMØ TIES SPACED @ 0.20M ON
0.10M, 4 @ 0.12M, REST @ 0.15M ON

0.30

0.30
(EDGE BEAM) CENTER
3.00

B2 B2 B2 B2 CENTER
2 PCS D12 BOTT. BARS 2 PCS D12 BOTT. BARS
B
6.65

.95
B2 B2 B2 CB

NATURAL GROUND LINE


3.65

B2 12MM DIA NOSING & 0.25


2.97

EB B2 B2 B2 EB
12MM DIA BENT BARS SPACED AT O.25M O.C. STIFFERNER BAR
ALTERNATELY INSTALLED WITH STRAIGH BARS
B2 B2 B2 CB

1.20
A

0.20
.89

0.12M
EB EB
16MM DIA RSB SPACED
EB 12MM DIA BOTTOM BARS LONGITUDINAL BARS AT 0.15M
SPACED @ 0.20M O.C. B.W. AND ACROSS BARS AT 0.25 M
0.30

ON CENTER
2ND FLOOR FRAMING PLAN
SCALE: 1:100 METERS l/4 l/4

F1C1 SECTION STAIR SPOT DETAILS


TYPICAL SLAB DETAILS SCALE: 1:25 METERS

1 2 3 4
9.00
.90 3.00 3.00 3.00 .80

2"X3" PURLINS SPACED


1"X12" FASCIA BOARD
@ 0.60M O.C. 2"X6" TOP CHORD
.90

2"X6" BOTTOM CHORD


A B C
C

RAFTER

1"X12" FASCIA BOARD


RAFTER
RAFTER

RAFTER

2"X4" WEB MEMBER


RAFTER

RAFTER

0.30
0.90 3.65 3.00 0.90
3.00

1.60
HI

ER

10MM DIA VERTICAL.&


P

FT
RA

VA

5.88
RA

HORRIZONTAL BARS
VA

FT

LL
P
ER

EY
LL

HI

SPACED AT 0.20M O.C. 2"X6" TOP CHORD APEX LINE


E
B

RA
Y

BOTHWAYS.
6.65

RA

FTE

2"X6" BOTTOM CHORD


FT

RAFTER
.90
R
1"X12" FASCIA BOARD

ER

NAT. GRND LINE 2"X4" WEB MEMBER

1.40
HI
ER

12MM DIA STIFFENER


FT

RA
RA
3.65
1.60

SPACED AT 0.30M O.C.


FT
P

ER

RAFTER
HI

TOP OF BEAM
3 PCS 12MM DIA APEX LINE
RAFTER
RAFTER

RAFTER
RAFTER

CONTINOUS BARS
0.15

1.40
A

0.30 1.20 1.20 1.20 0.84


TOP OF BEAM
.90

.90

1"X12" FASCIA BOARD


.80 .90

WALL FOOTING DETAILS FULL TRUSS DETAILS HIP TRUSS DETAILS


ROOF FRAMING PLAN SCALE: 1:60 METERS SCALE: 1:60 METERS
SCALE: 1:100 METERS

SHEET CONTENT SHEET NO:

FOUNDATION PLAN
FOOTING PLAN & DETAILS
BEAMS SCHEDULES
ROOF FRAMING PLAN S1
SLAB DETAILS
SCHEDULE OF LOAD & COMPUTATION 1 2 3 4 CHB WALL 90° LONG SWEEP
9.00
1 2 3 4
9.00 3.00 3.00 3.00 1.00 FINISH FLOOR LINE

3.00 3.00 3.00 1.00 CIRCUIT LOAD NO. OF # OF WIRE TO BE


WATTS VOLTS AMPS BREAKER
NUMBER DESCRIPTION OUTLETS USED CO CO

C
CKT 1 LIGHTING 10 1,000 220 4.54 15A 2.00
C

PB S1 KS FD
CKT 2 CONV. OUTLET 4 800 220 3.63 20A 3.50
3
CLEAN OUT AT WALL CLEAN OUT AT FLOOR

3.00
CKT 3 CONV. OUTLET 3 600 220 2.72 20A 3.50 WC
3.00

3.18 FD
S1 CKT 4 LIGHTING 7 700 220 15A 2.00
2 S1

B
DIVIDER DIVIDER

6.65
CKT 5 CONV. OUTLET 5 1,000 220 4.54 20A 3.50
B

DIVIDER S1 DIVIDER UP
6.65

UP
S1

3.65
0.60
TOTAL = 4,100 WATTS 0.60
16MM DIA MANHOLE
3.65

STEEL HANDLE
O.40X0.40M MANHOLE
S1

A
S2
A

4" THICK CHB

2.19

0.60
MAIN SERVICE ENTRANCE COMPUTATION

0.60
1 INLET
2.19

OUTLET INLET
TO SEPTIC TANK OUTLET 10MM DIA RSB
DN
I TOTAL (4,100)(0.85) = 15.84 AMPS SPACED AS SHOWN
220

1ST FLOOR ELECTRICAL LAYOUT USE : 2 -8mm² TTHN ON 1" DIA RSC CONDUIT 1ST FLOOR PLUMBING LAYOUT CATCH BASIN SECTION CATCH BASIN PLAN
SCALE: 1:100 METERS SCALE: 1:100 METERS

GENERAL NOTES
1. ALL ELECTRICAL WORKS & INSTALLATIONS SHALL COMPLY WITH THE PROVISIONS OF THE
LATEST EDITION OF THE PHILIPPINE ELECTRICALCODE WITH THE RULES & REGULATIONS OF
2.60
1 2 3 4 THE NATIONAL
0.80 1.80
9.00 & REGULATIONS OF THE UTILITY COMPANY CONCERNED.
12MM DIA RSB SPACED VTR
.80 3.00 3.00 3.00 BOTHWAYS AT 0.12 M O.C. LEGEND:
2. ALL INSTALLATIONS SHALL BE CONCEALED FROM VIEW. WIRING SHALL BE ENCASED IN PVC WC: WATER CLOSET
VTR
SCHEDULR 40 EXCEPT IN POWER & TELEPHONE ENTRANCE WHICH SHALL BE RIGID STEEL 0.60X0.20 M MANHOLE
FD: FLOOR DRAIN SHO
C

CONDUIT. CO: CLEAN OUT


SHO: SHOWER
CLOSET

KS: KITCHEN SINK


3. SERVICE VOLTAGE TO THE BLDG. SHALL BE 220V 60 HERTZ SINGLE PHASE 2 WIRES LAV
3.00

VTR: VENTILATION THRU ROOF


SYSTEM. WM: WATER METER
4 KS

1.30
CO
S1 S1
CB: CATCH BASIN 3
CO SHO
4. THE CONTRACTOR SHALL VERIFY & ORIENT THE ACTUAL LOCATION OF CONCRETE PLUMBING LINES 2 KS WC
B

ER
S1
6.65

WATER LINES
TERMINAL POLE & CONNECTION TO POWER SUPPLY TEL. 1 UP
DIVID

P TIC T
ANK
DIVID
ER
TO SE
S1
5. MINIMUM WIRE CONDUIT SHALL BE NO.12 AWG TYPE TW 1/20 TRADE RESPECTIVELY UNLESS C
3.65

SW3 OTHERWISE SPECIFIED. B


S1 4
S1 5
6. LIGHT CONTROL SWITCHES SHALL BE RATED TO A REQUIREMENT & SHALL NOT CARRY A
SEPTIC TANK PLAN A
SCALE: 1:100 METERS
LOAD GREATER THAN 5 AMPS.
A

PLUMBING ISOMETRIC
.50 1.00

7. ALL MATERIALS TO BE USED SHALL BE NEW & OF APPROVED TYPE WITH LOCATION SCALE: 1:100 METERS
INTENDED USE.
2.60 METERS
2ND FLOOR ELECTRICAL LAYOUT 8. ALL INSTALLATIONS SHALL BE UNDER THE DIRECT SUPERVISIONS OF A DULY LICENSED
0.80 1.80
SCALE: 1:100 METERS
ELEC'L ENGINEER OR A MASTER ELECTRICIAN.

PLUMBING GENERAL NOTES:


LEGEND 0.60MX0.60M MANHOLE 0.60MX0.60M MANHOLE
0.12M THICK SLAB WITH
12MM RSB SPACED @
0.15M O.C. BOTHWAYS
: SERVICE ENTRANCE 1. ALL WORKS SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL PLUMBING CODE AND LOCAL

0.30
AIR SPACE A I R S P A C E CODE REQUIREMENTS AND SUBDIVISION REQUIREMENTS.

: INCANDESCENT BULB 2. THE PLUMBING LAYOUR IS ONLY DIAGRAMATIC. PIPES, CLEANOUTS, AND CHECHVLAVES SHALL BE
OUTLET 4" DIA PVC INVERTED CONCEALED AS POSSIBLE.
DIGESTIVE TEE INLET
2 - 8MM² THHN ON LEACHING 3. ALL PLUMBING SHALLBNOT BE EMBEDDED ON STRUCUTRAL PARTS UNLESS OTHERWISE SPECIFIED.
: CONVENIENCE OUTLET CHAMBER

1.20
1/2" DIA RSC CHAMBER 4. MINIMUM SLOPE FOR SEWERAGE SHALL BE 2% AND DRAIN 1%.
6" THICK CHB WITH 10mm
dia HORR. & VERT. BARS 5. ALL CO'S SHALL BE FLUSHED MOUNTED TO WALL AND PROVIDE WITH POLISHED COVER CAPS. DO
PLASTERED 6" CHB
60A KSB S1 : SINGLE POLE SWITCH THICK WALL SPACED AT 0.0.60M O.C. NOT INSTALL CLEAN OUTS EXCEPT AT LINE ON GRADE AND SERVICE NOT SUBJECTED TO TRAFFIC
B.W.
FLOWS.

0.25
6. ALL UNDERGROUND G.I. PIPES IN DIRECT CONTAT WITH THE SOIL SHALL BE PROVIDED WITH TWO
S2 : DUPLEX SWITCH COATS OF PROTECTIVE TAR COVERED AND WRAPPED WITH JUTE CLOTHES THOROUGHLY SOAKED WITH
0.12M THICK SLAB WITH 12MM TAR.
DIA RSB SPACED @ 0.20M O.C.

CKT1
15A 15A
CKT2
S3W : 3 WAY SWITCH BOTHWAYS 7. PROVIDE VENTILATION STACK THROUGH ROOF OF PVC AS RERQUIRED AND SHOWN IN TYHE PLANS.
8. PROVIDE GATE VALVES TO ALLOW AND CONTROL WATER FROM WATER SOURCE.
20A 20A
9. PROVIDE WATER PRESSURIZED TANK TO MEET THE WATER DEMAND FROM 1ST TO 3RD FLOOR.
CKT3 CKT4 : PANEL BOX
SEPTIC TANK SECTION 10. ALL PLUMBING WORKS SHALL BE UNDER THE DIRECT SUPERVISION OF A DULY LICENCED SANITARY
ENGINEER OR A MASTER PLUMBER.
: FLOURESCENT LAMP WITH
DIFFUSER
LINE DIAGRAM PER UNIT
SCALE: 1:110 METERS

REVISION SHEET CONTENT SHEET NO:

LIGHTING LAYOUT
POWER LAYOUT
LOAD COMPUTATION
RISER & LINE DIAGRAM
PLUMBING LAYOUT
SEPTIC TANK DETAIL
E1/P1
CATCH BASIN DETAIL GENERAL NOTES

You might also like