You are on page 1of 8

W O R K S H O P

PLUMBING SYMBOL LIST PLUMBING ABBREVIATIONS GENERAL PLUMBING NOTES BUILDING DEPARTMENT NOTES PLOT PLAN

39 WEST 29TH STREET, SUITE 304,


THIS DRAWING IS ONLY VALID FOR CONSTRUCTION, BIDDING OR GOVERNMENT AGENCY REVIEW IF SAID DRAWING BEARS AN ORIGINAL STAMPING OF THE SEAL OF THE ARCHITECT WHOSE SIGNATURE APPEARS HEREON. THIS DRAWING IS THE PRODUCT OF SERVICE AND IS THE PROPERTY OF ICD - WORKSHOP LLC. IT IS TO BE USED ONLY FOR THE PROJECT NOTED HEREIN. REUSE OF THIS DRAWING FOR ANY PART THEREOF FOR ANY OTHER PROJECT OR ALTERATION OR EXTENSION OF
AFF ABOVE FINISHED FLOOR 1. THE PLUMBING CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION THE PLUMBING SYSTEMS (SANITARY, VENT, WATER DISTRIBUTION) AND ALL BOROUGH: MANHATTAN LOT AREA: 2,500 SF
PIPE DOWN OF ALL CONDITIONS AND SHALL CALL SAME TO THE ATTENTION OF THE ASSOCIATED EQUIPMENT WILL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH
BFP BACKFLOW PREVENTER BLOCK: 590 LOT FRONTAGE: 25'
ARCHITECT AND CONSTRUCTION MANAGER IF THEY VARY FROM THE LOCATIONS THE FULL REQUIREMENTS OF THE 2014 NEW YORK CITY PLUMBING CODE, "NYC PC". LOT: 77 LOT DEPTH: 100'
BLDG BUILDING INDICATED IN THE DRAWINGS. THE DRAWINGS ARE NOT TO BE SCALED. ZONING: C1-5 YEAR BUILT: 1926
PIPE UP 1. THE SANITARY SYSTEM SHALL BE IN FULL ACCORDANCE WITH THE GENERAL NUMBER OF BUILDINGS: 1
BVR BALANCING VALVE RIG
2. ALL PLUMBING WORK SHALL BE PERFORMED BY A LICENSED PLUMBING PROVISIONS OF SECTION PC 301. ADDRESS: 9 JONES ST NUMBER OF FLOORS: 7

NEW YORK, NY 10001


CLG CEILING CONTRACTOR AND IN STRICT ACCORDANCE WITH THE RULES AND REGULATIONS NEW YORK, NY 10014 GROSS FLOOR AREA: 15,778 SF
BOTTOM PIPE CONNECTION GOVERNING PLUMBING AND DRAINAGE WORK; SHALL CONFORM TO ALL OTHER 2. THE MATERIALS USED IN THE PLUMBING SYSTEM SHALL BE PROVIDED IN FULL (ESTIMATED)
CM COFFEEMAKER
APPLICABLE REGULATIONS AND SHALL MEET REQUIREMENTS OF INSPECTING ACCORDANCE WITH SECTION PC 303. RESIDENTIAL UNITS: 6
CO CLEANOUT AUTHORITIES INCLUDING THE NYC BUILDING CODE. LAND USE: MULTI-FAMILY
TOP PIPE CONNECTION 3. EQUIPMENT HOOK-UP AND THE JOINING OF PIPING SHALL BE IN FULL ELEVATOR
CODP CLEANOUT DECK PLATE 3. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF COMPLIANCE WITH SECTION PC 605. BUILDINGS
SYSTEMS EXACT LOCATION SHALL BE COORDINATED WITH ALL TRADES,

- D -
X SERVICE CONN CONNECT
ARCHITECTURAL DRAWINGS, GENERAL CONTRACTOR AND PRIME CONTRACTOR. 4. THE INSTALLATION OF FIXTURES WILL BE IN FULL ACCORDANCE WITH CHAPTER 4
RISER RISER LABEL CV CHECK VALVE
# OF THE NYCPC, "FIXTURES, FAUCETS AND FIXTURE FITTING".
NUMBER
CVO CAPPED VALVED OUTLET 4. ALL EXPOSED PIPING PENETRATIONS THROUGH WALLS OR CEILINGS SHALL BE
1 DRAWING KEYNOTE PROVIDED WITH APPROPRIATE FIRE RETARDANT SEALANT AND ESCUTCHEONS. 5. TRAPS FOR FIXTURES AND DRAIN LINES WILL BE PROVIDED AND CLEANOUTS
CW COLD WATER INSTALLED IN FULL ACCORDANCE WITH SECTION PC 708.

I C
R1 RISER KEYNOTE D DRAIN (SANITARY) 5. ALL FIXTURES TO BE SEALED WHERE FIXTURE COMES IN CONTACT WITH WALLS
OR FLOOR WITH CLEAR SEALANT. 6. VERTICAL AND HORIZONTAL PIPING WILL BE HUNG AND SUPPORTED IN THE FULL
SHUT OFF VALVE DN DOWN (PENETRATES FLOOR SLAB) COMPLIANCE WITH SECTION PC 308.
6. COORDINATE ALL WORK WITH ALL OTHER CONTRACTORS PERTAINING TO THE ABS ENGINEERING, PLLC
DW DISHWASHER
LOCATION OF PLUMBING AND DRAINAGE PIPING HVAC WORK, LIGHTING 7. THE WATER SUPPLY SYSTEM OF THE SUBJECT BUILDING SHALL BE INSTALLED IN 39 WEST 29TH STREET, SUITE 304
CHECK VALVE NEW YORK, NY 10001
DWG DRAWING FIXTURES, AND ELECTRICAL, PROVIDE ALL NECESSARY PIPING OFFSETS AND FULL COMPLIANCE WITH CHAPTER 6 OF THE NYCPC, "WATER SUPPLY AND PHONE: 212.317.2361
CHANGES IN DIRECTION TO ACCOMPLISH A COMPLETE INSTALLATION. DISTRIBUTION". EMAIL: info@absengineer.com
GAS COCK FD FLOOR DRAIN WEB: www.absengineer.com

FL FLOOR 7. SUBMISSION OF A PROPOSAL SHALL BE EVIDENCE THAT A CAREFUL 8. THE SANITARY DRAINAGE SYSTEM OF THE SUBJECT BUILDING SHALL BE
TEMPERATURE; PRESSURE GAUGES EXAMINATION OF THE SITE, DRAWINGS & SPECIFICATIONS HAS BEEN MADE AND INSTALLED IN FULL COMPLIANCE WITH CHAPTER 7 OF THE NYCPC, "SANITARY
FT FOOT; FEET THE CONTRACTOR IS FAMILIAR WITH THOSE ITEMS AND AREAS THAT WILL DRAINAGE".
BALANCING VALVE GV GATE VALVE PRESENT DIFFICULTY TO THE PERFORMANCE OF THIS CONTRACT. LATER CLAIMS
SHALL NOT BE MADE FOR LABOR, EQUIPMENT, ETC NECESSARY TO COMPLETE 9. THE VENT PIPING FOR THE SANITARY DRAINAGE SYSTEM SHALL BE INSTALLED IN
VALVE IN VERTICAL GVO GAS VALVED OUTLET ALL WORK AS A RESULT OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE FULL COMPLIANCE WITH CHAPTER 9 OF THE NYCPC, "VENTS". 9 JONES STREET, 5TH
HW HOT WATER BEEN FORESEEN. FLOOR
FLOOR DRAIN, ROOF DRAIN OR AREA DRAIN 10. CHANGES IN DIRECTION IN DRAINAGE PIPING SHALL BE MADE WITH APPROPRIATE
HWR HOT WATER RETURN 8. CONTRACTOR TO VERIFY THE EXISTING SITE AND UTILITY CONDITIONS BEFORE USE OF 45 DEGREE WYES, LONG SWEEPS, SHORT SWEEPS, SIXTH, EIGHT OR
HOUSE TRAP CONSTRUCTION. SIXTEENTH BENDS OR BY A COMBINATION OF THESE OR EQUIVALENT FITTINGS.
IM ICE MAKER
IW INDIRECT WASTE 9. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED 11. SANITARY TEES AND QUARTER BENDS MAY BE USED IN DRAINAGE LINES
CLEAN-OUT DECK PLATE BY THE CONTRACTOR AT THIS SITE BEFORE PROCEEDING WITH ANY WORK. ONLYWHERE THE DIRECTION OF FLOW IS FROM THE HORIZONTAL TO THE
KS KITCHEN SINK
VERTICAL.
CLEAN-OUT / PLUG OUTLET
LAV LAVATORY 10. PRIOR TO STARTING CONSTRUCTION. DETERMINE EXACT INVERT ELEVATION,
SIZE, DEPTH AND LOCATION OF EXISTING CONDITIONS. 12. SHORT SWEEPS WILL BE PERMITTED IN DRAINAGE PIPING 3 INCH DIAMETER OR
CAPPED OUTLET N NEW LARGER FOR ANY OFFSETS EITHER HORIZONTAL OR VERTICAL. SCALE: NOT TO SCALE
NIC NOT IN CONTRACT 11. SANITARY DRAINAGE SHALL HAVE A UNIFORM GRADE OF 1/4" PER FOOT, FOR 2
FRESH AIR INLET 1/2" AND SMALLER AND AN 1/8" PER FOOT FOR 3" OR LARGER, UNLESS
NTS NOT TO SCALE OTHERWISE NOTED.
HOSE BIBB PS PANTRY SINK
12. PROVIDE CLEANOUTS , CLEANOUTS SHALL BE SAME SIZE AS THE PIPES THEY
SOIL PIPING SH SHOWER SERVE UP TO 4 INCHES, AND NOT LESS THAN 4 INCHES FOR LARGER PIPING. SCOPE OF WORK

THIS PROJECT IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF ICD - WORKSHOP LLC. ANY UNAUTHORIZED REUSE IS A VIOLATION OF US. COPYRIGHT LAW. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
SK SINK
VENT PIPING (SANITARY) 13. PROVIDE CLEANOUTS FOR CHANGES IN DIRECTION FOR ALL SANITARY PIPING. FILING HEREWITH PLUMBING WORK FOR THE RENOVATION OF THE CELLAR, BASEMENT, AND FIRST
ST STORM
FLOOR AT THE ADDRESS NOTED.
14. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH RESPECT TO OTHER
UNDERGROUND SOIL PIPING TYP TYPICAL
TRADES, EXISTING STRUCTURE AND CEILING HEIGHTS. CONTRACTOR SHALL
V VENT COORDINATE ALL WORK WITH ARCHITECTURAL LAYOUTS, INCLUDING CEILING STORM
G GAS PIPING
HEIGHTS.
VB VACUUM BREAKER GAS, MODIFICATION:
DOMESTIC COLD WATER PIPING CUT & CONN. GAS PIPING TO PROPOSED APPLIANCES AS SHOWN.
W WASTE

DOMESTIC HOT WATER PIPING WC WATER CLOSET PLUMBING-SPRINKLER


WM WASHING MACHINE
DOMESTIC HOT WATER CIRCULATION PIPING MEDICAL GAS

ELECTRIC TEMPERATURE MAINTENANCE CABLE WATER/SANITARY, MODIFICATION:


CUT & CONN. DOMESTIC WATER PIPING AND SANITARY/VENT TO PROPOSED FIXTURES.
ARROW INDICATES DIRECTION OF FLOW
TENANT PROTECTION PLAN NOTES PER 2014 CODE 28-104.8.4 AND NYC LL154 OF 2017
EXISTING WORK TO BE REMOVED
CONSTRUCTION DOCUMENTS FOR ALTERATIONS OF BUILDINGS IN SERVICE DURING SUCH DISRUPTION. OFF AFTER WORKING HOURS.
WHICH ANY DWELLING UNIT WILL BE OCCUPIED DURING CONSTRUCTION g. CONTRACTOR. AT ALL TIMES, SHALL ENSURE THERE IS NO NATURAL
EXISTING WORK TO REMAIN
SHALL INCLUDE A TENANT PROTECTION PLAN. SUCH PLAN SHALL
CONTAIN A STATEMENT THAT THE BUILDING CONTAINS DWELLING UNITS
8. PUBLIC AVAILABILITY OF TENANT PROTECTION PLAN. UPON ISSUANCE GAS LEAKAGE IN THE BUILDINGS, OR ANY FLAMMABLE GAS TO BE RELATED DOB APPLICATIONS
NEW WORK OF A PERMIT FOR WORK CONTAINING A TENANT PROTECTION PLAN, THE USED DURING CONSTRUCTION.
THAT WILL BE OCCUPIED DURING CONSTRUCTION AND SHALL INDICATE IN
SUFFICIENT DETAIL THE SPECIFIC UNITS THAT ARE OR MAY BE OCCUPIED DEPARTMENT SHALL MAKE THE TENANT PROTECTION PLAN PUBLICLY
CONNECT NEW WORK TO EXISTING DURING CONSTRUCTION, THE MEANS AND METHODS TO BE EMPLOYED AVAILABLE ON ITS WEBSITE. 3. HEALTH REQUIREMENTS:
TO SAFEGUARD THE SAFETY AND HEALTH OF THE OCCUPANTS, a. DUST CONTROL:
DISCONNECT EXISTING WORK INCLUDING, WHERE APPLICABLE, DETAILS SUCH AS TEMPORARY 9. PROVISION OF COPY OF TENANT PROTECTION PLAN TO OCCUPANTS DEBRIS, DIRT, AND DUST TO BE KEPT TO A MINIMUM AND
FIRE-RATED ASSEMBLIES, OPENING PROTECTIVES, OR DUST UPON REQUEST. THE OWNER OF A BUILDING UNDERGOING WORK FOR CONFINED TO THE IMMEDIATE CONSTRUCTION AREA, AND
# REVISION NUMBER CONTAINMENT PROCEDURES. THE ELEMENTS OF THE TENANT PROTECTION WHICH A TENANT PROTECTION PLAN IS REQUIRED BY SECTION SHALL NOT CREATE DUST, DIRT OR OTHER SUCH
PLAN MAY VARY DEPENDING ON THE NATURE AND SCOPE OF THE WORK BUT
AT A MINIMUM SHALL MAKE DETAILED AND SPECIFIC PROVISIONS FOR: 28-104.8.4 SHALL, UPON REQUEST FROM AN OCCUPANT OF A DWELLING INCONVENIENCES TO OTHER APARTMENT UNITS WITHIN THE
UNIT WITHIN SUCH BUILDING, PROVIDE SUCH OCCUPANT WITH A PAPER BUILDING.
1. EGRESS. AT ALL TIMES IN THE COURSE OF CONSTRUCTION PROVISION COPY OF THE TENANT PROTECTION PLAN APPROVED BY THE
SHALL BE MADE FOR ADEQUATE EGRESS AS REQUIRED BY THIS CODE DEPARTMENT.
CONTRACTOR SHALL ISOLATE CONSTRUCTION AREA FROM
PLUMBING FIXTURE COUNT
PLUMBING DEMO NOTES AND THE TENANT PROTECTION PLAN SHALL IDENTIFY THE EGRESS THAT
OCCUPIED BUILDING AREA BY MEANS OF TEMPORARY
PARTITIONS OR HEAVY WEIGHT DROPCLOTH.
WILL BE PROVIDED. REQUIRED EGRESS SHALL NOT BE OBSTRUCTED AT 10. NOTICE TO OCCUPANTS. UPON ISSUANCE OF A PERMIT FOR WORK DEBRIS, DIRT, AND DUST SHALL BE CLEANED-UP AND CLEARED
1. ALL EXISTING MATERIALS AND EQUIPMENT TO BE REMOVED UNDER FLOOR REMOVED RELOCATED NEW
ANY TIME EXCEPT WHERE APPROVED BY THE COMMISSIONER. CONTAINING A TENANT PROTECTION PLAN, THE OWNER SHALL (I)
THIS CONTRACT WILL REMAIN AS THE PROPERTY OF THE OWNER. FROM THE BUILDING SITE PERIODICALLY TO AVOID EXCESSIVE
CONTRACTOR SHALL SUBMIT A LIST OF EQUIPMENT REMOVED TO THE DISTRIBUTE A NOTICE REGARDING SUCH PLAN TO EACH OCCUPIED
ACCUMULATION.
OWNER. CONTRACTOR SHALL RETAIN OR DISPOSE OF ANY MATERIALS 2. FIRE SAFETY. ALL NECESSARY LAWS AND CONTROLS, INCLUDING THOSE DWELLING UNIT OR (II) POST A NOTICE REGARDING SUCH PLAN IN A 5TH FLOOR - 8 5
b. DISPOSAL OF CONSTRUCTION DEBRIS: ALL DEBRIS AND PRODUCTS
AND EQUIPMENT AS DIRECTED BY THE OWNER. WITH RESPECT TO OCCUPIED DWELLINGS, AS WELL AS ADDITIONAL CONSPICUOUS MANNER IN THE BUILDING LOBBY, AS WELL AS ON EACH
OF DEMOLITION NOT DESIGNATED FOR REFUSE SHALL BE
SAFETY MEASURES NECESSITATED BY THE CONSTRUCTION SHALL BE FLOOR WITHIN TEN FEET OF THE ELEVATOR, OR IN A BUILDING WHERE TOTAL - 8 5
2. COORDINATE DEMOLITION WORK SCHEDULE WITH BUILDING REMOVED FROM THE PREMISES AND LEGALLY DISPOSED OF. THE
STRICTLY OBSERVED. THERE IS NO ELEVATOR, WITHIN TEN FEET OF OR IN THE MAIN
MANAGEMENT. SITE SHALL BE LEFT BROOM CLEAN AT THE END OF EVERY
STAIRWELL ON SUCH FLOOR. THE NOTICE SHALL BE IN A FORM
WORKING DAY.
3. ALL EQUIPMENT SHALL BE REMOVED IN A CAREFULLY PLANNED 3. HEALTH REQUIREMENTS. SPECIFICATION OF METHODS TO BE USED CREATED OR APPROVED BY THE DEPARTMENT AND SHALL INCLUDE:
c. PEST CONTROL: SHALL CONFORM TO ARTICLE 13 OF THE NYC
MANNER. FOR CONTROL OF DUST, DISPOSAL OF CONSTRUCTION DEBRIS, 1. A STATEMENT THAT OCCUPANTS OF THE BUILDING MAY OBTAIN A
HOUSING MAINTENANCE CODE WITH REGARDS TO:
PEST CONTROL AND MAINTENANCE OF SANITARY FACILITIES, AND PAPER COPY OF SUCH PLAN FROM THE OWNER AND MAY ACCESS
4. CONTRACTOR TO FIELD VERIFY ALL EXISTING AS BUILT CONDITIONS SUCH PLAN ON THE DEPARTMENT WEBSITE; RODENT AND INSECT ERADICATION; MANDATORY
LIMITATION OF NOISE TO ACCEPTABLE LEVELS SHALL BE INCLUDED.
PRIOR TO DEMOLITION. 2. THE NAME AND CONTACT INFORMATION FOR THE SITE SAFETY EXTERMINATION
3.1. THERE SHALL BE INCLUDED A STATEMENT OF COMPLIANCE WITH
APPLICABLE PROVISIONS OF LAW RELATING TO LEAD AND MANAGER, SITE SAFETY COORDINATOR OR SUPERINTENDENT OF ELIMINATION OF HARBORAGES
5. PATCHING OF EXISTING WALL OR SLAB OPENINGS SHALL BE BY CONSTRUCTION REQUIRED BY SECTION 3301.3 OF THE NEW YORK CITY
ASBESTOS. d. MAINTENANCE OF SANITARY FACILITIES: SHALL CONFORM TO
GENERAL CONTRACTOR (G.C.) PLUMBING CONTRACTOR TO BUILDING CODE, AS APPLICABLE, OR, IF THERE IS NO SITE SAFETY
COORDINATE WITH G.C. ARTICLE 14 OF THE NYC HOUSING MAINTENANCE CODE.
4. COMPLIANCE WITH HOUSING STANDARDS. THE REQUIREMENTS OF THE MANAGER, SITE SAFETY COORDINATOR OR SUPERINTENDENT OF
CONSTRUCTION, THE NAME AND CONTACT INFORMATION OF THE e. NOISE CONTROL: ALL WORK SHALL CONFORM TO LOCAL LAW
6. NOT ALL PLUMBING SYSTEMS ARE SHOWN ON THESE DEMOLITION NEW YORK CITY HOUSING MAINTENANCE CODE, AND, WHERE 113/2005.
DRAWINGS. CONTRACTOR SHALL IDENTIFY EACH PIPE PRIOR TO APPLICABLE, THE NEW YORK STATE MULTIPLE DWELLING LAW SHALL BE 3. A STATEMENT THAT OCCUPANTS OF THE BUILDING MAY CALL 311 f. LEAD: ALL WORK SHALL CONFORM TO LOCAL LAW 1/2004 WITH
DEMOLITION. STRICTLY OBSERVED. TO MAKE COMPLAINTS ABOUT THE WORK. REGARDS TO THE HANDLING OF LEAD.
7. SIZES OF PIPING TO BE REMOVED AND/OR REMAIN HAVE BEEN g. ASBESTOS: ALL WORK SHALL CONFORM TO THE NYS DEP
5. STRUCTURAL SAFETY. NO STRUCTURAL WORK SHALL BE DONE THAT TENANT PROTECTION PLAN SUPPLEMENTAL NOTES
INDICATED BASED ON INITIAL OBSERVATIONS AND ARE NOT VERIFIED.
MAY ENDANGER THE OCCUPANTS.
CONTRACTOR SHALL SURVEY EXISTING SPACE, VERIFY SIZES AND 1. MEANS OF EGRESS: ALL EXISTING MEANS OF EGRESS FOR TENANTS OF HANDLING OF ASBESTOS.
INCLUDE IN SCOPE OF WORK. THE BUILDING TO BE MAINTAINED CLEAR AND FREE OF ALL
6. NOISE RESTRICTIONS. WHERE HOURS OF THE DAY OR THE DAYS OF THE
OBSTRUCTION, SUCH AS BUILDING MATERIALS, TOOLS, ETC. 4. COMPLIANCE WITH HOUSING STANDARDS: ALL WORK SHALL CONFORM
8. NO PIPING SHALL BE REMOVED UNLESS BRANCH SHUT-OFF VALVES WEEK IN WHICH CONSTRUCTION WORK MAY BE UNDERTAKEN ARE
TO THE FOLLOWING WHEN APPLICABLE:
ARE IDENTIFIED AND CLOSED PRIOR TO ACTUAL REMOVAL. LIMITED PURSUANT TO THE NEW YORK CITY NOISE CONTROL CODE,
2. FIRE SAFETY: a. NYC HOUSING MAINTENANCE CODE
SUCH LIMITATIONS SHALL BE STATED
9. CAPPED CONNECTIONS WITH SHUT-OFF VALVES SHALL BE PROVIDED a. ALL BUILDING MATERIALS, WHICH ARE STORED AT THE SITE OR ANY b. NYS MULTIPLE DWELLING LAW
FOR ALL PIPING REMOVED AT POINT OF DISCONNECTION WHERE AREA OF THE BUILDING, ARE TO BE STORED IN A LOCKED AREA.
CONNECTED TO EXISTING PIPING TO REMAIN.
7. MAINTAINING ESSENTIAL SERVICES. WHERE HEAT, HOT WATER, COLD
ACCESS TO THE AREAS TO BE CONTROLLED BY THE OWNER, OR 5. STRUCTURAL SAFETY: NO STRUCTURAL WORK SHALL BE DONE THAT PLUMBING DRAWING LIST
WATER, GAS, ELECTRICITY, OR OTHER UTILITY SERVICES ARE PROVIDED
THE GENERAL CONTRACTOR. MAY ENDANGER THE OCCUPANTS.
10. DRAIN ALL PIPING SECTIONS TO BE REMOVED PRIOR TO ACTUAL IN SUCH BUILDING OR IN ANY DWELLING UNIT LOCATED THEREIN, THE P-001 .00 PLUMBING NOTES, SYMBOLS, AND ABBREVIATIONS
REMOVAL. NO SPILLING OVER FLOOR SLABS WILL BE PERMITTED. TENANT PROTECTION PLAN SHALL SPECIFY THE MEANS AND METHODS b. ALL MATERIALS TO BE STORED IN AN ORDERLY FASHION. P-002 .00 PLUMBING SCHEDULES, FIRMS & ENERGY CODE COMPLIANCE
6. NOISE RESTRICTIONS:
DRAIN PIPES INTO PORTABLE CONTAINERS TO BE DISPOSED OF AS c. ALL FLAMMABLE MATERIALS TO BE KEPT AND TIGHTLY SEALED IN P-101 .00 PLUMBING PART PLANS - 5TH FLOOR
TO BE USED FOR MAINTAINING SUCH SERVICES DURING SUCH WORK IN a. CONSTRUCTION OPERATIONS WILL BE CONFINED TO NORMAL
REQUIRED. THEIR RESPECTIVE MANUFACTURER'S CONTAINERS. SUCH P-201 .00 PLUMBING RISER DIAGRAMS
ACCORDANCE WITH THE REQUIREMENTS OF THE NEW YORK CITY WORKING HOURS: 8:00 AM TO 5:00 PM, MONDAY THRU FRIDAY,
MATERIALS ARE TO BE KEPT FROM SOURCES OF HEAT. P-301 .00 PLUMBING DETAILS SHEET NO. 1
HOUSING MAINTENANCE CODE. IF A DISRUPTION OF ANY SUCH SERVICE EXCEPT LEGAL HOLIDAYS. P-302 .00 PLUMBING DETAILS SHEET NO. 2
IS ANTICIPATED DURING THE WORK, THEN SUCH PLAN SHALL SPECIFY d. ALL FLAMMABLE MATERIALS TO BE USED AND STORED IN AN P-401 .00 PLUMBING SPECIFICATIONS SHEET NO. 1
b. CONTRACTOR MUST OBTAIN WRITTEN PERMISSION FROM ALL
THE ANTICIPATED DURATION OF SUCH DISRUPTION AND THE MEANS ADEQUATELY VENTILATED SPACE. P-402 .00 PLUMBING SPECIFICATIONS SHEET NO. 2
AFFECTED PARTIES TO WORK OUTSIDE OF THE REGULAR HOURS
AND METHODS TO BE EMPLOYED TO MINIMIZE SUCH DISRUPTION, e. ALL ELECTRICAL POWER TO BE SHUT-OFF WHERE THERE ARE
STATED ABOVE.
INCLUDING THE PROVISION OF SUFFICIENT ALTERNATIVES FOR SUCH EXPOSED CONDUIT.
f. ALL ELECTRICAL POWER IN THE CONSTRUCTION AREA TO BE SHUT
W O R K S H O P
39 WEST 29TH STREET, SUITE 304,
THIS DRAWING IS ONLY VALID FOR CONSTRUCTION, BIDDING OR GOVERNMENT AGENCY REVIEW IF SAID DRAWING BEARS AN ORIGINAL STAMPING OF THE SEAL OF THE ARCHITECT WHOSE SIGNATURE APPEARS HEREON. THIS DRAWING IS THE PRODUCT OF SERVICE AND IS THE PROPERTY OF ICD - WORKSHOP LLC. IT IS TO BE USED ONLY FOR THE PROJECT NOTED HEREIN. REUSE OF THIS DRAWING FOR ANY PART THEREOF FOR ANY OTHER PROJECT OR ALTERATION OR EXTENSION OF
FLOOD ZONE MAP RESULT TABULAR ENERGY ANALYSIS (PLUMBING)
BOROUGH: MANHATTAN ADDRESS: 9 JONES ST
BLOCK: 590 NEW YORK, NY 10014
SCALE: NOT TO SCALE SUPPORTING DOCUMENTATION INDEX
LOT: 77 2016 NYC ENERGY CONSERVATION CODE
FEMA FLOOD ZONE RESULTS: CLIMATE ZONE 4A

NEW YORK, NY 10001


MAP PANEL ID: 3604970182F
PUBLICATION DATE: 09/05/2007
FEMA FLOOD ZONE: NONE
SUPPORTING
THIS PROPERTY IS NOT LOCATED IN FEMA SPECIAL FLOOD HAZARD AREA. ITEM
9 JONES ST. CODE PROPOSED DESIGN VALUE RESPECTIVE PRESCRIPTIVE VALUES DOCUMENTATION
DESCRIPTION
LOCATION

- D -
C303.2 INSTALLATION INSTALLING CONTRACTOR TO DWG P-401
CONFIRM PER CONTRACT INSTALLATION INSTRUCTIONS AND THE NEW YORK CITY BUILDING CODE. SPECIFICATIONS
DOCUMENT SPECIFICATIONS. SECTION 011000.B.5

I C
C303.3 MAINTENANCE INSTALLING CONTRACTOR TO MAINTENANCE INSTRUCTIONS SHALL BE FURNISHED FOR EQUIPMENT AND SYSTEMS THAT REQUIRE PREVENTIVE DWG P-401
INFORMATION. PROVIDE FOR ALL EQUIPMENT AND MAINTENANCE. REQUIRED REGULAR MAINTENANCE ACTIONS SHALL BE CLEARLY STATED AND INCORPORATED ON A SPECIFICATIONS
SYSTEMS SCHEDULED, NOTED, READILY ACCESSIBLE LABEL. THE LABEL SHALL INCLUDE THE TITLE OR PUBLICATION NUMBER FOR THE OPERATION SECTION 016000.B.4
AND/OR SPECIFIED IN THE AND MAINTENANCE MANUAL FOR THAT PARTICULAR MODEL AND TYPE OF PRODUCT. ABS ENGINEERING, PLLC
CONTRACT DOCUMENTS. SPECIAL INSPECTIONS (TR-1) 39 WEST 29TH STREET, SUITE 304
NEW YORK, NY 10001
C404.4 PIPE INSULATION COLD WATER: PIPING FROM A WATER HEATER TO THE TERMINATION OF THE HEATED WATER FIXTURE SUPPLY PIPE SHALL BE DWG P-402 PHONE: 212.317.2361
EMAIL: info@absengineer.com
INSULATED IN ACCORDANCE WITH TABLE C403.2.10. PLUMBING
< 1-1/2" = 1/2" SPECIFICATIONS SUPPORTING WEB: www.absengineer.com

SPECIAL
> 1-1/2" = 1" ON BOTH THE INLET AND OUTLET PIPING OF A STORAGE WATER HEATER OR HEATED WATER STORAGE TANK, THE SECTION 220719.B.2 CODE CODE
PIPING TO A HEAT TRAP OR THE FIRST 8 FEET OF PIPING, WHICHEVER IS LESS, SHALL BE INSULATED. INSPECTION
SECTIONS
PIPING THAT IS HEAT TRACED SHALL BE INSULATED IN ACCORDANCE WITH TABLE C403.2.10 OR THE HEAT TRACE
BC 1704.27 FIRE-RESISTANT BC 713.4.1.1.2
< 1-1/2" = 1"
PENETRATIONS AND BC 713.4.1.2
> 1-1/2" = 1-1/2"
JOINTS BC 714.3
BC 714.4
INSTRUCTIONS. PIPE INSULATION SHALL BE CONTINUOUS EXCEPT WHERE THE PIPING PASSES THROUGH A FRAMING
BC 1704.27.1
MEMBER.
BC 1704.27.2
C404.5 EFFICIENT HEATED MAXIMUM PIPING LENGTHS TO BE THE MAXIMUM ALLOWABLE PIPING LENGTH FROM THE NEAREST SOURCE OF HEATED WATER TO THE TERMINATION OF DWG P-201
WATER SUPPLY FIELD VERIFIED TO MATCH THE FIXTURE SUPPLY PIPE SHALL BE IN ACCORDANCE WITH TABLE C404.5.1. PLUMBING DOMESTIC BC 110.3.5 ENERGY CODE
PIPING DOMESTIC WATER RISER DIAGRAM WATER RISER DIAGRAM COMPLIANCE
THE WATER VOLUME IN THE PIPING SHALL BE CALCULATED IN ACCORDANCE WITH SECTION C404.5.2.1. WATER INSPECTIONS
HEATERS, CIRCULATING WATER SYSTEMS AND HEAT TRACE TEMPERATURE MAINTENANCE SYSTEMS SHALL BE
CONSIDERED SOURCES OF HEATED WATER.

PIPING VOLUME & MAXIMUM PIPING

THIS PROJECT IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF ICD - WORKSHOP LLC. ANY UNAUTHORIZED REUSE IS A VIOLATION OF US. COPYRIGHT LAW. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
PROGRESS INSPECTIONS FOR ENERGY CODE COMPLIANCE (TR-8) LENGTHS
NOMINAL PIPING VOLUME MAXIMUM PIPING LENGTH (FEET)
COMPLIANCE SIZE (LIQUID OZ PER FT. PUBLIC LAVATORY OTHER FIXTURES &
PERIODIC REFERENCE STANDARD (SEE ECC (INCHES) LENGTH) FAUCETS APPLIANCES
CODE INSPECTION/TEST PATH: 2016
FEMA FLOOD ZONE RESULTS: (MINIMUM) CHAPTER 6) OR OTHER CRITERIA 1/4" 0.33 6 50
MAP PANEL ID: 3604970182G NYCECC
PUBLICATION DATE: 12/05/2013 5/16" 0.5 4 50
FEMA FLOOD ZONE: NONE IIB3 HVAC AND SERVICE WATER HEATING EQUIPMENT: PRIOR TO FINAL APPROVED CONSTRUCTION DOCUMENTS C403.2, C404.2
PLUMBING AND C404.6, C404.7, 3/8" 0.75 3 50
THIS PROPERTY IS NOT LOCATED IN FEMA SPECIAL FLOOD HAZARD AREA. EQUIPMENT SIZING, EFFICIENCIES AND OTHER PERFORMANCE FACTORS OF ALL MAJOR EQUIPMENT UNITS, AS CONSTRUCTION C404.8, C404.9, 1/2" 1.5 2 43
9 JONES ST. DETERMINED BY THE APPLICANT OF RECORD, AND NO LESS THAN 15% OF MINOR EQUIPMENT UNITS, SHALL INSPECTION C406.2, C406.6, C406.7
BE VERIFIED BY VISUAL INSPECTION AND, WHERE NECESSARY, REVIEW OF MANUFACTURER'S DATA. 5/8" 2 1 32

IIB4 HVAC AND SERVICE WATER HEATING SYSTEM CONTROLS: AFTER INSTALLATION APPROVED CONSTRUCTION DOCUMENTS, C403.2.4, 3/4" 3 0.5 21
AND PRIOR TO FINAL INCLUDING CONTROL SYSTEM NARRATIVES; C403.2.6.1, 4 0.5 16
7/8"
NO LESS THAN 20% OF EACH TYPE OF REQUIRED CONTROLS AND ECONOMIZERS SHALL BE VERIFIED BY ELECTRICAL AND ASHRAE GUIDELINE 1: THE HVAC C403.2.13,
VISUAL INSPECTION AND TESTED FOR FUNCTIONALITY AND PROPER OPERATION. SUCH CONTROLS SHALL CONSTRUCTION COMMISSIONING PROCESS WHERE C403.3, C403.4, C403.5 1" 5 0.5 13
INCLUDE, BUT ARE NOT LIMITED TO: INSPECTION, EXCEPT APPLICABLE C404.6, C404.7,
1-1/4" 8 0.5 8
THAT FOR CONTROLS C404.8, C404.9
SERVICE WATER HEATING WITH SEASONALLY 1-1/2" 11 0.5 6
DEPENDENT
CONTROLS WITH SEASONALLY DEPENDENT FUNCTIONALITY: CONTROLS WHOSE COMPLETE OPERATION FUNCTIONALITY, 2" OR LARGER 18 0.5 4
CANNOT BE DEMONSTRATED DUE TO PREVAILING WEATHER CONDITIONS TYPICAL OF THE SEASON DURING SUCH TESTING SHALL **THE MAXIMUM ALLOWABLE PIPING LENGTH FROM THE NEAREST SOURCE OF HEATED
WHICH PROGRESS INSPECTIONS WILL BE PERFORMED SHALL BE PERMITTED TO BE SIGNED OFF FOR THE BE PERFORMED WATER TO THE TERMINATION OF THE FIXTURE SUPPLY PIPE SHALL BE IN ACCORDANCE
PURPOSE OF A TEMPORARY CERTIFICATE OF OCCUPANCY WITH ONLY A VISUAL INSPECTION, PROVIDED, BEFORE SIGN-OFF WITH THIS TABLE. WHERE PIPING CONTAINS MORE THAN ONE SIZE OF PIPE, THE LARGEST
HOWEVER, THAT THE PROGRESS INSPECTOR SHALL PERFORM A SUPPLEMENTAL INSPECTION WHERE THE FOR ISSUANCE OF A SIZE OF PIPE WITHIN THE PIPING SHALL BE USED FOR DETERMINING THE MAXIMUM
CONTROLS ARE VISUALLY INSPECTED AND TESTED FOR FUNCTIONALITY AND PROPER OPERATION DURING FINAL CERTIFICATE ALLOWABLE LENGTH OF THE PIPING
THE NEXT IMMEDIATE SEASON THEREAFTER. OF OCCUPANCY

THE OWNER SHALL PROVIDE FULL ACCESS TO THE PROGRESS INSPECTOR WITHIN TWO WEEKS OF THE
PROGRESS INSPECTOR'S REQUEST FOR SUCH ACCESS TO PERFORM THE PROGRESS INSPECTION. FOR SUCH
SUPPLEMENTAL INSPECTIONS, THE DEPARTMENT SHALL BE NOTIFIED BY THE APPROVED PROGRESS
INSPECTION AGENCY OF ANY UNRESOLVED DEFICIENCIES IN THE INSTALLED WORK WITHIN 180 DAYS OF SUCH
SUPPLEMENTAL INSPECTION.
HEATED WATER SUPPLY
IID1 MAINTENANCE INFORMATION: PRIOR TO SIGN-OFF APPROVED CONSTRUCTION DOCUMENTS, C303.3, C403.2.11 PIPING MAXIMUM LENGTHS
OR ISSUANCE OF INCLUDING ELECTRICAL DRAWINGS WHERE
MAINTENANCE MANUALS FOR MECHANICAL, SERVICE HOT WATER AND ELECTRICAL EQUIPMENT AND SYSTEMS FINAL CERTIFICATE APPLICABLE; ASHRAE GUIDELINE 4:
REQUIRING PREVENTIVE MAINTENANCE SHALL BE REVIEWED FOR APPLICABILITY TO INSTALLED EQUIPMENT OF OCCUPANCY PREPARATION OF OPERATING AND VOLUME
NOMINAL PIPE SIZE
AND SYSTEMS BEFORE SUCH MANUALS ARE PROVIDED TO THE OWNER. LABELS REQUIRED FOR SUCH MAINTENANCE DOCUMENTATION FOR (LIQUID OUNCES PER
EQUIPMENT OR SYSTEMS SHALL BE INSPECTED FOR ACCURACY AND COMPLETENESS. BUILDING SYSTEMS (INCHES)
FOOT LENGTH) OTHER FIXTURES AND
APPLIANCES
1/2 1.5 43
3/4 3 21
PIPING INSULATION SCHEDULE 1 5 13
1-1/4 8 8
NOMINAL PIPE OR TUBE SIZE
FLUID OPERATING INSULATION CONDUCTIVITY 1-1/2 11 6
(INCHES)
PIPE SERVICE TEMPERATURE
2 OR LARGER 18 4
CONDUCTIVITY MEAN RATING
<1* 1 TO < 1-1/2* 1-1/2 TO < 4 4 TO < 8 >8
(Btu*in. / h*ft2 HEATED WATER SUPPLY PIPING FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH
C404.5.1 OF THE NYC ECC "EFFICIENT HEATED WATER SUPPLY PIPING"
COLD WATER 40 - 60 0.21 - 0.27 75 0.5 0.5 1.0 1.0 1.0
THE MAXIMUM ALLOWABLE PIPING LENGTH FROM THE NEAREST SOURCE OF HEATED
WATER TO THE TERMINATION OF THE FIXTURE SUPPLY PIPE SHALL BE IN ACCORDANCE
PROPERTY IS NOT LOCATED IN A HOT WATER 120 - 140 0.21 - 0.28 100 1.0 1.0 1.5 1.5 1.5
WITH THE FOLLOWING. WHERE THE PIPING CONTAINS MORE THAN ONE SIZE OF PIPE, THE
SPECIAL FLOOD HAZARD AREA (SFHA). PIPING INSULATION EXPOSED TO THE WEATHER SHALL BE PROTECTED FROM DAMAGE, INCLUDING THAT DUE TO SUNLIGHT, MOISTURE, EQUIPMENT LARGEST SIZE OF PIPE WITHIN THE PIPING SHALL BE USED FOR DETERMINING THE
MAINTENANCE AND WIND, AND SHALL PROVIDE SHIELDING FROM SOLAR RADIATION THAT CAN CAUSE DEGRADATION OF THE MATERIAL. ADHESIVE TAPE SHALL MAXIMUM ALLOWABLE LENGTH OF THE PIPING IN TABLE ABOVE. ONLY THE NOMINAL
NOT BE PERMITTED. ALL EXTERIOR PIPING SHALL BE COVERED WITH A PVC OR ALUMINUM VAPOR BARRIER JACKET, OR ALTERNATIVELY PLACED IN A WEATHER PIPING SIZES LISTED ABOVE SHALL BE USED ON THIS PROJECT.
RESISTANT ENCLOSURE, SUCH AS A PIPE RACK WITH A TOP COVER.

PLUMBING EQUIPMENT SCHEDULE PROFESSIONAL STATEMENT


ROUGH-IN CONNECTIONS TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGMENT, THESE PLANS AND
NOTATION SPECIFICATIONS ARE IN COMPLIANCE WITH THE 2016 NEW YORK CITY ENERGY CONSERVATION CODE
DESCRIPTION MANUFACTURER & MODEL LOCATION(S) S./W. I.W. V. C.W. H.W. H.W.R. G. REMARKS: ALL FINISHES BY ARCH.
(NYCECC)
PROVIDE PRIMERED ACCESS PANEL FOR ACCESS TO VALVES- COORD. EXACT
JAY R. SMITH 4765 AS NOTED ON PLAN - CODE COMPLIANCE PATH: NYCECC ASHRAE
AD ACCESS DOOR - - - - - - LOCATION ON "WET WALL" AND FINISH/PAINTING WITH ARCH. & G.C.
12"X12"
ENERGY ANALYSIS: TABULAR ANALYSIS COMCHECK
WASHING MACHINE TO BE PROVIDED WITH ELECTRONIC LEAK DETECTION UNIT
ELECTRONIC LEAK FLOODSTOP ON CW & HW SUPPLY TO TO SHUT OFF WATER SUPPLIES TO UNIT UPON DETECTION OF LEAKING WATER,
LD-E-WM - - - 3 3 - -
WASHING MACHINES 4" 4" POWERED BY COMBINATION (4) AA BATERRIES AND A/C. COORD. LOCATION OF
DETECTION MODEL: FS3/4H
REQ'D GFI OUTLET WITHIN MILLWORK WITH ELECTRICAL CONT. & ARCH.
W O R K S H O P
39 WEST 29TH STREET, SUITE 304,
THIS DRAWING IS ONLY VALID FOR CONSTRUCTION, BIDDING OR GOVERNMENT AGENCY REVIEW IF SAID DRAWING BEARS AN ORIGINAL STAMPING OF THE SEAL OF THE ARCHITECT WHOSE SIGNATURE APPEARS HEREON. THIS DRAWING IS THE PRODUCT OF SERVICE AND IS THE PROPERTY OF ICD - WORKSHOP LLC. IT IS TO BE USED ONLY FOR THE PROJECT NOTED HEREIN. REUSE OF THIS DRAWING FOR ANY PART THEREOF FOR ANY OTHER PROJECT OR ALTERATION OR EXTENSION OF

NEW YORK, NY 10001


- D -
I C
EX. C.W. UP & DN. P
1 EX. H.W. UP & DN. 1
4 EX. S. UP & DN.
EX. V. UP & DN. G ABS ENGINEERING, PLLC
39 WEST 29TH STREET, SUITE 304
G. UP & DN. 1 NEW YORK, NY 10001
SHOWER (TYP.): PHONE: 212.317.2361
EMAIL: info@absengineer.com
2"W. DN. WEB: www.absengineer.com
EXIST. APT. LOCKABLE 2"V. RISE
5
GAS VALVE TO REMAIN 3
4"C.W. & H.W. DROP

WASHING MACHINE:
3"I.W. DN.
PANTRY 2"V. RISE 2
B.T.
DISHWASHER: AD S.H.
3
4"C.W. DROP
(NEW) 3
CONN. W. TO SINK'S (REL.) 4"H.W. DROP
D.W. K.S. RANGE
D.W. TEE. PROVIDE 3 4" 3
(REL.) (REL.) (REL.)
KITCHEN PANTRY
H.W. W/ C.V. & G.V. X-00 3 CLOTHES DRYER:
3/4"G. DROP &
MASTER
X-00 DRYER MASTER
X-00 EXTEND.
KITCHEN SINK: BATH CLOSET
WINE (REL.)
2"W. DN. W.M.
W.C. LAV. LAV.
2"V. RISE (REL.)
3
(REL.) (REL.) (NEW)
4"C.W. & H.W. DROP
REF. W/
REF 1
LIVING C.W.
DINNING X-00 RANGE: W/D MASTER
BEDROOM X-00
3/4"G. DROP &
EXTEND.

REF. W/ C.W.:

THIS PROJECT IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF ICD - WORKSHOP LLC. ANY UNAUTHORIZED REUSE IS A VIOLATION OF US. COPYRIGHT LAW. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
BATHTUB (TYP.):
1/2" C.W. DROP W/ B.V., 2"W. DN.
C.V., V.B. & 4'-0" FLEXIBLE 2"V. RISE
COPPER TUBING 3
4"C.W. & H.W. DROP

WATER CLOSET (TYP.):


4"S. DN.
B.T. 2"V. DN. & RISE
FIRE STAIR (NEW) BEDROOM 2 3
X-00 4"C.W. DROP

ELEVATOR LAVATORY (TYP.):


AD W.C. LAV. 2"W. DN.
(NEW) (NEW) 2"V. RISE
3
4"C.W. & H.W. DROP

MEDIA WALL

EX. C.W. UP & DN.


P EX. H.W. UP & DN. 1
EX. S. UP & DN. 4
2
EX. V. UP & DN.

1 PLUMBING PLAN - 5TH FLOOR


SCALE: 1/4" = 1'-0"

GENERAL PLUMBING NOTES REFERENCE NOTES NATURAL GAS NOTES


1. REFER TO ARCHITECTURAL DWGS. FOR FIXTURE & 9. BUILDING RISER LOCATIONS AND SIZES PROVIDED BY 1 CUT & CONN. NEW C.W. & H.W. PIPING TO EX. RISERS. 3 ALL NEW SANITARY PIPING SHALL BE ROUTED WITHIN GENERAL GAS NOTES:
EQUIPMENT SPECIFICATIONS. ALL MOUNTING, EXISTING BUILDING DRAWINGS. CONTRACTOR TO REM. ALL EX. C.W. & H.W. BRANCH PIPING BACK TO THIS FLOOR OR WITHIN FLOOR JOISTS. COORDINATE 1. ALL GAS CONVEYED IN THIS PROJECT IS LOW PRESSURE (4"W.C.).
FINISHES, ETC. TO BE PER ARCH. DWGS. CONFIRM LOCATION AND SIZING ON SITE BEFORE RISERS INCLUDING EX. SHUT-OFF VALVES AT RISERS. SLOPING OF PIPING AND FIXTURE ELEVATIONS WITH
COMMENCING WORK. NOTIFY ARCHITECT AND/OR CUT & CONN. NEW V. PIPING TO EX. BRANCH PIPING ARCH. FUEL GAS CODE NOTES:
2. FIXTURE FLOW RATES FOR ALL PLUMBING FIXTURES G.C. OF CONFLICTS. IMMEDIATELY OFF STACK. CUT & CONN. NEW S. PIPING 404.1 PROHIBITED LOCATIONS: GAS PIPING SHALL NOT BE INSTALLED IN OR
TO BE IN ACCORDANCE WITH 2014 NYC PC TABLE TO EX. STACK WITHIN THIS FLOOR. NO BRANCH PIPING 4 ALL EX. S., V., C.W. & H.W. PIPING SHALL BE REMOVED THROUGH A DUCTED SUPPLY, RETURN OR EXHAUST DUCT, OR A TRASH
604.4. 10. DOMESTIC WATER OR GAS PIPING SHALL NOT BE RUN SHALL BE RE-USED. VERIFY EXACT LOCATION OF BACK TO EX. RISERS/STACKS INCLUDING ALL OR CLOTHES CHUTE, CHIMNEY OR GAS VENT, VENTILATING DUCT,
WITHIN THE FLOOR. ALL D.W. & G. PIPING SHALL BE RISERS/MAINS IN FIELD AND ROUTE PIPING AS HANGERS, SUPPORTS, FITTINGS, VALVES, ETC. DUMBWAITER OR ELEVATOR SHAFT. PIPING INSTALLED DOWNSTREAM OF
3. REFER TO SANITARY AND DOMESTIC WATER RISER OVERHEAD. NECESSARY. PROVIDE NEW SHUT-OFF VALVE, WATER THE POINT OF DELIVERY SHALL NOT EXTEND THROUGH ANY TOWNHOUSE
DIAGRAMS FOR ALL S., V., C.W., H.W., AND H.W.R. PIPE HAMMER ARRESTOR AND CHECK VALVE AT C.W. & 5 CUT & CONN. NEW GAS PIPING DOWNSTREAM OF UNIT OTHER THAN THE UNIT SERVED BY SUCH PIPING. PIPING, FIXTURES,
SIZES. RISER LOCATIONS INDICATED ON PLAN. 11. NO REDUCTION/MODIFICATION TO BUILDING RISERS H.W. TAPS TO FACILITATE SHUT-DOWN OF BRANCH EXISTING TENANT LOCKABLE SHUT OFF VALVE FOR OR EQUIPMENT SHALL BE LOCATED SO AS NOT TO INTERFERE WITH THE
ARE ALLOWED. LINES AS NECESSARY, PROVIDE ACCESS DOORS AT REROUTED GAS PIPING. PROVIDE NEW FLEXIBLE NORMAL OPERATION OF WINDOWS OR DOORS AND OTHER EXIT
4. PROVIDE NECESSARY CLEANOUTS FOR CHANGES IN EACH VALVE LOCATION AND COORDINATE LOCATION HOSE CONNECTION TO APPLIANCE (MAX. 6' PER NYC OPENINGS. THE FOLLOWING INSTALLATION LIMITATIONS SHALL APPLY:
DIRECTION. WHERE POSSIBLE, PROVIDE WALL 12. ACCESS TO ALL APARTMENT AND BUILDING RISER WITH ARCHITECT. COORD. ALL RISER/STACK FGC 411.1.3).
CLEAN-OUTS WITH ACCESS PANELS. COORDINATE SHUT-OFF VALVES SHALL BE PROVIDED BY MEANS OF SHUT-DOWNS AND TIE-INS WITH BLDG. MGMT. MIN. 1 PER NYC FGC 409.3.1 & 409.5.1, TENANT SHUT OFF 1. STAIR ENCLOSURES: GAS PIPING SHALL NOT BE INSTALLED WITHIN A
WITH ARCH. AN ACCESS DOOR. COORD. W/ ARCH. WEEK PRIOR TO WORK, OR PER BLDG. REG.'S IF VALVE & APPLIANCE SHUT OFF VALVE MUST BE STAIR ENCLOSURE OR REQUIRED EXIT OR EXIT WAY.
LONGER. ACCESSIBLE. PROVIDE PRICING FOR ACCESS PANEL, 2. FIRE-RATED CONSTRUCTION: GAS PIPING SHALL NOT BE INSTALLED
5. VERIFY CEILING SPACE CONDITIONS FOR MAKING 13. ALL WORK SHALL CONFORM TO BUILDING COORD. W/ ARCH. AND G.C. WITHIN FIRE-RATED ASSEMBLIES.
PITCH OF DRAINAGE PIPING PRIOR TO COMMENCING STANDARDS. IT IS THE RESPONSIBILITY OF THE 2 FURNISH AND INSTALL SHUTOFF VALVES AND LEAK CONTRACTOR TO CONFIRM GAS RISER & VALVE 3. PUBLIC CORRIDOR: GAS PIPING SHALL NOT BE INSTALLED IN PUBLIC
WORK. NOTIFY ARCHITECT & G.C. OF ANY CONFLICTS. CONTRACTOR TO COORDINATE ALL WORK AND DETECTION: WATTS "INTELLIFLOW" A2C-WB, WITH LOCATIONS PRIOR TO WORK START. EXIST. APT. GAS CORRIDORS AND EXIT ENCLOSURES.
PROJECT SCOPE WITH BUILDING MANAGEMENT AND A2C-LS LEAK SENSOR. PROVIDE 3" STANDPIPE VALVE TO REMAIN & ALL WORK TO OCCUR AFTER
6. PROVIDE NEW INSULATION FOR ALL NEW DOMESTIC TO FULLY UNDERSTAND BUILDING STANDARDS. RECEPTOR FOR WASHING MACHINE. PROVIDE VALVE. 404.2 PIPING IN SOLID PARTITIONS AND WALLS: CONCEALED PIPING SHALL NOT
WATER AND STORM PIPING WITH CONTINUOUS THERE SHALL BE NO DEVIATION FROM BUILDING WASHING MACHINE OUTLET BOX WITH MINI-RESTER BE LOCATED IN SOLID PARTITIONS AND SOLID WALLS, UNLESS INSTALLED
VAPOR BARRIER AS DESCRIBED IN SPECIFICATION STANDARDS WITHOUT PRIOR WRITTEN APPROVAL WATER HAMMER ARRESTER SIMILAR TO SIOUX CHIEF IN A VENTILATED CHASE OR CASING.
SECTION 220719. FROM BUILDING. OX BOX. REFER TO DETAIL.
TESTING:
7. PLUMBING CONTRACTOR SHOULD PERFORM 14. REFER TO MAXIMUM PIPE LENGTHS FROM SOURCE
PRESSURE TEST OF EXISTING DOMESTIC WATER OF HEATED WATER ON COVER PAGE. ALL H.W. PIPING AS PER NYC DOB BULLETIN 2017-001, IN EXISTING BUILDINGS WITH WITH
RISERS. PROVIDE RESULTS TO ARCHITECT AND IN EXCESS OF LENGTHS INDICATED IN TABLE SHALL DISTRIBUTION PRESSURES NO HIGHER THAN 1/2 PSIG, THE GAS PIPING
ENGINEER TO CONFIRM AVAILABLE PRESSURE BE PROVIDED HEAT TRACE. REFER TO DETAILS FOR SYSTEM WITHIN A SINGLE TENANT SPACE AND DOWNSTREAM OF THE
REQUIRED FOR SCHEDULED FIXTURES. HEAT TRACE INFO AND COORD. WITH ELECTRICAL SHUTOFF VALVE, TESTING MAY BE ISOLATED TO THE INDIVIDUAL TENANT
CONTRACTOR IF REQUIRED. SPACE. THE NEW PIPING AND EXISTING PIPING SHALL BE ISOLATED USING
8. COORDINATE ALL NECESSARY SERVICE SHUT-DOWNS EITHER A DOUBLE BLOCK & BLEED ASSEMBLY OR BY DISCONNECTING THE
WITH BUILDING ENGINEER PRIOR TO COMMENCING NEW PIPING FROM THE EXISTING PIPING AND USING A TEMPORARY
WORK. NIPPLE/COUPLING AND CAP. A SINGLE VALVE, REGARDLESS OF ITS PRESSURE
RATING, SHALL NOT BE USED TO ISOLATE THE TEST UNIT. THE COMPLETE GAS
PIPING SYSTEM WITHIN THE TENANT SPACE AND DOWNSTREAM OF THE
SHUT-OFF VALVE SHALL BE TESTED IN STRICT ACCORDANCE WITH NYC FGC. A
NYC DOB INSPECTOR MUST SIGN OFF ON ALL GAS PIPING WORK.
W O R K S H O P
39 WEST 29TH STREET, SUITE 304,
THIS DRAWING IS ONLY VALID FOR CONSTRUCTION, BIDDING OR GOVERNMENT AGENCY REVIEW IF SAID DRAWING BEARS AN ORIGINAL STAMPING OF THE SEAL OF THE ARCHITECT WHOSE SIGNATURE APPEARS HEREON. THIS DRAWING IS THE PRODUCT OF SERVICE AND IS THE PROPERTY OF ICD - WORKSHOP LLC. IT IS TO BE USED ONLY FOR THE PROJECT NOTED HEREIN. REUSE OF THIS DRAWING FOR ANY PART THEREOF FOR ANY OTHER PROJECT OR ALTERATION OR EXTENSION OF

NEW YORK, NY 10001


P P
1 2

WATER HAMMER WATER HAMMER

- D -
ARRESTOR (TYP.) 6TH FLOOR ARRESTOR (TYP.) 6TH FLOOR
1" 1" 3/4" 3/4" 3/4" 3/4"

I C
1" 3/4" 3/4" 3/4" 3/4"
3/4"
3/4"
REF W/ C.W. 3/4" 3/4" 3/4" 3/4" 3/4"
B.T. B.T. ABS ENGINEERING, PLLC
W.M.
D.W. K.S. V.B. LAV. LAV. (NEW) LAV. (NEW) 39 WEST 29TH STREET, SUITE 304
(REL.) NEW YORK, NY 10001
(REL.) (REL.) (REL.) (NEW) (NEW) PHONE: 212.317.2361
V.B. W.C. W.C. EMAIL: info@absengineer.com
WEB: www.absengineer.com
(REL.) (NEW)
EXIST. C.W., H.W. F EXIST. C.W., H.W.
RISERS RISERS
5TH FLOOR 5TH FLOOR

1 DOMESTIC WATER RISER DIAGRAM


SCALE: NONE

THIS PROJECT IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF ICD - WORKSHOP LLC. ANY UNAUTHORIZED REUSE IS A VIOLATION OF US. COPYRIGHT LAW. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
P P
1 3" STANDPIPE 2
RECEPTOR WITH
4"X3" FUNNEL
6TH FLOOR 6TH FLOOR

2" 2" 2" 2" 2" 2" 2" 2" 2"

2" 2" 2" 2" 2" 2" 2" 2" 2" 2"
LAV LAV LAV
K.S. (REL.) (NEW) W.M. (NEW)
EXIST. S. & V. (REL.) B.T. EXIST. S. & V. B.T.
D.W. W.C. (REL.) W.C.
STACKS (NEW) STACKS (NEW)
(REL.) (REL.) S.H. (REL.)
(REL.)
4" 3" 4"
2" 2" 2"
2" 2" 2" 2"
5TH FLOOR 5TH FLOOR
4" 3" 3" 3"
4" 4" 2" 2" 4" 4" 2"

4TH FLOOR 4TH FLOOR

2 SANITARY RISER DIAGRAM


SCALE: NONE

6TH FLOOR

3
4"

G
G

3 3 G
4" 4" 1

G
PROVIDE ACCESS TO EXIST.
LOCKABLE GAS SHUT OFF
VALVE IN APARTMENT.
DRYER (REL.) RANGE (REL.)
G

(35 CFH) (65 CFH)

5TH FLOOR (E) 1"


EXIST. GAS RISER

1ST FLOOR (E) 1"

(E) 1"

EX. GAS METER SERVING


COOKING FOR ALL APARTMENTS

CELLAR

3 GAS RISER DIAGRAM


SCALE: NONE
W O R K S H O P
39 WEST 29TH STREET, SUITE 304,
THIS DRAWING IS ONLY VALID FOR CONSTRUCTION, BIDDING OR GOVERNMENT AGENCY REVIEW IF SAID DRAWING BEARS AN ORIGINAL STAMPING OF THE SEAL OF THE ARCHITECT WHOSE SIGNATURE APPEARS HEREON. THIS DRAWING IS THE PRODUCT OF SERVICE AND IS THE PROPERTY OF ICD - WORKSHOP LLC. IT IS TO BE USED ONLY FOR THE PROJECT NOTED HEREIN. REUSE OF THIS DRAWING FOR ANY PART THEREOF FOR ANY OTHER PROJECT OR ALTERATION OR EXTENSION OF
TERMINATE SLEEVE STANDARD WEIGHT STEEL
FLUSH WITH FINISHED PIPE SLEEVE OF SIZE TO
WALL SURFACES. PASS PIPE. ROD-DIAMETER
VARIES
(SEE SCHEDULE)
MAX MAX I-BEAM CONC. DECK

NEW YORK, NY 10001


HORIZONTAL VERTICAL
PIPE MATERIAL
SPACING SPACING
FINISHED ESCUTCHEON PLATE (FEET) (FEET) BEAM CLAMP
PACK WITH MINERAL FLUSH AGAINST WALL AND OF SIZE HILTI SHIELD
WOOL. TO COMPLETELY COVER OPENING
(TYP. FOR EACH SIDE) ABS PIPE 4 10b

- D -
BRASS PIPE 10 10
1/2" CLEAR MAX. 3/8" WELDED EYE 3/8" ROD COUP.
OF PIPE AT BASE & AT EACH STORY HEIGHT 3/8" A.T.R.
CAST-IRON PIPE 5a ROD (IF NEEDED)
FINISHED WALL SURFACE NO GREATER THAN 20
FIRE STOPPING SEALANT. DEPTH AS
REQUIRED BY MANUFACTURER. COPPER OR COPPER-ALLOY PIPE 12 AT EACH STORY HEIGHT NO GREATER THAN 12

I C
LOOP HANGER LOOP HANGER
CONCEALED PIPING PIPING EXPOSED TO VIEW COPPER TUBING, 1-1/4" & SMALLER 6 AT EACH STORY HEIGHT NO GREATER THAN 10 (FOR PIPES 1-1/2"
AND SMALLER) PIPE
SLEEVES AND ESCUTCHEONS PIPE
1. SLEEVES FOR PIPING PASSING THROUGH MASONRY WALL SHALL BE SCHEDULE 40, STANDARD GALVANIZED STEEL PIPE; IN FRAMED COPPER TUBING, 1-1/2" & LARGER 10 AT EACH STORY HEIGHT NO GREATER THAN 10 ABS ENGINEERING, PLLC
39 WEST 29TH STREET, SUITE 304
PARTITIONS SHALL BE 20 GAUGE SHEET METAL. THE SPACE BETWEEN THE PIPE AND ITS SLEEVE SHALL NOT EXCEED ONE-HALF INCH. NEW YORK, NY 10001

THE SLEEVE SHALL HAVE A SUFFICIENT LENGTH TO BE FLUSH WITH THE FINISHED WALL SURFACES. STEEL PIPE 12 AT EVERY STORY HEIGHT BEAM CLAMP HILTI SHIELD HANGER PHONE: 212.317.2361
PIPE SIZE PIPE ROD HANGER ROD SIZES EMAIL: info@absengineer.com
NO SCALE NO SCALE WEB: www.absengineer.com

2. EXPOSED PIPING PASSING THROUGH WALLS, FLOORS OR CEILINGS SHALL BE FITTED WITH CHROMIUM PLATED CAST BRASS
IN IN PVC PIPE 4 10b
ESCUTCHEONS W/FASTENING SET SCREWS SIMILAR TO FEE & MASON MANUFACTURING CO., OR RITTER PATTERN AND CASTING CO. PIPE SIZE ROD SIZE
1/2 - 2 3/8 STAINLESS STEEL DRAINAGE SYSTEMS 10 10b IN. IN.
CUTTING AND PATCHING
1. PIPING PASSING THROUGH WALLS SHALL HAVE A TRIM OPENING CUT NO GREATER THAN NECESSARY FOR THE INSTALLATION OF A SLEEVE SECURED 2 1/2 - 3 1/2 NOTES:
a. THE MAX HORIZONTAL SPACING OF CAST -IRON PIPE H ANGERS SHALL BE INCREASED TO 10 FEET 1/2 - 4 3/8
THEREIN.
4-5 5/8 WHERE 10-FOOT LENGTHS OF PIPE ARE INSTALLED
b. MIDSTORY GUIDE FOR SIZES 2 INCHES AND SMALLER 5, 6, 8 1/2
2. PIPING PASSING THROUGH CONCRETE FLOORS SHALL HAVE THE OPENING CORE DRILLED SO THAT THE SPACE BETWEEN THE OPENING AND THE PIPE
SHALL NOT EXCEED ONE-HALF INCH. 6 3/4
10, 12 5/8
3. ANNULAR SPACES BETWEEN PIPING AND SLEEVES OR CORE DRILLED FLOOR OPENINGS SHALL BE PACKED WITH MINERAL WOOL AND SEALED, TO 8 - 12 7/8
RETAIN THE FIRE INTEGRITY OF THE WALLS AND FLOORS, WITH A NON-HARDENING COMPOUND SIMILAR OR EQUAL TO HILTI FS-ONE NYC MEA NO.
326-96-M VOL. IV.

220500 TYPICAL DETAIL OF PIPE INSTALLATION THRU RATED WALL 220529 CLEVIS HANGER DETAIL 210529 HANGER DETAILS

THIS PROJECT IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF ICD - WORKSHOP LLC. ANY UNAUTHORIZED REUSE IS A VIOLATION OF US. COPYRIGHT LAW. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
UNISTRUT PIPE CLAMP CONNECT TO EXISTING BUILDING STRUCTURE USING
UNISTRUT CHANNEL SECURE TO
MINIMUM OF 2 STUDS IN WALL APPROVED TYPE ATTACHEMENTS
PIPE DROP ON WALL
PIPE DROP
ON WALL WITH INCOMPRESSIBLE INSULATING
THREADED ROD BLOCK AT HANGER
DOUBLE LOCKNUTS
A WALL CLEVIS HANGER SHIELD
PIPE SHIELD
THICKNESS
DIAMETER LENGTH
USSG
UP TO 3" 6" 18
UNISTRUT CHANNEL
SECURE TO MIN. OF
2 STUDS IN WALL

WITHOUT INCOMPRESSIBLE INSULATING


UNISTRUT UNISTRUT BLOCK AT HANGER
CHANNEL END UNISTRUT
PIPE CLAMP PIPE CHANNEL SHIELD
CAP (TYP) PIPE SHIELD
INSULATION THICKNESS
DIAMETER LENGTH
USSG
A SLOTTED HEX HEAD
UP TO 3" 12" 18
SCREW AND NUT NOTE:
SECTION A-A GALVANIZED
ELEVATION HANGER, ROD & INSERT
METAL SHIELD SHALL BE DIPPED IN
ZINC CHROMATE PRIMER
PRIOR TO INSTALLATION

PIPE SUPPORT AT WALL TYPICAL PIPE INSULATION DETAIL


HOT OR COLD WATER SUPPLY

INSTALL PER PDI IF HORIZONTAL BRANCH IS LESS THAN 20'


STANDARDS AND LONG, PROVIDE ONE WHA AT END OF LINE.
MANUFACTURER'S INDIRECT DRAIN TO BE
INSTRUCTIONS. IF BRANCH IS GREATER THAN 20' LONG, 3 CENTERED INSIDE 3" SPLASH
PDI PROVIDE A WHA PROVIDE ANOTHER WHA IN MIDDLE, EACH BLIND FLANGE 11 4
SIZE 2.63" (66) THREADED HOLE FOR 3" PIPE PREVENTOR
AT ALL QUICK- SIZED FOR HALF THE FIXTURE UNITS.
"A" CLOSING VALVES.
1.63"
(41) 3/8" (10) MOUNTING HOLE
4" MIN. 3" PIPE(SPLASH PREVENTOR) TO
LAG SCREW
BE CENTERED INSIDE 6"PIPE
SINGLE FIXTURE MULTIPLE FIXTURES
4" FIXED AIR GAP
FIXTURE UNIT TABULATION PRELOAD SPACER (BY KNC)
PDI PIPE FIXTURE
SIZE SIZE UNIT LOAD FIXTURE COLD HOT 5.60" (142) 4" MIN.
12" MIN.
A 1/2" 1-11 VALVE WATER CLOSET 10 --

B 3/4" 12-32 TANK WATER CLOSET 3 --


LEVELING BOLT (BY KNC) TO VENT(BY P.C.)
C 1" 33-60 LAVATORY/SINK 2 2 6"X3"REDUCER 3'-0" MIN. AFF

D 1-1/4" 61-113 SHOWER/BATHTUB 2 2


HANGER ROD SIZES
E 1-1/2" 114-154

F 2" 154-330 PIPE SIZE ROD SIZE TO DRAIN (BY P.C.)


IN. IN.

DO NOT PROVIDE AIR CHAMBERS. PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF, WELDED EYE ROD (SEE SCHEDULE) 1/2 - 4 3/8
PRECISION PLUMBING PRODUCTS, WATTS OR APPROVED EQUIVALENT WITH PISTON AND 0-RING
CONSTRUCTION, HAVING PDI #WH-201, ASSE # 1010 AND ANSI # A112.26.1M CERTIFICATION. 5, 6, 8 1/2
INSTALL IN HORIZONTAL OR VERTICAL POSITION, BUT NEVER UPSIDE DOWN. INSTALL IN LINE 10, 12 5/8
LOOP HANGER (FOR PIPES
WITH WATER FLOW IF POSSIBLE. SIZE THE UNITS AS SHOWN ON THE DRAWINGS AND/OR PER
1-1/2" AND SMALLER, FOR
THE TABLES SHOWN ABOVE. SIOUX CHIEF "MINI-RESTER" MAY BE USED AT EACH FIXTURE. BEAM CLAMP LARGER PIPES, SEE CLEVIS
PIPE
PROVIDE ACCESSIBILITY TO "WHA" WHERE REQUIRED BY LOCAL CODE. NO SCALE HANGER DETAIL)

WATER HAMMER ARRESTORS 220529 PIPE HANGING DETAILS ANTI-SPLASH TYPE INDIRECT WASTE DRAIN
W O R K S H O P
39 WEST 29TH STREET, SUITE 304,
THIS DRAWING IS ONLY VALID FOR CONSTRUCTION, BIDDING OR GOVERNMENT AGENCY REVIEW IF SAID DRAWING BEARS AN ORIGINAL STAMPING OF THE SEAL OF THE ARCHITECT WHOSE SIGNATURE APPEARS HEREON. THIS DRAWING IS THE PRODUCT OF SERVICE AND IS THE PROPERTY OF ICD - WORKSHOP LLC. IT IS TO BE USED ONLY FOR THE PROJECT NOTED HEREIN. REUSE OF THIS DRAWING FOR ANY PART THEREOF FOR ANY OTHER PROJECT OR ALTERATION OR EXTENSION OF
CONCEALED VALVES AND FITTINGS EXPOSED VALVES AND FITTINGS NOTES:
WRAP WITH 1 INCH THICK, 1 POUND DENSITY TO PREMOLDED FIBERGLASS OR RADIAL MITERED 1. COORDINATE REQUIRED WATERPROOFING C.W. SUPPLY
REQUIRED PIPE INSULATION THICKNESS. PIPE INSULATION. WITH BUILDING STANDARD &
SECURE WITH WIRE OR TAPE. SKIM COAT OF INSULATION CEMENT. ARCHITECTURAL DETAILS.
VAPOR SEAL COLD WATER, CHILLED WATER COAT OF MASTIC 2. MOUNT TOILET CARRIER PER SHUT OFF VALVE

NEW YORK, NY 10001


AND STORM WATER PIPING. WRAP WITH FIBERGLASS REINFORCING CLOTH.
MANUFACTURER'S INSTRUCTIONS. CONDENSATE-FREE
FINISH COAT OF MASTIC SOLENOID VALVE
OVERLAP 2 INCHES ON PIPE INSULATION. 3. CARRIERS INSTALLED IN DEMISING WALLS IN-WALL TANK
SHALL MAINTAIN RATING AS REQUIRED,
COORDINATE WITH ARCHITECT.
FIRE RETARDANT JACKET
FIBERGLASS

- D -
3" SECTIONAL PROVIDE ACCESS DOOR
INSULATION AS SCHEDULED

WASTE STACK

I C
PREMOLDED FITTING BACK-OUTLET TOILET DISCHARGE
4"WASTE PIPE
BUTT STRIP AT JOINTS. (1% SLOPE) PROVIDE ACCESS DOOR ABS ENGINEERING, PLLC
SECURE WITH ADHESIVE AS SCHEDULED FOR 39 WEST 29TH STREET, SUITE 304
NEW YORK, NY 10001
AND OUTER HOLDING BAND SEALING LAP. LEAK DETECTOR PHONE: 212.317.2361
OR USE SELF-SEALING LAPS EMAIL: info@absengineer.com
TYPICAL AT ALL JOINTS. SECURE WITH ADHESIVE WEB: www.absengineer.com
ALL SEALS AND LAPS
AT TOP.

18" GAUGE GALVANIZED


MITERED FITTING DRIP PAIN, SIZE AS LEAK DETECTOR SENSOR LOCATED
REQUIRED TO FIT WIDTH OF IN PAN & WIRED TO SOLENOID
IN-WALL TANK WITHIN WALL VALVE). REFER TO PLUMBING
CONSTRUCTION, MIN. 2" H. EQUIPMENT SCHEDULES
W/ WELDED CORNERS

INSULATION FOR EXPOSED AND CONCEALED LOCATIONS IN-WALL TOILET TANK LEAK PROTECTION DETAIL
WALL BOX W/ SHUT-OFF VALVES
WALL BOX W/ AUTOMATIC SHUT-OFF VALVES (WIRED SEPERATATE WALL AND WATER HAMMER ARRESTERS
TO LEAK DETECTION) AND WATER HAMMER SEPARATE WALL BOX BOX FOR WASHING ON HOT & COLD SUPPLIES AS
ARRESTERS ON HOT & COLD SUPPLIES AS FOR WASHING MACHINE MANUFACTURED BY SIOUX CHIEF,
MANUFACTURED BY SIOUX CHIEF, MODEL: OX BOX MACHINE STANDPIPE STANDPIPE MODEL: OX BOX
SINK

THIS PROJECT IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF ICD - WORKSHOP LLC. ANY UNAUTHORIZED REUSE IS A VIOLATION OF US. COPYRIGHT LAW. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
STAINLESS STEEL BRAIDED WATTS MODEL 288A 1-1/2" VENT
WASHER SUPPLY HOSES VACUUM BREAKER

MININIMUM 2'-0" HIGH


STAINLESS STEEL BRAIDED
DISCHARGE HOSE WASHER SUPPLY HOSES

STANDPIPE FOR 3/4"


DISCHARGE HOSE
DISHWASHER
3/4" CW
1-1/2"

WASHING MACHINE 3/4" HW


DRYER
ALL WASHING MACHINES SHALL BE PLACED IN PRE-MANUFACTURED
PLASTIC PAN. PANS SHALL BE PROVIDED WITH ONE (1) SOLID-STATE
LIQUID SENSOR, LIEBERT LIQUI-TECT, FLOODMASTER FM-8, OR WYE TAIL
EQUAL. THE SOLID STATE WATER SENSORS SHALL BE MOUNTED IN 2" WASTE
FITTING
THE PAN UNDER THE WASHING MACHINE TO SENSE THE PRESENCE
STAINLESS STEEL DRIP PAN
OF WATER. THE SENSORS SHALL BE CONNECTED IN THE FIELD TO A
LIQUI-TECTOR PANEL, OR APPROVED EQUAL AND HAVE A RED
4" TALL MIN.
INDICATOR AND AUDIBLE ALARM. COORDINATE LOCATION OF PANEL FLEXIBLE HOSE
WITH ARCHITECT.
WATTS 7C DUAL CHECK VALVE SHUT OFF VALVE (TYP.)
STAINLESS STEEL BRAIDED HOSES SHALL BE USED TO CONNECT THE
LEAK DETECTOR SENSOR LOCATED IN PAN & WATER SUPPLY, WITH A MANUAL SHUT-OFF VALVE TO PREVENT
WIRED TO SOLENOID VALVE). REFER TO 2"X2"X3/4" NEOPRENE VIBRATION ISOLATION
WATER SUPPLY TO THE UNIT WHEN NOT IN USE IN ADDITION TO A
PLUMBING EQUIPMENT SCHEDULES PAD (TYP. FOR 8 FOR WASHER AND DRYER) -
SOLENOID VALVE ACTIVATED BY THE LEAK DETECTOR;
MASON INDUSTRIES OR SIMILAR

WASHING MACHINE AND DRYER DETAIL DETAIL OF HOOK-UP AT CLOTHES WASHER SINK AND DISHWASHER CONNECTION DETAIL
SECTION 011000 - GENERAL REQUIREMENTS BE DEFINED AS THE TIME AT WHICH THE WORK IS TAKEN OVER AND ACCEPTED BY CONTRACTOR OF RESPONSIBILITY FOR COMPLIANCE WITH THE CONTRACT

W O R K S H O P
THE OWNER, AND IS UNDER CARE, CUSTODY, AND CONTROL OF THE OWNER. C. REQUESTS FOR INFORMATION (RFIS): DOCUMENT OR LOCAL CODE REQUIREMENTS. THE SPECIFIED TESTS, INSPECTIONS, SECTION 017300 - EXECUTION

39 WEST 29TH STREET, SUITE 304,


A. SCOPE OF WORK: 2. THE CONTRACTOR SHALL GUARANTEE TO REPLACE OR REPAIR PROMPTLY AND 1. IMMEDIATELY ON DISCOVERY OF THE NEED FOR ADDITIONAL INFORMATION OR AND RELATED ACTIONS DO NOT LIMIT CONTRACTOR'S OTHER QUALITY-ASSURANCE

THIS DRAWING IS ONLY VALID FOR CONSTRUCTION, BIDDING OR GOVERNMENT AGENCY REVIEW IF SAID DRAWING BEARS AN ORIGINAL STAMPING OF THE SEAL OF THE ARCHITECT WHOSE SIGNATURE APPEARS HEREON. THIS DRAWING IS THE PRODUCT OF SERVICE AND IS THE PROPERTY OF ICD - WORKSHOP LLC. IT IS TO BE USED ONLY FOR THE PROJECT NOTED HEREIN. REUSE OF THIS DRAWING FOR ANY PART THEREOF FOR ANY OTHER PROJECT OR ALTERATION OR EXTENSION OF
1. WORK SHOWN ON DRAWINGS AND MENTIONED IN THE SPECIFICATIONS AND ASSUME RESPONSIBILITY FOR ALL EXPENSES INCURRED FOR ANY WORKMANSHIP INTERPRETATION OF THE CONTRACT DOCUMENTS, CONTRACTOR SHALL PREPARE AND -CONTROL PROCEDURES THAT FACILITATE COMPLIANCE WITH THE CONTRACT A. QUALITY ASSURANCE
ADDENDA. ALSO PROVIDE INCIDENTAL WORK AND MATERIALS REQUIRED TO FULFILL AND EQUIPMENT IN WHICH DEFECTS DEVELOP WITHIN THE GUARANTEE PERIOD. THIS AND SUBMIT AN RFI IN THE FORM SPECIFIED. COORDINATE AND SUBMIT RFIS IN A DOCUMENT REQUIREMENTS. REQUIREMENTS FOR CONTRACTOR TO PROVIDE 1. EXISTING CONDITIONS: THE LOCATION OF UTILITIES AND CONSTRUCTION INDICATED
THE INTENT OF THE DRAWINGS, SPECIFICATIONS AND ADDENDA. INCLUDE LABOR, WORK SHALL BE DONE AS DIRECTED BY THE OWNER. THIS GUARANTEE SHALL PROMPT MANNER SO AS TO AVOID DELAYS IN CONTRACTOR'S WORK OR WORK OF QUALITY-ASSURANCE AND -CONTROL SERVICES REQUIRED BY ENGINEER, OWNER, AS EXISTING ARE NOT GUARANTEED. BEFORE BEGINNING WORK, THE CONTRACTOR
MATERIALS, APPURTENANCE, VALVES, DEVICES, CONTROLS, SUPPORTS, ANCHORS, INCLUDE RESPONSIBILITY FOR ALL EXPENSES INCURRED IN REPAIRING AND SUBCONTRACTORS. CONSTRUCTION MANAGER, OR AUTHORITIES HAVING JURISDICTION ARE NOT LIMITED SHALL INVESTIGATE AND VERIFY THE LOCATION OF MECHANICAL AND ELECTRICAL
AND METHODS PECULIAR TO MACHINERY, EQUIPMENT, APPARATUS AND SYSTEMS. REPLACING WORK OF OTHER TRADES AFFECTED BY DEFECTS, REPAIRS OR 2. CONTENT OF THE RFI: INCLUDE A DETAILED, LEGIBLE DESCRIPTION OF ITEM NEEDING BY PROVISIONS OF THIS SECTION. SEE SECTIONS OF DIVISIONS 02 THROUGH 49 SYSTEMS, AND OTHER CONSTRUCTION AFFECTING THE WORK.
2. PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES AND FEES NECESSARY FOR REPLACEMENTS IN EQUIPMENT SUPPLIED BY THIS CONTRACTOR. INFORMATION OR INTERPRETATION AND THE FOLLOWING: SECTIONS FOR SPECIFIC TEST AND INSPECTION REQUIREMENTS. 2. BEFORE CONSTRUCTION, EXAMINE ROUGHING-IN FOR MECHANICAL, PLUMBING, AND
COMPLETE AND SAFE INSTALLATION OF THE WORK AS SHOWN ON THE DRAWINGS 3. THE CONTRACTOR SHALL ALSO REPAIR ALL DAMAGE TO SURROUNDING WORK a) PROJECT NAME, NUMBER; DATE; NAME OF CONTRACTOR, ENGINEER AND ELECTRICAL SYSTEMS TO VERIFY ACTUAL LOCATIONS OF CONNECTIONS BEFORE

NEW YORK, NY 10001


AND HEREIN SPECIFIED, AS REQUIRED FOR COMPLIANCE WITH THE LOCAL BUILDING CAUSED BY THE FAILURE, REPAIR OR REPLACEMENT OF DEFECTIVE EQUIPMENT. CONSTRUCTION MANAGER; RFI NUMBERED SEQUENTIALLY; RFI SUBJECT; SPEC B. DEFINITIONS EQUIPMENT AND FIXTURE INSTALLATION. EXAMINE WALLS, FLOORS, AND ROOFS FOR
CODE, AUTHORITIES HAVING JURISDICTION, BUILDING STANDARDS, AND ALL OTHER 4. THIS CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE AND OPERATION OF ALL NUMBER, TITLE AND RELATED PARAGRAPHS; DRAWING NUMBER AND DETAIL 1. "EXPERIENCED" SHALL MEAN HAVING SUCCESSFULLY COMPLETED A MINIMUM OF SUITABLE CONDITIONS WHERE PRODUCTS AND SYSTEMS ARE TO BE INSTALLED.
APPLICABLE INDUSTRY STANDARDS, NATIONAL CODES AND INSURANCE SYSTEMS UNTIL THE FINAL ACCEPTANCE OF THE WORK. REFERENCES; FIELD DIMENSIONS AND CONDITIONS; SEVEN YEARS OF EXPERIENCE WITH PREVIOUS PROJECTS SIMILAR IN NATURE, SIZE, VERIFY THE LOCATION AND INVERT ELEVATION AT POINTS OF CONNECTION OF FIRE
REQUIREMENTS. b) CONTRACTOR'S SUGGESTED RESOLUTION. IF CONTRACTOR'S SOLUTION(S) AND EXTENT TO THIS PROJECT; BEING FAMILIAR WITH SPECIAL REQUIREMENTS PROTECTION, PLUMBING, MECHANICAL, AND ELECTRICAL SERVICES, AS WELL AS
3. CONTRACTOR THAT PROVIDES AN ITEM OF WORK: EQUIPMENT, COMPONENTS, H. SUPPLEMENTAL ENGINEERING SERVICES IMPACTS THE CONTRACT TIME OR THE CONTRACT SUM, CONTRACTOR SHALL INDICATED; AND HAVING COMPLIED WITH REQUIREMENTS OF AUTHORITIES HAVING RELATED ARCHITECTURAL AND STRUCTURAL ELEMENTS.
FIXTURES, DEVICES, SYSTEMS, ACCESSORIES, APPURTENANCES, PANELS, PIPING, 1. CONTRACTOR AGREES TO COMPENSATE ENGINEER FOR SUPPLEMENTAL STATE IMPACT IN THE RFI. JURISDICTION. 3. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
CONTROLS, WIRING AND CONDUIT, IS RESPONSIBLE FOR THE COMPLETE ENGINEERING SERVICES PROVIDED AS DESCRIBED BELOW. c) ATTACHMENTS: INCLUDE SKETCHES, DESCRIPTIONS, MEASUREMENTS, PHOTOS, BEEN CORRECTED. PROCEEDING WITH THE WORK INDICATES ACCEPTANCE OF

- D -
INSTALLATION INCLUDING ALL SUPPORTS, SEALING, WATERPROOFING, FIRE a. TIME SPENT REVIEWING AND RESEARCHING ANY RFI THAT IS THE RESULT OF A PRODUCT DATA, SHOP DRAWINGS, COORDINATION DRAWINGS, AND OTHER C. CONFLICTING REQUIREMENTS EXISTING CONDITIONS.
STOPPING, PATCHING, SURFACE PREPARATION, PAINTING AND FINISHING. CONTRACTOR'S FAILURE TO REVIEW THE CONTRACT DOCUMENTS. INFORMATION NECESSARY TO FULLY DESCRIBE ITEMS NEEDING INTERPRETATION. 1. REFERENCED STANDARDS: IF COMPLIANCE WITH TWO OR MORE STANDARDS IS 4. VERIFY SPACE REQUIREMENTS AND DIMENSIONS OF ITEMS SHOWN
4. PRIOR TO SUBMITTING BID PRICE, STUDY THE ENTIRE BID SET OF DOCUMENTS TO b. SERVICES FOR COORDINATION AS REQUESTED BY CONTRACTOR OR AS A RESULT 3. THE FOLLOWING RFIS WILL BE RETURNED WITHOUT ACTION: SPECIFIED AND THE STANDARDS ESTABLISH DIFFERENT OR CONFLICTING DIAGRAMMATICALLY ON DRAWINGS. FURNISH INFORMATION TO OWNER THAT IS
DETERMINE THE FULL SCOPE OF THE WORK. REVIEW ALL OF THE DRAWINGS, OF CONTRACTOR'S FAILURE TO COORDINATE IN ACCORDANCE WITH THE a) REQUESTS FOR APPROVAL OF SUBMITTALS OR SUBSTITUTIONS. REQUIREMENTS FOR MINIMUM QUANTITIES OR QUALITY LEVELS, COMPLY WITH THE NECESSARY TO ADJUST, MOVE, OR RELOCATE EXISTING STRUCTURES, SERVICES, OR
SPECIFICATIONS AND ADDENDA, AS OTHER DRAWINGS, SPECIFICATION SECTIONS REQUIREMENTS OF THE CONTRACT. b) REQUESTS FOR COORDINATION INFORMATION ALREADY INDICATED IN THE MOST STRINGENT REQUIREMENT. REFER CONFLICTING REQUIREMENTS THAT ARE OTHER APPURTENANCES OBSTRUCTING OR AFFECTED BY CONSTRUCTION.

I C
AND ADDENDA AFFECT CONTRACTOR'S WORK. c. SERVICES FOR START-UP OF EQUIPMENT AND SYSTEMS AS REQUESTED BY CONTRACT DOCUMENTS. DIFFERENT, BUT APPARENTLY EQUAL, TO ENGINEER FOR A DECISION BEFORE
5. NO CLAIMS FOR ADDITIONAL COSTS OR EXTENSIONS OF TIME WILL BE CONSIDERED CONTRACTOR OR AS A RESULT OF CONTRACTOR'S FAILURE TO PROVIDE START-UP c) REQUESTS FOR ADJUSTMENTS IN THE CONTRACT TIME OR THE CONTRACT SUM. PROCEEDING. C. INSTALLATION
AS A RESULT OF FAILURE TO STUDY THE ENTIRE BID SET OF DOCUMENTS. SERVICES IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT. d) REQUESTS FOR INTERPRETATION OF ENGINEER'S ACTIONS ON SUBMITTALS. 2. MINIMUM QUANTITY OR QUALITY LEVELS: THE QUANTITY OR QUALITY LEVEL SHOWN 1. LOCATE THE WORK AND COMPONENTS OF THE WORK ACCURATELY, IN CORRECT
d. REVIEW, ADMINISTRATION AND PROCESSING OF SUBSTITUTIONS AS REQUESTED e) INCOMPLETE RFIS OR INACCURATELY PREPARED RFIS. OR SPECIFIED SHALL BE THE MINIMUM PROVIDED OR PERFORMED. THE ACTUAL ALIGNMENT AND ELEVATION, AS INDICATED. WHERE SPACE IS LIMITED, INSTALL ABS ENGINEERING, PLLC
B. CONTRACT DOCUMENTS: BY CONTRACTOR. 4. ENGINEER'S ACTION MAY INCLUDE A REQUEST FOR ADDITIONAL INFORMATION, IN INSTALLATION MAY COMPLY EXACTLY WITH THE MINIMUM QUANTITY OR QUALITY COMPONENTS TO MAXIMIZE SPACE AVAILABLE FOR MAINTENANCE AND EASE OF 39 WEST 29TH STREET, SUITE 304
NEW YORK, NY 10001
1. PRIOR TO SUBMISSION OF THE BID, THIS CONTRACTOR SHALL REVIEW THE COMPLETE e. REVIEWS BEYOND THE SECOND REVIEW OF SUBMITTALS AND SHOP DRAWINGS AS WHICH CASE ENGINEER'S TIME FOR RESPONSE WILL DATE FROM TIME OF RECEIPT OF SPECIFIED, OR IT MAY EXCEED THE MINIMUM WITHIN REASONABLE LIMITS. REFER REMOVAL FOR REPLACEMENT. CONCEAL PIPES IN FINISHED AREAS, UNLESS PHONE: 212.317.2361
SET OF BID DOCUMENTS INCLUDING GENERAL CONSTRUCTION, DEMOLITION, A RESULT OF CONTRACTOR'S FAILURE TO MAKE SUBMISSIONS IN ACCORDANCE ADDITIONAL INFORMATION. UNCERTAINTIES TO ENGINEER FOR A DECISION BEFORE PROCEEDING. OTHERWISE INDICATED. EMAIL: info@absengineer.com
WEB: www.absengineer.com
ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION AND WITH THE CONTRACT REQUIREMENTS. 2. COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND RECOMMENDATIONS
SHALL INCLUDE ANY WORK REQUIRED IN THE BID WHICH IS INDICATED OR IMPLIED TO f. INSPECTIONS BEYOND THE INITIAL INSPECTION TO VERIFY COMPLETION OF WORK SECTION 013300 - SUBMITTAL PROCEDURES D. REPORTS AND DOCUMENTS FOR INSTALLING PRODUCTS IN APPLICATIONS INDICATED. INSTALL PRODUCTS AT THE
BE PERFORMED BY THIS TRADE IN OTHER SECTIONS OF THE WORK. AS A RESULT OF CONTRACTOR'S FAILURE TO COMPLETE PUNCH LIST ITEMS. 1. TEST AND INSPECTION REPORTS: PREPARE AND SUBMIT CERTIFIED WRITTEN TIME AND UNDER CONDITIONS THAT WILL ENSURE THE BEST POSSIBLE RESULTS.
2. PLANS AND SPECIFICATIONS ARE BID DOCUMENTS AND ARE FOR THE PURPOSE OF g. ANY SERVICES REQUESTED BY CONTRACTOR OR REQUIRED AS A RESULT OF A. SUBMITTAL PROCEDURES: REPORTS DOCUMENTING TESTS AND INSPECTIONS SPECIFIED IN OTHER SECTIONS. MAINTAIN CONDITIONS REQUIRED FOR PRODUCT PERFORMANCE UNTIL SUBSTANTIAL
ILLUSTRATING THE GENERAL CHARACTER AND SCOPE OF WORK TO PREPARE A BID CONTRACTOR'S FAILURE TO EXECUTE WORK IN ACCORDANCE WITH THE 1. REVIEW STAMP: AFTER THOROUGHLY CHECKING EACH SUBMITTAL, STAMP INCLUDE THE FOLLOWING: COMPLETION.
PROPOSAL. CONTRACT. SUBMITTAL WITH A UNIFORM REVIEW STAMP, WITH SIGNATURE, CERTIFYING THAT a) NAME, ADDRESS, AND TELEPHONE NUMBER OF REPRESENTATIVE MAKING REPORT.
3. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF WORK 2. ENGINEER'S COSTS WILL BE BASED ON ENGINEER'S STANDARD HOURLY BILLING CONTRACTOR HAS REVIEWED IN DETAIL, AND VERIFIED THAT PRODUCTS CONFORM b) STATEMENT ON CONDITION OF SUBSTRATES AND THEIR ACCEPTABILITY FOR D. CUTTING AND PATCHING
AND APPROXIMATE LOCATION OF EQUIPMENT. REFER TO ARCHITECTURAL DRAWINGS RATES AND AMOUNTS WILL BE DEDUCTED FROM CONTRACTOR'S CONTRACT TO THE CONTRACT DOCUMENTS AND VERIFIED ALL DIMENSIONS, CONDITIONS, INSTALLATION OF PRODUCT. 1. EMPLOY SKILLED WORKERS TO PERFORM CUTTING AND PATCHING. PROTECT
FOR FINAL LOCATIONS OF ALL VISIBLE COMPONENTS AND DEVICES. THE DRAWINGS AMOUNT. FEATURES, OPTIONS, ACCESSORIES, ELECTRICAL CHARACTERISTICS AND CONTROLS. c) SUMMARY OF INSTALLATION PROCEDURES BEING FOLLOWED, WHETHER THEY IN-PLACE CONSTRUCTION DURING CUTTING AND PATCHING TO PREVENT DAMAGE.
ARE NOT INTENDED TO SPECIFY OR TO SHOW EVERY OFFSET, FITTING, OR INCLUDE PROJECT NAME AND LOCATION, SUBMITTAL NUMBER, SPECIFICATION COMPLY WITH REQUIREMENTS AND, IF NOT, WHAT CORRECTIVE ACTION WAS 2. CUT IN-PLACE CONSTRUCTION BY SAWING, DRILLING, BREAKING, CHIPPING,
COMPONENT. THE WORK DESCRIBED ON THE CONTRACT DOCUMENTS MAY REQUIRE SECTION 012500 - SUBSTITUTION PROCEDURES SECTION TITLE AND NUMBER, NAME OF REVIEWER, DATE OF CONTRACTOR'S TAKEN. GRINDING, AND SIMILAR OPERATIONS, INCLUDING EXCAVATION, USING METHODS
COMPONENTS AND MATERIALS, WHETHER OR NOT INDICATED OR SPECIFIED, TO APPROVAL AND STATEMENT THAT THE SUBMITTAL HAS BEEN CHECKED AND d) RESULTS OF OPERATIONAL AND OTHER TESTS AND A STATEMENT OF WHETHER LEAST LIKELY TO DAMAGE ELEMENTS RETAINED OR ADJOINING CONSTRUCTION. IN SECTION 018113 - SUSTAINABLE DESIGN REQUIREME
MAKE THE INSTALLATION COMPLETE AND OPERATIONAL. THE CONTRACTOR SHALL A. SUBMIT REQUESTS FOR SUBSTITUTION NO LATER THAN 45 DAYS AFTER AWARD OF APPROVED FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS. OBSERVED PERFORMANCE COMPLIES WITH REQUIREMENTS. GENERAL, USE HAND OR SMALL POWER TOOLS DESIGNED FOR SAWING AND
INCLUDE ALL WORK AS REQUIRED, AND SHALL COORDINATE ALL WORK WITH OTHER CONTRACT. 2. SUBMISSIONS MADE IN ANY OTHER MANNER ARE UNACCEPTABLE AND WILL NOT BE e) OTHER REQUIRED ITEMS INDICATED IN INDIVIDUAL SPECIFICATION SECTIONS. GRINDING, NOT HAMMERING AND CHOPPING. CUT HOLES AND SLOTS NEATLY TO
TRADES TO AVOID CONFLICT. REVIEWED. 2. PERMITS, LICENSES, AND CERTIFICATES: FOR OWNER'S RECORDS, SUBMIT COPIES OF MINIMUM SIZE REQUIRED, AND WITH MINIMUM DISTURBANCE OF ADJACENT
4. PLANS ARE NOT SHOP DRAWINGS AND DO NOT DISMISS THE REQUIREMENTS TO B. OPTIONAL MANUFACTURERS AND SUBSTITUTIONS 3. REVIEW OF SUBMITTALS IS FOR CONFORMANCE TO DESIGN INTENT AND SHOULD NOT PERMITS, LICENSES, CERTIFICATIONS, INSPECTION REPORTS, RELEASES, SURFACES. TEMPORARILY COVER OPENINGS WHEN NOT IN USE.
PREPARE FABRICATION AND INSTALLATION SHOP DRAWINGS, NOR DO THEY RELIEVE 1. SUBMIT BID BASED ON THE SPECIFIED EQUIPMENT, PRODUCTS AND MATERIALS, USED BE MISCONSTRUED AS AN APPROVAL. JURISDICTIONAL SETTLEMENTS, NOTICES, RECEIPTS FOR FEE PAYMENTS,
THE RESPONSIBILITY TO COORDINATE WORK WITH OTHER TRADES AND THE BUILDING AS BASIS OF DESIGN. WHEN OPTIONAL MANUFACTURERS ARE SHOWN OR SPECIFIED, 4. REVIEW DOES NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF JUDGMENTS, CORRESPONDENCE, RECORDS, AND SIMILAR DOCUMENTS, E. PROGRESS CLEANING
STRUCTURE. CONTRACTOR HAS THE OPTION OF WHICH TO USE, PROVIDED THE FOLLOWING PROPER FITTING, COORDINATION AND CONSTRUCTION OF THE WORK, NOR ESTABLISHED FOR COMPLIANCE WITH STANDARDS AND REGULATIONS BEARING ON 1. CLEAN PROJECT SITE AND WORK AREAS DAILY, INCLUDING COMMON AREAS.
5. USE FABRICATION AND INSTALLATION SHOP DRAWINGS ALONG WITH CRITERIA ARE MET: FURNISHING ALL APPURTENANCES, DEVICES, MATERIAL AND LABOR REQUIRED FOR PERFORMANCE OF THE WORK. THIS CONTRACTOR IS RESPONSIBLE FOR ALL FILINGS, DISPOSE OF MATERIALS LAWFULLY. MAINTAIN PROJECT SITE FREE OF WASTE
MANUFACTURER'S INSTALLATION INSTRUCTIONS TO CONSTRUCT THE WORK OF THIS a. OPTIONAL EQUIPMENT, PRODUCT OR MATERIAL MEETS OR EXCEEDS THE DESIGN THE INSTALLATION WHICH MAY NOT BE INDICATED ON THE DRAWINGS, IN THE INSPECTIONS, SIGN-OFFS, INCLUDING ALL APPLICABLE FEES RELATED TO THIS SCOPE MATERIALS AND DEBRIS. CLEAN AREAS WHERE WORK IS IN PROGRESS TO THE LEVEL
CONTRACT. AND PERFORMANCE CRITERIA OF THE ITEM USED AS THE BASIS OF DESIGN. SPECIFICATIONS, OR ON THE SUBMITTALS. OF WORK. OF CLEANLINESS NECESSARY FOR PROPER EXECUTION OF THE WORK. REMOVE
6. PROVIDE INCIDENTAL WORK REQUIRED TO FULFILL THE INTENT OF THE DRAWINGS, b. OPTIONAL EQUIPMENT, PRODUCT OR MATERIAL INCLUDES ALL FEATURES AND LIQUID SPILLS PROMPTLY. WHERE DUST WOULD IMPAIR PROPER EXECUTION OF THE
SPECIFICATIONS, AND ADDENDA. THIS INCLUDES LABOR, MATERIALS, OPTIONS OF THE ITEM USED AS THE BASIS OF DESIGN. B. COORDINATION: E. QUALITY ASSURANCE WORK, BROOM-CLEAN OR VACUUM THE ENTIRE WORK AREA, AS APPROPRIATE.

THIS PROJECT IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF ICD - WORKSHOP LLC. ANY UNAUTHORIZED REUSE IS A VIOLATION OF US. COPYRIGHT LAW. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
APPURTENANCES, DEVICES, CONTROLS, SUPPORTS, ANCHORS AND METHODS c. CONTRACTOR HAS INVESTIGATED FEATURES OF THE OPTIONAL EQUIPMENT, 1. COORDINATE TRANSMITTAL OF DIFFERENT TYPES OF SUBMITTALS FOR RELATED 1. INSTALLER QUALIFICATIONS: A FIRM OR INDIVIDUAL EXPERIENCED IN INSTALLING, 2. REMOVE DEBRIS FROM CONCEALED SPACES BEFORE ENCLOSING THE SPACE. CLEAN
PECULIAR TO THE MACHINERY, EQUIPMENT, APPARATUS OR SYSTEMS. PRODUCT OR MATERIAL AND HAS INCLUDED, IN HIS BID PRICE, COSTS FOR ITS PARTS OF THE WORK SO PROCESSING WILL NOT BE DELAYED BECAUSE OF NEED TO ERECTING, OR ASSEMBLING WORK SIMILAR IN MATERIAL, DESIGN, AND EXTENT TO EXPOSED EQUIPMENT AND PROTECT AS NECESSARY TO ENSURE FREEDOM FROM
7. IF A DISCREPANCY OR CONFLICT OCCURS IN THE SPECIFICATIONS AND/OR ON THE PROPER FITTING AND INSTALLATION. REVIEW SUBMITTALS CONCURRENTLY FOR COORDINATION. ENGINEER RESERVES THAT INDICATED FOR THIS PROJECT, WHOSE WORK HAS RESULTED IN DAMAGE AND DETERIORATION AT TIME OF SUBSTANTIAL COMPLETION. SUPERVISE
DRAWINGS, THE MORE STRINGENT REQUIREMENT SHALL APPLY. d. CONTRACTOR HAS INCLUDED, IN HIS BID PRICE, COSTS OF OTHER TRADES TO THE RIGHT TO WITHHOLD ACTION ON A SUBMITTAL REQUIRING COORDINATION WITH CONSTRUCTION WITH A RECORD OF SUCCESSFUL IN-SERVICE PERFORMANCE. CONSTRUCTION OPERATIONS TO ASSURE THAT NO PART OF THE CONSTRUCTION,
8. ANY EQUIPMENT, PARTS, MATERIALS, ACCESSORIES, OR LABOR THAT ARE NECESSARY ACCOMMODATE THE OPTIONAL EQUIPMENT, PRODUCTS OR MATERIAL. OTHER SUBMITTALS UNTIL RELATED SUBMITTALS ARE RECEIVED. SUBMIT ALL ITEMS COMPLETED OR IN PROGRESS, IS SUBJECT TO HARMFUL, DANGEROUS, DAMAGING,
FOR PROPER PERFORMANCE OF THE WORK ALTHOUGH NOT SPECIFICALLY OF EACH TYPE REQUIRED (SUCH AS ALL PLUMBING FIXTURES) WITHIN A SINGLE F. SPECIAL TESTS AND INSPECTIONS OR OTHERWISE DELETERIOUS EXPOSURE DURING THE CONSTRUCTION PERIOD.
MENTIONED HEREIN OR SHOWN ON THE DRAWINGS, SHALL BE FURNISHED AND C. SUBSTITUTIONS OF EQUIPMENT, PRODUCTS OR MATERIALS OTHER THAN THOSE LISTED SUBMITTAL. 1. PROVIDE ASSISTANCE TO COMPLETE SPECIAL TESTS AND INSPECTIONS, CONDUCTED
INSTALLED WITHOUT ADDITIONAL COSTS. IN THE SPECIFICATIONS, MUST BE MADE WITH A REQUEST IN WRITING. THE REQUEST 2. ON EACH SUBMITTAL, IDENTIFY PROJECT, CONTRACTOR, AND SPECIFICATION BY A QUALIFIED SPECIAL INSPECTOR AS REQUIRED BY AUTHORITIES HAVING SECTION 017700 - CLOSEOUT PROCEDURES
9. THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION" AIA DOCUMENT SHALL INCLUDE THE FOLLOWING ITEMS: SECTION NUMBER. IDENTIFY EACH ITEM WITH THE DESIGNATION THAT APPEARS ON JURISDICTION, AS INDICATED IN INDIVIDUAL SPECIFICATION SECTIONS, INCLUDING
A201, LATEST EDITION, OR AS REQUIRED BY THE ARCHITECT'S DOCUMENTS, AND/OR 1. MANUFACTURER'S LITERATURE THE DRAWINGS. FOR EXAMPLE: EF-1, AC-1. RETESTING AND REINSPECTING CORRECTED WORK AS REQUIRED. A. SUBSTANTIAL COMPLETION
THE ENGINEER'S DOCUMENTS, AS APPLICABLE, SHALL BE MADE PART OF THIS 2. SPECIFICATIONS 3. INCLUDE SUFFICIENT DATA TO SHOW THAT THE PRODUCT SUBMITTED COMPLIES 1. BEFORE REQUESTING INSPECTION FOR DETERMINING DATE OF SUBSTANTIAL
CONTRACT AND SHALL APPLY TO ALL WORK IN THIS CONTRACT UNLESS OTHERWISE 3. CERTIFIED PERFORMANCE DATA WITH THE CONTRACT DOCUMENTS. AS A MINIMUM, INCLUDE PERFORMANCE DATA, G. REPAIR AND PROTECTION COMPLETION, COMPLETE THE FOLLOWING APPLICABLE ITEMS. DO NOT SUBMIT FOR
SPECIFICALLY AMENDED, MODIFIED, SUPPLEMENTED OR SPECIFIED HEREIN. 4. DEVIATIONS FROM THE ITEM SPECIFIED AS BASIS OF DESIGN, IDENTIFIED AND DRAWINGS, FEATURES, OPTIONS AND WIRING DIAGRAMS. 1. ON COMPLETION OF TESTING, INSPECTING, SAMPLE TAKING, AND SIMILAR SERVICES, SUBSTANTIAL COMPLETION UNTIL APPLICABLE ITEMS ARE COMPLETE. CONTRACTOR
MARKED IN RED. 4. ORGANIZE SUBMITTALS BY SYSTEMS AND GROUP TOGETHER DEFINING EACH GROUP. REPAIR DAMAGED CONSTRUCTION AND RESTORE DAMAGED FINISHES. SHALL BE LIABLE FOR DELAY COSTS OF PROJECT AND DELAY COSTS OF OTHER
C. CODES, PERMITS AND INSPECTIONS: 5. THE AMOUNT OF COST DIFFERENCE BETWEEN THE ITEM SPECIFIED AS BASIS OF SUBMISSIONS MADE ANY OTHER WAY ARE UNACCEPTABLE AND WILL NOT BE CONTRACTORS AS A RESULT OF CONTRACTOR'S FAILURE TO COMPLETE APPLICABLE
1. PERMITS DESIGN, AND THE PROPOSED SUBSTITUTION WHICH SHALL BECOME A CREDIT REVIEWED. SECTION 014200 - REFERENCES ITEMS LISTED BELOW.
a. OBTAIN PERMITS, PAY FEES AND ISSUE NOTICES, REQUIRED BY STATE AND LOCAL CHANGE ORDER TO THE OWNER. 5. SHOW DEVIATIONS FROM ITEM IDENTIFIED AS BASIS OF DESIGN AND MARK a. PREPARE A LIST OF ITEMS TO BE COMPLETED AND CORRECTED (PUNCH LIST).
CODES, MUNICIPALITIES AND AUTHORITIES HAVING JURISDICTION. 6. A DETAILED BREAKDOWN OF ITEMS AND COSTS ADDED TO OR DELETED FROM OTHER DEVIATIONS IN RED. A. INDUSTRY STANDARDS b. SUBMIT SPECIFIC WARRANTIES, WORKMANSHIP BONDS, MAINTENANCE SERVICE
b. PROVIDE REQUIRED DRAWINGS, CALCULATIONS, AND TESTING ALL PERFORMED BY CONTRACTS AS A RESULT OF THE PROPOSED SUBSTITUTION. 6. WHEN REVISED FOR RE-SUBMITTAL, IDENTIFY ALL CHANGES MADE SINCE PREVIOUS 1. UNLESS THE CONTRACT DOCUMENTS INCLUDE MORE STRINGENT REQUIREMENTS, AGREEMENTS, FINAL CERTIFICATIONS, AND SIMILAR DOCUMENTS.
A LICENSED ENGINEER IN THE STATE OF NEW YORK. INCLUDE COSTS IN BID PRICE. SUBMITTAL AND MARK AS RE-SUBMITTAL. APPLICABLE CONSTRUCTION INDUSTRY STANDARDS HAVE THE SAME FORCE AND 2. PREPARE AND SUBMIT PROJECT RECORD DOCUMENTS, AS-BUILT DRAWINGS,
c. PROVIDE COPIES OF PERMITS, CERTIFICATES, AND TEST REPORTS TO THE SECTION 013100 - PROJECT COORDINATION 7. FURNISH TO OTHER CONTRACTORS COPIES OF SHOP DRAWINGS, SUBMITTALS, AND EFFECT AS IF BOUND OR COPIED DIRECTLY INTO THE CONTRACT DOCUMENTS TO OPERATION AND MAINTENANCE MANUALS, AND SIMILAR FINAL RECORD
ENGINEER. INSTALLATION DRAWINGS THAT MAY BE REQUIRED FOR PROPER COORDINATION AND THE EXTENT REFERENCED. SUCH STANDARDS ARE MADE A PART OF THE CONTRACT INFORMATION.
2. THE REQUIREMENTS OF APPLICABLE NATIONAL, STATE, AND LOCAL CODES, LAWS, A. COORDINATION: INSTALLATION OF THEIR WORK. DOCUMENTS BY REFERENCE. 3. DELIVER TOOLS, SPARE PARTS, EXTRA MATERIALS, AND SIMILAR ITEMS TO LOCATION
AND REGULATIONS GOVERNING OR RELATING TO ANY PORTION OF THIS WORK SHALL 1. VERIFY THAT ELECTRICAL CHARACTERISTICS OF EQUIPMENT ARE COMPATIBLE TO 2. COMPLY WITH STANDARDS IN EFFECT AS OF DATE OF THE CONTRACT DOCUMENTS DESIGNATED BY OWNER. LABEL WITH MANUFACTURER'S NAME AND MODEL NUMBER
BE INCORPORATED INTO AND MADE A PART OF THESE SPECIFICATIONS. BUILDING SYSTEM ELECTRIC PRIOR TO ORDERING EQUIPMENT. C. PROCESSING TIME: FOR EACH SUBMITTAL OR RESUBMITTAL FOR REVIEW, ALLOW TEN UNLESS OTHERWISE INDICATED. WHERE APPLICABLE.
CONTRACTOR IS TO INFORM ENGINEER OF ANY EXISTING WORK OR MATERIALS 2. PRIOR TO ORDERING EQUIPMENT, VERIFY THAT ELECTRICAL CHARACTERISTICS OF (10) WORKING DAYS EXCLUDING DELIVERY TIME TO AND FROM THE CONTRACTOR AND 3. EACH ENTITY ENGAGED IN CONSTRUCTION ON PROJECT SHOULD BE FAMILIAR WITH 4. COORDINATE FIRST SUBPARAGRAPH BELOW WITH DIVISION 8 DOOR HARDWARE
WHICH ARE IN CONFLICT WITH ANY OF THE ABOVE LAWS AND REGULATIONS. ANY EQUIPMENT ARE THE SAME AS THE EQUIPMENT USED AS THE BASIS OF DESIGN, WEEKENDS AND HOLIDAYS. ALLOW ADDITIONAL TIME IF COORDINATION WITH INDUSTRY STANDARDS APPLICABLE TO ITS CONSTRUCTION ACTIVITY. COPIES OF SECTIONS. REVISE IF OWNER MAKES FINAL CHANGEOVER OR IF KEY-CONTROL
WORK DONE BY THE CONTRACTOR CAUSING SUCH VIOLATION SHALL BE CORRECTED INCLUDING LOAD, REQUIRED WIRE SIZE, BREAKER SIZE AND CONTROL. SUBSEQUENT SUBMITTALS IS REQUIRED. TIME FOR REVIEW SHALL COMMENCE ON APPLICABLE STANDARDS ARE NOT BOUND WITH THE CONTRACT DOCUMENTS. SYSTEM MANUFACTURER DELIVERS KEYS DIRECTLY TO OWNER.
AT CONTRACTOR'S EXPENSE BY THIS CONTRACTOR AND AT NO ADDITIONAL COST TO 3. COORDINATE WORK WITH SUBCONTRACTORS AND SUPPLIERS AS WELL AS WITH ARCHITECT'S RECEIPT OF SUBMITTAL. NO EXTENSION OF THE CONTRACT TIME WILL BE 4. WHERE COPIES OF STANDARDS ARE NEEDED TO PERFORM A REQUIRED a. COMPLETE STARTUP TESTING OF SYSTEMS AND EQUIPMENT.
THE OWNER. OTHER CONTRACTORS. COORDINATE LOCATIONS OF EQUIPMENT, APPURTENANCES, AUTHORIZED BECAUSE OF FAILURE TO TRANSMIT SUBMITTALS ENOUGH IN ADVANCE OF CONSTRUCTION ACTIVITY, OBTAIN COPIES DIRECTLY FROM PUBLICATION SOURCE. b. SUBMIT TEST/ADJUST/BALANCE RECORDS.
3. THIS CONTRACTOR SHALL PERFORM ALL CONTROLLED INSPECTIONS AS REQUIRED PIPING, DUCTWORK, LOADS, CONDUIT, PANELS AND WIRING BEFORE INSTALLATION THE WORK TO PERMIT PROCESSING, INCLUDING RESUBMITTALS. c. COMPLETE FINAL CLEANING REQUIREMENTS.
AND OBTAIN ALL PERMITS AS REQUIRED BY STATE AND LOCAL AUTHORITIES. PERMITS TO AVOID CONFLICTS. B. ABBREVIATIONS AND ACRONYMS d. TOUCH UP AND OTHERWISE REPAIR AND RESTORE MARRED EXPOSED FINISHES TO
SHALL BE TURNED OVER TO OWNER AT JOB COMPLETION. 4. IF A CONFLICT OCCURS, CONTRACTORS WHO INSTALLED WORK WITHOUT D. IDENTIFICATION AND INFORMATION: PLACE A LABEL OR TITLE BLOCK ON EACH 1. WHERE ABBREVIATIONS AND ACRONYMS ARE USED IN SPECIFICATIONS OR OTHER ELIMINATE VISUAL DEFECTS.
4. ALL APPLICABLE EQUIPMENT SHALL BE ACCEPTABLE FOR USE INCLUDING ALL COORDINATING WITH OTHER TRADES AND THE BUILDING STRUCTURE WILL BE SUBMITTAL ITEM FOR IDENTIFICATION. INDICATE NAME OF FIRM OR ENTITY THAT CONTRACT DOCUMENTS, THEY SHALL MEAN THE RECOGNIZED NAME OF THE 5. AFTER ITEMS LISTED IN PARAGRAPH ABOVE ARE COMPLETE, SUBMIT A WRITTEN
CERTIFICATIONS AND STANDARDS AS REQUIRED BY THE AUTHORITY HAVING REQUIRED TO REMOVE THEIR WORK, COORDINATE WITH OTHER CONTRACTORS AND PREPARED EACH SUBMITTAL ON LABEL OR TITLE BLOCK. PROVIDE A SPACE ENTITIES INDICATED IN GALE'S "ENCYCLOPEDIA OF ASSOCIATIONS" OR IN COLUMBIA REQUEST FOR INSPECTION FOR SUBSTANTIAL COMPLETION. ON RECEIPT OF
JURISDICTION. THE BUILDING STRUCTURE, AND THEN REINSTALL IT WITHOUT ADDITIONAL APPROXIMATELY 6 BY 8 INCHES ON LABEL OR BESIDE TITLE BLOCK TO RECORD BOOKS' "NATIONAL TRADE & PROFESSIONAL ASSOCIATIONS OF THE UNITED STATES." REQUEST, ENGINEER WILL EITHER PROCEED WITH INSPECTION OR NOTIFY
COMPENSATION OR EXTENSIONS OF TIME. NO CLAIMS WILL BE CONSIDERED AS A CONTRACTOR'S REVIEW AND APPROVAL MARKINGS AND ACTION TAKEN BY THE CONTRACTOR OF UNFULFILLED REQUIREMENTS. AFTER INSPECTION ENGINEER WILL
D. BUILDING RULES AND REGULATIONS RESULT OF FAILURE TO COORDINATE. ENGINEER'S DECISION IS FINAL. ENGINEER AND CONSTRUCTION MANAGER. INCLUDE: PROJECT NAME, DATE, NAME OF SECTION 016000 - PRODUCT REQUIREMENTS PREPARE A PUNCH LIST. ITEMS ON PUNCH LIST MUST BE COMPLETED OR CORRECTED
1. THIS CONTRACTOR SHALL OBTAIN A COPY OF THE BUILDING RULES AND 5. COORDINATE WORK WITH OWNER. VERIFY THAT INSTALLATION DOES NOT INTERFERE ARCHITECT, NAME OF CONSTRUCTION MANAGER, NAME OF CONTRACTOR, NAME OF BEFORE ENGINEER WILL APPROVE THE ISSUANCE THE CERTIFICATE OF SUBSTANTIAL
REGULATIONS PRIOR TO BID SUBMISSION. ALL WORK MUST BE INSTALLED IN WITH THE OWNER'S OPERATIONS. COORDINATE WITH OWNER AND ACQUIRE SUBCONTRACTOR, NAME OF SUPPLIER, NAME OF MANUFACTURER, SUBMITTAL NUMBER A. PRODUCT DELIVERY, STORAGE, AND HANDLING COMPLETION.
ACCORDANCE WITH THE BUILDING RULES AND REGULATIONS. DETERMINE PERMISSION IN WRITING, TWO (2) WEEKS IN ADVANCE, OF DISCONNECTING THE OR OTHER UNIQUE IDENTIFIER, INCLUDING REVISION IDENTIFIER, NUMBER AND TITLE OF 1. DELIVER, STORE, AND HANDLE PRODUCTS USING MEANS AND METHODS THAT WILL 6. CONTRACTOR'S LIST OF INCOMPLETE ITEMS (PUNCH LIST) SECTION 078413 - PENETRATION FIRESTOPPING
REQUIREMENTS AND THE EXTENT OF PREMIUM TIME WORK REQUIRED BY BUILDING OWNER'S UTILITIES, CHANGING CONSTRUCTION OPERATIONS, CLOSING BUILDING APPROPRIATE SPECIFICATION SECTION, DRAWING NUMBER AND DETAIL REFERENCES, PREVENT DAMAGE, DETERIORATION, AND LOSS, INCLUDING THEFT AND VANDALISM. a. SUBMIT ONE COPY OF LIST. INCLUDE NAME AND IDENTIFICATION OF EACH SPACE
FOR THE PURPOSE OF THE BID. ASSUME ANY NOISY WORK (E.G. CHOPPING, CORE EXITS, CHANGING PATHS OF EGRESS, CLOSING STREETS, CLOSING WALKWAYS OR AS APPROPRIATE, AND LOCATION(S) WHERE PRODUCT IS TO BE INSTALLED, AS COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. AND AREA AFFECTED BY CONSTRUCTION OPERATIONS. IDENTIFY INCOMPLETE
DRILLING, ETC.) AND BASE BUILDING SYSTEMS INTERRUPTIONS ARE TO BE BEGINNING ANY EXCAVATIONS. APPROPRIATE. IDENTIFY OPTIONS REQUIRING SELECTION BY THE ENGINEER. IDENTIFY ITEMS AND ITEMS NEEDING CORRECTION INCLUDING, IF NECESSARY, AREAS
PERFORMED OUTSIDE NORMAL BUSINESS HOURS. 6. COORDINATE WORK WITH LOCATIONS OF CABINETS, SHELVING, ARCHITECTURAL DEVIATIONS FROM THE CONTRACT DOCUMENTS ON SUBMITTALS. B. EQUIPMENT DISTURBED BY CONTRACTOR THAT ARE OUTSIDE THE LIMITS OF CONSTRUCTION.
2. THE BASE BUILDING DRAWINGS, DETAILS, STANDARDS AND SPECIFICATIONS ARE FEATURES, FIXTURES, DIFFUSERS, AND OUTLETS WITH OTHER FINISH ELEMENTS. 1. PROVIDE EQUIPMENT THAT COMPLIES TO THE APPLICABLE CODES, REFERENCES AND INDICATE VALUE OF EACH ITEM AND REASON WHY WORK IS NOT COMPLETE.
MADE PART OF THIS CONTRACT AND SHALL APPLY TO ALL WORK UNDER THE 7. COORDINATE TESTS AND INSPECTIONS WITH AUTHORITIES HAVING JURISDICTION, E. TRANSMITTAL: TRANSMIT EACH SUBMITTAL INDIVIDUALLY AND APPROPRIATELY USING A STANDARDS. EQUIPMENT SHALL BEAR THE STAMPS AND LABELS INDICATING THAT b. ORGANIZE LIST OF SPACES IN SEQUENTIAL ORDER, STARTING WITH EXTERIOR
CONTRACT UNLESS OTHERWISE SPECIFICALLY AMENDED, MODIFIED, SUPPLEMENTED SUBCONTRACTORS, SUPPLIERS, OTHER CONTRACTORS AND THE OWNER. TRANSMITTAL FORM. RECORD RELEVANT INFORMATION, REQUESTED DATA, REVISIONS THE EQUIPMENT COMPLIES WITH PERTINENT STANDARDS. AREAS FIRST AND PROCEEDING FROM LOWEST FLOOR TO HIGHEST FLOOR.
OR SPECIFIED HEREIN. 8. COORDINATE START-UP OPERATIONS WITH OTHER CONTRACTORS, FROM PREVIOUS SUBMITTALS, AND DEVIATIONS FROM REQUIREMENTS IN THE 2. PROVIDE EQUIPMENT THAT MEETS THE REQUIREMENTS OF THE PROJECT c. INCLUDE THE FOLLOWING INFORMATION AT THE TOP OF EACH PAGE:
SUBCONTRACTORS, SUPPLIERS AND MANUFACTURER. ASSURE THAT OTHER CONTRACT DOCUMENTS. CONDITIONS INCLUDING, BUT NOT LIMITED TO: FEATURES, OPTIONS, SIZE, ACCESS, PROJECT NAME.
E. WORK RESTRICTIONS: CONTRACTORS, SUBCONTRACTORS, SUPPLIERS AND MANUFACTURER ARE PRESENT SERVICE, ELECTRICAL CHARACTERISTICS, CONTROLS AND INSTALLATION. DATE.
1. INSTALL ALL NEW WORK IN A NEAT WORKMANLIKE MANNER READILY ACCESSIBLE FOR FOR START-UP OPERATIONS. F. RESUBMITTALS: MAKE RESUBMITTALS IN SAME FORM AND NUMBER OF COPIES AS COORDINATE EQUIPMENT SIZE, DETAILS, ELECTRIC CHARACTERISTICS, ELECTRIC NAME OF ENGINEER.
OPERATION, MAINTENANCE AND REPAIR. INITIAL SUBMITTAL. NOTE DATE AND CONTENT OF PREVIOUS SUBMITTAL AND OF THE LOAD, CONTROL AND INSTALLATION WITH EQUIPMENT SUPPLIER, CONTROL NAME OF CONTRACTOR.
2. WORK RESTRICTIONS, GENERAL: COMPLY WITH RESTRICTIONS ON CONSTRUCTION B. COMPOSITE COORDINATION DRAWINGS: REVISION IN THE LABEL OR TITLE BLOCK. CLEARLY INDICATE EXTENT OF REVISION. CONTRACTOR AND ELECTRICAL CONTRACTOR AND OTHER TRADES THAT MAY AFFECT PAGE NUMBER.
OPERATIONS. LIMIT WORK IN THE EXISTING BUILDING TO NORMAL BUSINESS 1. PREPARE COMPOSITE COORDINATION DRAWINGS IN ACCORDANCE WITH THE RESUBMIT SUBMITTALS UNTIL THEY ARE MARKED WITH "NO OBJECTION" NOTATION. THE BID PRICE PRIOR TO SUBMITTING THE BID AND PRIOR TO ORDERING YOUR
WORKING HOURS AS ESTABLISHED BY THE BUILDINGS OWNER, EXCEPT AS REQUIREMENTS IN INDIVIDUAL SECTIONS, WHERE INSTALLATION IS NOT COMPLETELY EQUIPMENT. NO ADDITIONAL COSTS WILL BE CONSIDERED AS A RESULT OF FAILURE B. FINAL COMPLETION
OTHERWISE INDICATED. SHOWN ON SHOP DRAWINGS, WHERE LIMITED SPACE AVAILABILITY NECESSITATES G. SHOP DRAWINGS: PREPARE PROJECT-SPECIFIC INFORMATION, DRAWN ACCURATELY TO TO COORDINATE. 1. SUBMIT A CERTIFIED COPY OF ENGINEER'S PUNCH LIST. THE CERTIFIED COPY OF THE
3. EXISTING UTILITY INTERRUPTIONS: DO NOT INTERRUPT UTILITIES SERVING FACILITIES COORDINATION, OR IF COORDINATION IS REQUIRED TO FACILITATE INTEGRATION OF SCALE. SHOP DRAWING SIZE: AT LEAST 8-1/2"x11" BUT NO LARGER THAN 30"x42". 3. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE LIST SHALL STATE THAT EACH ITEM HAS BEEN COMPLETED OR OTHERWISE RESOLVED
OCCUPIED BY OWNER OR OTHERS UNLESS PERMITTED IN WRITING BY THE OWNER PRODUCTS AND MATERIALS FABRICATED OR INSTALLED BY MORE THAN ONE ENTITY. MANUFACTURER'S RECOMMENDATIONS. THE CONTRACTOR SHALL OBTAIN DETAILED FOR THE OWNER'S ACCEPTANCE.
AND THEN ONLY AFTER PROVIDING TEMPORARY UTILITY SERVICES ACCORDING TO 2. CONTENT: PROJECT-SPECIFIC INFORMATION, DRAWN ACCURATELY TO A SCALE H. SAMPLES: SUBMIT SAMPLES FOR REVIEW OF KIND, COLOR, PATTERN, AND TEXTURE AS INSTALLATION INSTRUCTIONS FROM THE MANUFACTURER PRIOR TO INSTALLING THE 2. INSTRUCT OWNER'S PERSONNEL IN OPERATION, ADJUSTMENT, AND MAINTENANCE OF
THE BUILDINGS REQUIREMENTS. NOTIFY ENGINEER AND OWNER NOT LESS THAN (7) LARGE ENOUGH TO INDICATE AND RESOLVE CONFLICTS. REQUESTED BY THE ARCHITECT. ATTACH LABEL ON UNEXPOSED SIDE OF SAMPLES EQUIPMENT. THIS SHALL INCLUDE WIRING DIAGRAMS FOR THE SPECIFIC PRODUCTS, EQUIPMENT, AND SYSTEMS. SUBMIT COPY OF TRAINING MATERIALS.
DAYS IN ADVANCE OF PROPOSED UTILITY INTERRUPTIONS. OBTAIN OWNER'S WRITTEN a) INDICATE FUNCTIONAL AND SPATIAL RELATIONSHIPS OF THE COMPONENTS OF THAT INCLUDES GENERIC DESCRIPTION OF SAMPLE, PRODUCT NAME AND NAME OF INSTALLATIONS WHICH SHALL BE COORDINATED WITH THE ATC SUBCONTRACTOR, 3. SUBMIT A WRITTEN REQUEST FOR FINAL INSPECTION FOR ACCEPTANCE. ON RECEIPT
PERMISSION BEFORE PROCEEDING WITH UTILITY INTERRUPTIONS. ARCHITECTURAL, STRUCTURAL, PLUMBING, FIRE PROTECTION, MECHANICAL, AND MANUFACTURER, NUMBER AND TITLE OF SPECIFICATION SECTION. ELECTRICAL CONTRACTOR AND OTHER CONTRACTORS AFFECTED BY THE OF REQUEST, ENGINEER AND CONSTRUCTION MANAGER WILL EITHER PROCEED
4. COORDINATE OPERATIONS THAT MAY RESULT IN HIGH LEVELS OF NOISE AND ELECTRICAL SYSTEMS, AS WELL AS ALL OTHER COMPONENTS AS REQUIRED. INSTALLATION OF THE EQUIPMENT. WITH INSPECTION OR NOTIFY CONTRACTOR OF UNFULFILLED REQUIREMENTS.
VIBRATION, ODORS, OR OTHER DISRUPTION TO BUILDING OCCUPANTS WITH OWNER. b) INDICATE DIMENSIONS SHOWN ON THE DRAWINGS. SPECIFICALLY NOTE I. QUALIFICATIONS AND CERTIFICATES: SUBMIT RECORD OF CAPABILITIES AND 4. INSTALLATION INSTRUCTIONS AND WIRING DIAGRAMS SHALL BECOME PART OF THE ENGINEER WILL PREPARE A FINAL CERTIFICATE FOR PAYMENT AFTER INSPECTION OR
ASSUME ALL SUCH WORK SHALL BE PERFORMED OUTSIDE NORMAL BUSINESS DIMENSIONS THAT APPEAR TO BE IN CONFLICT WITH SUBMITTED EQUIPMENT AND EXPERIENCE OF FIRM AND CERTIFIED PERSONNEL. INCLUDE QUALIFICATION RECORDS, OPERATIONS AND MAINTENANCE MANUALS. WILL NOTIFY CONTRACTOR OF CONSTRUCTION THAT MUST BE COMPLETED OR
HOURS. MINIMUM CLEARANCE REQUIREMENTS. PROVIDE ALTERNATE SKETCHES TO LISTS OF COMPLETED PROJECTS WITH PROJECT NAMES AND ADDRESSES, CONTACT CORRECTED BEFORE CERTIFICATE WILL BE ISSUED.
ENGINEER INDICATING PROPOSED RESOLUTION OF SUCH CONFLICTS. MINOR INFORMATION OF ARCHITECTS AND OWNERS. C. STARTING AND ADJUSTING 4. REINSPECTION: REQUEST REINSPECTION WHEN THE WORK IDENTIFIED IN PREVIOUS
F. SITE VERIFICATION: DIMENSION CHANGES AND DIFFICULT INSTALLATIONS WILL NOT BE CONSIDERED 1. START EQUIPMENT AND OPERATING COMPONENTS TO CONFIRM PROPER OPERATION. INSPECTIONS AS INCOMPLETE IS COMPLETED OR CORRECTED.
1. PRIOR TO SUBMISSION OF THE BID, THIS CONTRACTOR SHALL VISIT THE JOB SITE TO CHANGES TO THE CONTRACT. J. DELEGATED-DESIGN SERVICES: WHERE PROFESSIONAL DESIGN SERVICES OR REMOVE MALFUNCTIONING UNITS, REPLACE WITH NEW UNITS, AND RETEST. ADJUST
ASCERTAIN THE ACTUAL FIELD CONDITIONS AS THEY RELATE TO THE WORK 3. ORGANIZE COORDINATION DRAWINGS TO SHOW ARCHITECTURAL AND STRUCTURAL CERTIFICATIONS ARE SPECIFICALLY REQUIRED OF CONTRACTOR, PROVIDE PRODUCTS EQUIPMENT FOR PROPER OPERATION. TEST EACH PIECE OF EQUIPMENT TO VERIFY C. AS BUILT DRAWINGS:
INDICATED ON THE DRAWINGS AND DESCRIBED HEREIN. DISCREPANCIES, IF ANY, ELEMENTS, AND MECHANICAL, PLUMBING, FIRE PROTECTION, FIRE ALARM, AND AND SYSTEMS COMPLYING WITH SPECIFIC PERFORMANCE AND DESIGN CRITERIA AS PROPER OPERATION. TEST AND ADJUST CONTROLS AND SAFETIES. REPLACE 1. SUBMIT A SET OF REPRODUCIBLE AS-BUILT DRAWINGS SHOWING ALL WORK IN DETAIL
SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION PRIOR TO SUBMISSION OF THE ELECTRICAL WORK. SHOW LOCATIONS OF VISIBLE CEILING-MOUNTED DEVICES INDICATED OR REQUIRED BY CODE. IN ADDITION TO SHOP DRAWINGS, PRODUCT DATA, DAMAGED AND MALFUNCTIONING CONTROLS AND EQUIPMENT. TO DESIGN ENGINEER OF RECORD.
BID, AND IF NOT RESOLVED TO SATISFACTION, SHALL BE SUBMITTED AS A WRITTEN RELATIVE TO ACOUSTICAL CEILING GRID. LOCATE COMPONENTS WITHIN CEILING AND OTHER REQUIRED SUBMITTALS, SUBMIT THREE PAPER COPIES OF CERTIFICATE, 2. ENGAGE THE SERVICES OF VARIOUS MANUFACTURERS SUPPLYING THE EQUIPMENT 2. SUBMIT A SET OF AS-BUILT DRAWINGS ON SEPIA-MYLAR SHOWING ALL WORK IN
QUALIFICATION OF THE BID. PLENUM TO ACCOMMODATE LAYOUT OF LIGHT FIXTURES INDICATED ON DRAWINGS. SIGNED AND SEALED BY THE RESPONSIBLE DESIGN PROFESSIONAL, FOR EACH FOR THE PROPER STARTUP AND OPERATION OF ALL SYSTEMS INSTALLED. INSTRUCT DETAIL TO BUILDING ENGINEER.
2. SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH AN PROVIDE COORDINATION DRAWINGS FOR MECHANICAL ROOMS SHOWING PLANS AND PRODUCT AND SYSTEM SPECIFICALLY ASSIGNED TO CONTRACTOR TO BE DESIGNED OR THE OWNERS PERSONNEL IN THE PROPER OPERATION AND SERVICING OF THE
EXAMINATION HAS BEEN PERFORMED AS DESCRIBED ABOVE AND LATER CLAIMS WILL ELEVATIONS OF MECHANICAL, PLUMBING, FIRE PROTECTION, FIRE ALARM, AND CERTIFIED BY A DESIGN PROFESSIONAL. INCLUDE LIST OF CODES, LOADS, AND OTHER SYSTEM. D. WARRANTIES
NOT BE RECOGNIZED FOR EXTRA LABOR, EQUIPMENT, OR MATERIALS REQUIRED ELECTRICAL EQUIPMENT. INDICATE STRUCTURAL PENETRATIONS AND OPENINGS AS FACTORS USED IN PERFORMING THESE SERVICES. 3. EQUIPMENT AND APPURTENANCES SHALL OPERATE PROPERLY WITHOUT 1. EXECUTE AND ASSEMBLE TRANSFERABLE WARRANTY DOCUMENTS FROM
BECAUSE OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN REQUIRED. OBJECTIONABLE NOISE, VIBRATION OR MOVEMENT AS DETERMINED BY THE SUBCONTRACTORS, SUPPLIERS, AND MANUFACTURERS.
HAD SUCH AN EXAMINATION BEEN MADE. 4. SUBMIT COORDINATION DRAWINGS TO THE ENGINEER FOR RECORD ONLY. THE SECTION 014000 - QUALITY REQUIREMENTS ENGINEER. CORRECTIONS TO THE INSTALLATION SHALL BE MADE BY THE 2. PROVIDE TABLE OF CONTENTS AND ASSEMBLE IN THREE RING BINDER WITH DURABLE
ENGINEER WILL NOT REVIEW COORDINATION DRAWINGS. THE DETAILS OF THE CONTRACTOR, AS REQUIRED BY THE ENGINEER, WITHOUT ADDITIONAL COST OR TIME PLASTIC COVER.
G. GUARANTEE: COORDINATION ARE THE CONTRACTOR'S RESPONSIBILITY. RECEIPT OF DRAWINGS A. SUMMARY EXTENSION. 3. INCLUDE COPIES IN OPERATION AND MAINTENANCE DOCUMENTATION.
1. ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE DOES NOT CONSTITUTE APPROVAL OF DRAWING, EXTRA SERVICE OR FUTURE 1. TESTING AND INSPECTING SERVICES MAY BE REQUIRED TO VERIFY COMPLIANCE WITH 4. DAMAGED OR DEFECTIVE EQUIPMENT SHALL BE REPLACED BY THE CONTRACTOR 4. SUBMIT WARRANTIES FOR DESIGNATED PORTIONS OF THE WORK ON SUBSTANTIAL
YEAR FROM DATE OF FINAL ACCEPTANCE OF THIS WORK. FINAL ACCEPTANCE SHALL CHANGE ORDER REQUEST. CONTRACT OR LOCAL CODE REQUIREMENTS. THESE SERVICES DO NOT RELIEVE WITHOUT ADDITIONAL COST OR EXTENSION OF TIME. COMPLETION. ORGANIZE WARRANTY DOCUMENTS INTO AN ORDERLY SEQUENCE
BASED ON THE TABLE OF CONTENTS OF THE PROJECT MANUAL. BIND WARRANTIES 3. IDENTIFY PENETRATION FIRESTOPPING WITH PREPRINTED METAL OR PLASTIC LABELS. 2. FITTINGS: WROUGHT COPPER, SOLDER JOINT, ANSI B.16.22 OR CAST BRONZE, TEFLON TAPERED PLUG, THREADED OR FLANGED ENDS BY SIZE, LOCKABLE TAB.

W O R K S H O P
AND BONDS IN HEAVY-DUTY, 3-RING, VINYL-COVERED, LOOSE-LEAF BINDERS, ATTACH LABELS PERMANENTLY TO SURFACES ADJACENT TO AND WITHIN 6 INCHES SOLDER JOINT, ANSI B.16.18. ACCEPTABLE VALVES:

39 WEST 29TH STREET, SUITE 304,


THICKNESS AS NECESSARY TO ACCOMMODATE CONTENTS, AND SIZED TO RECEIVE OF FIRESTOPPING EDGE SO LABELS WILL BE VISIBLE TO ANYONE SEEKING TO 3. JOINTS: SOLDER, 95-5 TIN-ANTIMONY, ASTM B32, GRADE 95TA FOR PRESSURE PIPING. a. 3/4 INCH TO 3 INCH SIZE: HOMESTEAD 611 & 612, ROCKWELL 142 & 143, AND

THIS DRAWING IS ONLY VALID FOR CONSTRUCTION, BIDDING OR GOVERNMENT AGENCY REVIEW IF SAID DRAWING BEARS AN ORIGINAL STAMPING OF THE SEAL OF THE ARCHITECT WHOSE SIGNATURE APPEARS HEREON. THIS DRAWING IS THE PRODUCT OF SERVICE AND IS THE PROPERTY OF ICD - WORKSHOP LLC. IT IS TO BE USED ONLY FOR THE PROJECT NOTED HEREIN. REUSE OF THIS DRAWING FOR ANY PART THEREOF FOR ANY OTHER PROJECT OR ALTERATION OR EXTENSION OF
8-1/2-BY-11-INCH PAPER. PROVIDE HEAVY PAPER DIVIDERS WITH PLASTIC-COVERED REMOVE PENETRATING ITEMS OR FIRESTOPPING. INCLUDE THE FOLLOWING 4. SHUT-OFF VALVES: FULL-PORT BALL OR GATE TYPE, BRONZE, NON-RISING STEM, 125 WALWORTH 1796 & 1797F.
TABS FOR EACH SEPARATE WARRANTY. MARK TAB TO IDENTIFY THE PRODUCT OR INFORMATION ON LABELS: PSI WSP: b. 4 INCH SIZE: HOMESTEAD 611 & 612, ROCKWELL 142 & 143, AND WALWORTH 1796 &
INSTALLATION. PROVIDE A TYPED DESCRIPTION OF THE PRODUCT OR INSTALLATION, a) THE WORDS "WARNING - PENETRATION FIRESTOPPING - DO NOT DISTURB. NOTIFY FOR THREADED ENDS, SIMILAR TO NIBCO NO. T-124; 1797F.
INCLUDING THE NAME OF THE PRODUCT AND THE NAME, ADDRESS, AND TELEPHONE BUILDING MANAGEMENT OF ANY DAMAGE." FOR SOLDER JOINT ENDS, SIMILAR TO NIBCO NO. S-111. c. GAS COCKS: TYPE AB: 100 PSIG WOG, GAS COCK TYPE WITH CAST IRON OR
NUMBER OF INSTALLER. b) CONTRACTOR'S NAME, ADDRESS, AND PHONE NUMBER. 5. CHECK VALVES: SWING TYPE, BRONZE, 125 PSI: BRONZE BODY, BRONZE PLUG, SQUARE HEAD, WRENCH OPERATOR, AND
5. PROVIDE NOTARIZED COPIES. c) DESIGNATION OF APPLICABLE TESTING AND INSPECTING AGENCY. FOR THREADED ENDS, SIMILAR TO NIBCO NO. T-413; THREADED ENDS. ACCEPTABLE MANUFACTURERS: CRANE, ECLIPSE COMBUSTION,
d) DATE OF INSTALLATION. FOR SOLDER JOINT, SIMILAR TO NIBCO NO. S-413. AND MCDONALD.

NEW YORK, NY 10001


E. FINAL CLEANING e) MANUFACTURER'S NAME. 6. BALANCING VALVES: CALIBRATED, PRESSURE BALANCED, GLOBE TYPE, TEST PORTS,
1. CONDUCT CLEANING AND WASTE-REMOVAL OPERATIONS TO COMPLY WITH LOCAL f) INSTALLER'S NAME. LOCKABLE HANDLE, BELL & GOSSETT, CIRCUIT SETTER MODEL CB. C. EXECUTION:
LAWS AND ORDINANCES AND FEDERAL AND LOCAL ENVIRONMENTAL AND 1. INSTALL PIPING STRAIGHT, LEVEL WITHOUT SAGS OR KINKS.
ANTIPOLLUTION REGULATIONS. COMPLETE THE FOLLOWING CLEANING OPERATIONS F. FIELD QUALITY CONTROL C. EXECUTION: 2. PROVIDE DRIP LEG AT BASE OF RISER AND AT EQUIPMENT FEED.
BEFORE REQUESTING INSPECTION FOR CERTIFICATION OF SUBSTANTIAL 1. OWNER WILL ENGAGE A QUALIFIED TESTING AGENCY TO PERFORM TESTS AND 1. INSTALL PIPING STRAIGHT, LEVEL WITHOUT SAGS OR KINKS, EXCEPT EXPANSION 3. PROVIDE SHUT-OFF VALVES: AT EQUIPMENT FEED; AT BRANCHES FROM MAIN LINES
COMPLETION: INSPECTIONS. WHERE DEFICIENCIES ARE FOUND OR PENETRATION FIRESTOPPING IS LOOPS IN HW AND HWR EACH 75FT. OR RISERS; AND WHERE INDICATED. ARRANGE VALVES NEATLY; IN ACCESSIBLE
a) REMOVE TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY, SURPLUS MATERIAL, DAMAGED OR REMOVED BECAUSE OF TESTING, REPAIR OR REPLACE PENETRATION 2. PROVIDE TEMPERATURE MAINTENANCE CIRCULATION OR CABLE TO NOT MORE THAN LOCATION. PROVIDE VALVE ID TAGS.

- D -
REFUSE, AND DEMOLITION DEBRIS FROM PROJECT SITE. FIRESTOPPING TO COMPLY WITH REQUIREMENTS. PROCEED WITH ENCLOSING 5-FEET FROM THE FIXTURE, EXCEPT FIXTURES WITH POINT OF USE HEATERS. 4. PROVIDE PRESSURE REGULATING VALVES FOR PRESSURE GREATER THAN
b) REMOVE DEBRIS AND SURFACE DUST FROM LIMITED ACCESS SPACES, INCLUDING PENETRATION FIRESTOPPING WITH OTHER CONSTRUCTION ONLY AFTER INSPECTION 3. PROVIDE SHUT-OFF VALVES: AT DROPS TO FIXTURE BATTERY, EQUIPMENT FEED, OR EQUIPMENT OPERATING PRESSURE. VENT ALL REGULATORS TO THE EXTERIOR OF
ROOFS, PLENUMS, SHAFTS, PIPE CHASES, TRENCHES, EQUIPMENT VAULTS, REPORTS ARE ISSUED AND INSTALLATIONS COMPLY WITH REQUIREMENTS. SILLCOCK; AT BRANCHES FROM MAIN LINES OR RISERS; WERE INDICATED. ARRANGE THE BUILDING. PROVIDE VENT CAPS AS REQUIRED BY CODE.
MANHOLES, ATTICS, AND SIMILAR SPACES. VALVES NEATLY; IN ACCESSIBLE LOCATION. PROVIDE VALVE ID TAGS. 5. PROVIDE PRESSURE GAUGES DOWNSTREAM OF THE METER, AT EQUIPMENT, AND
c) TOUCH UP AND OTHERWISE REPAIR AND RESTORE MARRED, EXPOSED FINISHES SECTION 220000 - COMMON WORK REQUIREMENTS 4. PROVIDE DIELECTRIC ISOLATORS, INSULATION, AND WATER HAMMER ARRESTORS AS BEFORE AND AFTER THE PRV.

I C
AND SURFACES. REPLACE FINISHES AND SURFACES THAT CANNOT BE SPECIFIED.
SATISFACTORILY REPAIRED OR RESTORED OR THAT ALREADY SHOW EVIDENCE OF A. ESCUTCHEONS: FOR PIPING PASSING FLOORS, CEILINGS, WALL OR PARTITIONS: 5. PROVIDE PRESSURE REGULATING VALVES FOR PRESSURE GREATER THAN 80 PSI. SET D. TEST GAS PIPING WITH AIR AS REQUIRED BY LOCAL CODE, BUT NOT LESS THAN AT TWICE
REPAIR OR RESTORATION. REMOVE LABELS THAT ARE NOT PERMANENT. PROVIDE CHROME PLATED CAST BRASS OR CAST IRON ESCUTCHEONS. TO 50 PSI. OPERATING PRESSURE, AND 5 PSI FOR TWO (2) HOURS WITHOUT PRESSURE DROP.
(1) DO NOT PAINT OVER "UL" AND OTHER REQUIRED LABELS AND 6. PROVIDE VACUUM BREAKER, OR BACKFLOW PREVENTION DEVICE AT FIXTURES AND ABS ENGINEERING, PLLC
IDENTIFICATION, INCLUDING MECHANICAL AND ELECTRICAL NAMEPLATES. B. SLEEVES: FOR PIPING PASSING FLOORS, CEILINGS, WALL OR PARTITIONS: PROVIDE NO. EQUIPMENT FEEDS AS REQUIRED BY LOCAL CODE. SECTION 224200 - PLUMBING FIXTURES 39 WEST 29TH STREET, SUITE 304
NEW YORK, NY 10001
d) REMOVE EXCESS LUBRICATION, PAINT AND MORTAR DROPPINGS, AND OTHER 22 USSG GALVANIZED IRON SLEEVES EXTENDED THROUGH CONSTRUCTION. 7. DO NOT INSTALL VALVES WITH STEMS INVERTED (FACING DOWN). PHONE: 212.317.2361
FOREIGN SUBSTANCES FROM EQUIPMENT. REPLACE PARTS SUBJECT TO 1. FOR INSULATED PIPING, SIZE TO ALLOW INSULATION TO PASS THROUGH SLEEVE. A. GENERAL: ALL FIXTURES SHALL COMPLY WITH ACCESSIBILITY, AIR GAP, TRAP, AND EMAIL: info@absengineer.com
WEB: www.absengineer.com
OPERATING CONDITIONS DURING CONSTRUCTION THAT MAY IMPEDE OPERATION 2. PENETRATIONS IN FIRE RATED CONSTRUCTION SHALL BE COMPLETELY FIRE STOPPED D. TEST WATER PIPING WITH WATER (NOT AIR) AS REQUIRED BY LOCAL CODE, BUT NOT WATER FLOW RESTRICTIONS OF THE LOCAL PLUMBING AND HEALTH CODES.
DICATED. INSTALL PRODUCTS AT THE OR REDUCE LONGEVITY. CLEAN PLUMBING FIXTURES TO A SANITARY CONDITION, IN ACCORDANCE WITH SECTION 078413. LESS THAN AT TWICE OPERATING PRESSURE FOR TWO (2) HOURS WITHOUT PRESSURE
FREE OF STAINS, INCLUDING STAINS RESULTING FROM WATER EXPOSURE. LEAVE DROP. B. MATERIALS:
PROJECT CLEAN AND READY FOR OCCUPANCY. SECTION 220508 - TESTING, ADJUSTING, AND BALANCING 1. FIXTURES AND TRIM: SEE ARCHITECTURAL SPECIFICATIONS AND SCHEDULES ON
2. USE CLEANING MATERIALS AND AGENTS RECOMMENDED BY MANUFACTURER OR E. DISINFECT POTABLE WATER DISTRIBUTION SYSTEM AS REQUIRED BY LOCAL CODE, PLANS.
FABRICATOR OF THE SURFACE TO BE CLEANED. DO NOT USE CLEANING AGENTS A. DEFECTS DISCLOSED BY THE TESTS SHALL BE REPAIRED OR REPLACED. TESTS SHALL BE AWWA C651, OR C652, BUT NOT LESS THAN: FLUSH WITH POTABLE WATER; DOSE 200 2. SEE DOMESTIC WATER SPECIALTIES FOR VACUUM BREAKERS, BACKFLOW
THAT ARE POTENTIALLY HAZARDOUS TO HEALTH OR PROPERTY OR THAT MIGHT REPEATED AS DIRECTED UNTIL ALL WORK IS PROVEN SATISFACTORY. mG/L CHLORINE FOR 3-HOURS; RE-FLUSH WITH POTABLE WATER. PREVENTERS, WATER HAMMER ARRESTORS.
DAMAGE FINISHED SURFACES. USE CLEANING PRODUCTS THAT MEET GREEN SEAL B. TAKE ALL PRECAUTIONS NECESSARY TO PREVENT DAMAGE TO THE BUILDING AND ITS 3. WATER FILTER: UNDER SINK WATER FILTER, CUNO EVERPURE WATER FILTER SYSTEM
GS-37, OR IF GS-37 IS NOT APPLICABLE, USE PRODUCTS THAT COMPLY WITH THE CONTENTS AS A RESULT OF SUCH TESTS. REPAIR ANY DAMAGE CAUSED. SECTION 221119 - DOMESTIC WATER SPECIALTIES: MODEL CFS6112-5.
CALIFORNIA CODE OF REGULATIONS MAXIMUM ALLOWABLE VOC LEVELS. C. HOT WATER CIRCULATION: CONTRACTOR SHALL BALANCE THE DOMESTIC HOT WATER 4. STOP VALVES: CHROME PLATED; HEAVY DUTY BRASS BODY, STEM AND COMPRESSION
RETURN SYSTEM AT EACH HOT WATER CIRCULATION BALANCING VALVE RIG. THE A. DIELECTRIC FITTINGS: CONNECTIONS BETWEEN FERROUS AND NON FERROUS PIPE OR NUT; REPLACEABLE CHLORINE RESISTANT WASHER; CONVERTIBLE HANDLE; BRAIDED
SECTION 018113 - SUSTAINABLE DESIGN REQUIREMENTS CONTRACTOR SHALL PROVIDE WRITTEN BALANCING REPORT TO OWNER DOCUMENTING EQUIPMENT CONNECTIONS SHALL BE MADE USING ISOLATING UNION AS OR FLANGE STAINLESS STEEL RISER; MCGUIRE OR EQUAL.
RESULTS OF BALANCING AND GPM FLOW AT EACH RIG. ALL PLUMBING FIXTURES SHALL JOINTS MANUFACTURING BY ESPSO SALES INC. OR APPROVED EQUAL. 5. TRAP WRAP: FOR ADA ENCAPSULATION. PAINTABLE WHITE MOLDED VINYL, UV
A. INSULATION BE CLOSED DURING BALANCING. THE SYSTEM SHALL REACH STEADY STATE CONDITION PROTECTED AGAINST FADE / DISCOLORATION, INTERNAL FASTENERS, SELF
1. ALL FIBERGLASS INSULATION PRODUCTS SHALL BE MANUFACTURED FROM PRIOR TO RECORDING RESULTS. B. TRAP PRIMER VALVE: EXTINGUISHING (ASTMD-635), FUNGAL RESISTANT (ASTM G21&22), TRUEBRO LAV
RECYCLED GLASS WITH A MINIMUM OF 30% POST CONSUMER RECYCLED CONTENT 1. ASSE # 1018, WATTS REGULATOR CO. MODEL A200S, OR ZURN Z1022 SANI-GUARD GUARD OR BASIN GUARD KIT.
BY WEIGHT. CONTRACTOR SHALL SUBMIT MANUFACTURER'S CERTIFICATION OF SECTION 220543 - HANGERS, SUPPORTS, ANCHORS, AND GUIDES AUTOMATIC TRAP PRIMER, ALL BRONZE BODY WITH INTEGRAL VACUUM BREAKER,
RECYCLED CONTENT FOR APPROVAL. NON-LIMING INTERNAL OPERATING ASSEMBLY WITH GASKETED BRONZE COVER. C. EXECUTION:
2. ALL FIBERGLASS INSULATION PRODUCTS USED FOR PIPING OR EQUIPMENT A. GENERAL: 1. INSTALL ALL FIXTURES IN ACCORDANCE WITH THE MANUFACTURERS
INSULATION SHALL BE FORMALDEHYDE FREE. 1. EQUIPMENT AND PIPING: SECURE TO BUILDING STRUCTURE IN ACCORDANCE WITH C. VACUUM BREAKER: RECOMMENDATIONS.
ALL LOCAL CODE REQUIREMENTS AND ALL APPLICABLE LOADS, SUCH AS DEAD 1. FOR COFFEE MAKER: CHROME FINISH BRONZE BODY AND INTERNAL TRIM WITH 2. PROVIDE FIXTURE SUPPORTS AND CARRIERS AS REQUIRED FOR THE FIXTURES
B. ADHESIVES WEIGHT, DYNAMIC AND/OR THRUST LOADS. SILICONE SEAT DISC. NON-TOXIC AND NON-CORROSIVE, WITH QUARTER-TURN, FULL SPECIFIED. COORDINATE SPACE REQUIREMENTS WITH ALL TRADES.
1. ALL ADHESIVES USED ON THIS PROJECT MUST NOT EXCEED THE VOC CONTENT 2. FOR HAZARDOUS OR LIFE SAFETY RELATED SYSTEMS: BRACE FOR SEISMIC, WIND, PORT, RESILIENT SEATED BRONZE BALL VALVE SHUT-OFFS, SIZE 1/2 IN. WATTS 3. AIR GAPS: FAUCETS, SPIGOTS INSTALLED WITH 2XDIA. AIR GAP PER LOCAL CODE.
LIMITS OF: AND/OR FLOOD LOADS IN ACCORDANCE WITH LOCAL CODE REQUIREMENTS. NO.800MC-QT. 4. BACKFLOW PREVENTERS: INSTALL, TEST, AND PERMIT IN ACCORDANCE WITH LOCAL

THIS PROJECT IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF ICD - WORKSHOP LLC. ANY UNAUTHORIZED REUSE IS A VIOLATION OF US. COPYRIGHT LAW. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
ORE ENCLOSING THE SPACE. CLEAN a. ADHESIVES, SEALANTS AND SEALANT PRIMERS: SOUTH COAST AIR QUALITY 3. PROVIDE BRACING TO PREVENT SWAY FOR ALL PIPING LOWER THAN 18" BELOW SLAB 2. FOR REFRIGERATOR WITH ICE MAKER: DUAL CHECK BACKFLOW PREVENTER WITH CODE REQUIREMENTS. SEE DOMESTIC WATER SPECIALTIES.
MANAGEMENT DISTRICT RULE # 1168 REQUIREMENTS IN EFFECT ON JANUARY 1, OR STRUCTURAL ATTACHMENT, OR WHERE PIPING IS SUBJECT TO THRUST LOADING ATMOSPHERIC VENT FOR INLINE INSTALLATION WATTS MODEL N9C.
2003 AND RULE AMENDMENT DATED OCTOBER 3, 2003. (BASE OF STACK, PUMP DISCHARGE, ETC.).
b. AEROSOL ADHESIVES: GREEN STANDARD GC-36 REQUIREMENTS IN EFFECT ON D. WATER HAMMER ARRESTER: PDI CERTIFIED, CONFORMING TO ASSE 1010-2004, ANSI
OCTOBER 19, 2000. B. MATERIAL: A112-26-1. PROVIDE AT QUICK CLOSING VALVES AND FIXTURES IN ACCORDANCE WITH PDI
2. ALL ADHESIVES USED ON THIS PROJECT SHALL BE OF THE TYPE HAVING LIMITED 1. PIPING, HORIZONTAL: "CLEVIS" HANGER, COOPER B-LINE B3100 (B3104CTC FOR STANDARD WH-201. SIOUX CHIEF "HYDRARESTER" OR AMTROL MINI-TROL MODEL NO. 500.
CAPABILITY TO EMIT VOLATILE ORGANIC COMPOUNDS. EACH ADHESIVE SHALL MEET COPPER PIPE) OR TRAPEZE FOR MULTIPLE LINES, COOPER B-LINE ASSEMBLY 86 (B22H PROVIDE SIZE "B" OR LARGER.
THE FOLLOWING EMISSION FACTOR LIMITS: STRUT, B2400 STRAPS).
a. TOTAL VOC'S 10.0/mg/m3/hr. 2. PIPING, VERTICAL: RISER CLAMP; ABOVE AND BELOW SLAB; STEEL, CONFORM TO CFR SECTION 221316 - SANITARY, STORM DRAINAGE, AND VENT:
b. FORMALDEHYDE 0.05mg/m3/hr. WW-H171 TYPE 8, COOPER B-LINE B3373 (B3373CTC FOR COPPER PIPE).
c. 2-ETHYL-1-HEXANOL 3.0 mg/m3/hr. 3. PIPING, INSULATED: PROVIDE METAL PROTECTION SHIELDS ON HANGER. HANGERS A. GENERAL:
3. THE CONTRACTOR SHALL SUBMIT A CUT SHEET AND MSDS SHEET FOR EACH TO BE INSTALLED OVER INSULATION AND SHIELDS. 1. TO ALL FIXTURES, EQUIPMENT, AND ROUGHING AS INDICATED OR REQUIRED FOR THE
ADHESIVE TO BE USED IN THIS WORK, HIGHLIGHTING VOC LIMITS. 4. BEAM CLAMPS: MALLEABLE IRON, C-CLAMP, LOCK NUT; COOPER B-LINE 3036L WITH WORK INDICATED IN THE PROJECT AREA.
B3363 RESTRAINING STRAP.
C. SEALANTS 5. CHASES: SUPPORT PIPING INSIDE CHASES WITH METAL STRAPS ATTACHED TO STUDS, B. MATERIALS:
1. ALL SEALANTS USED ON THIS PROJECT MUST NOT EXCEED THE VOC CONTENT LIMITS UNIVERSAL BRACKETS AND CLIPS, SIMILAR TO B-LINE RUFFIN. 1. VENT, GRAVITY DRAIN ABOVE GRADE: CAST IRON, HUBLESS, SOIL PIPE, FITTINGS, CISPI
OF: 6. SUPPORT MATERIALS: TO MATCH PIPING MATERIALS. PROVIDE COPPER PLATED CLIPS 301, SERVICE WEIGHT. JOINTS: ASTM C1540, HEAVY DUTY COUPLINGS, 24 GAUGE, 304
a. ADHESIVES, SEALANTS AND SEALANT PRIMERS: SOUTH COAST AIR QUALITY FOR COPPER PIPING. STAINLESS STEEL WITH NEOPRENE GASKETS, RATED FOR 15 PSI AND REQUIRING A
MANAGEMENT DISTRICT RULE # 1168 REQUIREMENTS IN EFFECT ON JANUARY 1, 7. SEISMIC, SWAY BRACING: BRAIDED STAINLESS STEEL WIRE; OR PIPE BRACE, TOLCO MINIMUM OF 100 INCH/LBS OF TORQUE, HUSKY OR EQUAL.
2003 AND RULE AMENDMENT DATED OCTOBER 3, 2003. OR EQUAL. 2. VENT, GRAVITY DRAIN BELOW GRADE: CAST IRON, HUB AND SPIGOT, SOIL PIPE,
b. AEROSOL ADHESIVES: GREEN STANDARD GC-36 REQUIREMENTS IN EFFECT ON FITTINGS, ASTM A74, SERVICE WEIGHT. JOINTS: COMPRESSION GASKET, NEOPRENE,
OCTOBER 19, 2000. C. EXECUTION: ASTM C564.
2. ALL SEALANTS USED IN MECHANICAL SYSTEMS SHALL BE OF THE LOW VOLATILE 1. THE CONTRACTOR SHALL PROVIDE SUPPORTS AND SEISMIC RESTRAINING SYSTEMS 3. GRAVITY DRAIN AT BASE OF STACK / SURCHARGE AREA: CAST IRON, HUBLESS SOIL
ORGANIC COMPOUND EMITTING TYPE. ALL SEALANTS SHALL HAVE EMISSION FOR EQUIPMENT AND PIPING INSTALLED AS PART OF THIS CONTRACT AS REQUIRED PIPE, FITTINGS, CISPI 301, SERVICE WEIGHT. JOINTS: MECHANICAL COUPLING,
CHARACTERISTICS THAT DO NOT EXCEED A VOC LIMIT OF 250 G/L. THE CONTRACTOR BY LOCAL CODE AND THE BUILDING STANDARDS. SEISMIC RESTRAINING SYSTEMS RESTRAINED, NEOPRENE GASKET.
SHALL PROVIDE A CUT SHEET AND MSDS SHEET FOR EACH SEALANT TO BE USED IN SHALL COMPLY WITH THE REQUIREMENTS OF THE LOCAL BUILDING CODE AND ALL 4. ALL CAST IRON SOIL PIPE AND FITTING SHALL BE MARKED WITH THE COLLECTIVE
THIS PART OF THE WORK HIGHLIGHTING VOC LIMITS. SECTIONS OF THE SPECIFICATION. TRADEMARK OF THE CAST IRON SOIL PIPE INSTITUTE (CISPI) AND BE LISTED BY NSF
2. INSTALL ALL HANGERS, SUPPORTS IN ACCORDANCE WITH THE BUILDING STANDARDS. INTERNATIONAL.
D. PAINTS INSTALLATION OF NEW HANGERS SHALL BE DRILLED, NOT CHOPPED. EXPANSION 5. PUMP DISCHARGE: GALVANIZED STEEL, ASTM A53; JOINTS: THREADED.
1. ALL PAINTS USED FOR EQUIPMENT AND SYSTEMS TO BE INSTALLED ON THIS PROJECT ANCHORS SHALL NOT BE USED.
SHALL COMPLY WITH GREEN SEAL PRODUCT REQUIREMENTS. THE VOC EMISSION 3. IN TERRA COTTA SLAB, REUSE APPROVED EXISTING HANGERS WHERE POSSIBLE. C. EXECUTION:
ORE MARRED EXPOSED FINISHES TO CHARACTERISTIC FOR EACH PAINT MUST COMPLY WITH VOC LIMIT OF 150 G/L FOR WHERE ADDITIONAL HANGERS ARE REQUIRED. BUILDING APPROVED TOGGLE BOLTS 1. CAREFULLY NOTE MANUFACTURER'S RECOMMENDATIONS REGARDING ADDITIONAL
NON-FLAT PAINTS AND 50 G/L FOR FLAT PAINTS. WITH FLAT WINGS (AS MANUFACTURED BY POWER FASTENERS) SHALL BE INSTALLED. SUPPORTS REQUIRED FOR NO HUB PIPING INSTALLATIONS, AND INSTALL PIPING IN
4. HOT WATER HEATER DUAL ADDITIONAL SUPPORT STEEL SHALL BE WELDED TO THE ACCORDANCE WITH THOSE STANDARDS.
E. METALLIC PIPING (COPPER, STEEL, & CAST IRON) STEEL STRUCTURE IN ACCORDANCE WITH THE BLDG. STANDARDS. 2. ALL HUBLESS PIPES SHALL BE SUPPORTED AT EACH SIDE OF JOINT; MAX. SPACING
1. ALL METALLIC PIPING SHALL BE FABRICATED FROM MATERIALS MANUFACTURED WITH 5. PROVIDE CONCRETE INERTIA BASE FOR PUMPS 5 HP AND LARGER AND NEOPRENE FIVE (5) FOOT INTERVALS.
A MINIMUM RECYCLED CONTENT OF 20% POST-CONSUMER RECYCLED CONTENT ISOLATORS FOR SMALLER PUMPS. 3. RESTRAIN DRAINAGE PIPING AT THE BASE OF STACK; OR LOWER THAN 18" BELOW
UST BE COMPLETED OR CORRECTED MATERIAL BY WEIGHT OF 40% POST-INDUSTRIAL RECYCLED CONTENT MATERIAL. 6. SUPPORT PIPING AT DISTANCES AS REQUIRED BY CODE.
CONTRACTOR SHALL SUBMIT CERTIFICATION OF RECYCLED CONTENT FOR RECORD. 7. SEISMICALLY RESTRAIN THE FOLLOWING PIPING: 4. SUDS PRESSURE ZONE: DO NOT CONNECT TO SANITARY STACK WITHIN 40
a. GAS PIPING AND COMPRESSED AIR PIPING THAT IS 1" OR LARGER DIAMETERS UPSTREAM, OR 10 DIAMETERS DOWNSTREAM OF BASE OF STACK OR
SECTION 078413 - PENETRATION FIRESTOPPING b. ALL PIPING LOCATED IN MECHANICAL ROOMS THAT IS 1-1/4" AND LARGER DIRECTIONAL CHANGE WHICH RESULTS IN A SUDS PRESSURE ZONE.
c. ALL OTHER PIPING 2-1/2" AND LARGER.
A. PROVIDE UL-LISTED FIRE STOPPING ASSEMBLIES FOR PENETRATIONS IN ALL FIRE OR 8. TRANSVERSE PIPING RESTRAINTS SHALL BE AT 40 FT MAXIMUM SPACING FOR ALL PIPE D. TEST DRAINAGE AND VENT PIPING AS REQUIRED BY LOCAL CODE, BUT NOT LESS THAN 10
SMOKE RESISTANCE RATED WALLS, FLOORS, ROOFS, AND OTHER ASSEMBLIES. SIZES. BRANCH PIPING SHALL BE END TIED. FT WATER/ 15 MINUTE/ NO LEAK FOR DRAIN, VENT, AND PUMP DISCHARGE AT 5PSI MORE
9. LONGITUDINAL RESTRAINTS SHALL BE AT 80 FT MAXIMUM SPACING FOR ALL PIPE THAN PUMP PRESSURE/ 15 MINUTE/ NO LEAKAGE.
B. USE FIRE STOPPING MATERIALS AND ASSEMBLIES THAT ARE UL LISTED AND HAVE A SIZES.
RATING EQUAL TO THE BARRIER OR ASSEMBLY WHICH IS PENETRATED. 10. GAS PIPING TRANSVERSE RESTRAINTS SHALL BE AT 20 FT MAXIMUM SPACING, SECTION 221319 - SANITARY, STORM DRAINAGE SPECIALTIES
LONGITUDINAL RESTRAINTS SHALL BE AT 40 FT MAXIMUM SPACING.
C. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE A. CLEANOUTS
PRODUCTS BY ONE OF THE FOLLOWING: SECTION 220719 - INSULATION 1. PROVIDE AT EACH PIPE SECTION, NOT MORE THAN 100-FEET APART; AT EACH 90
a) HILTI, INC. DEGREE CHANGE OF DIRECTION; BASE OF STACKS: CAST BRONZE CLEANOUTS IN
b) RECTORSEAL CORPORATION. A. GENERAL: ACCORDANCE WITH ANSI A112.36.2 FULL SIZE UP TO 4 INCH.
c) 3M FIRE PROTECTION PRODUCTS. 1. INSULATE ALL PIPE, VALVES, AND EQUIPMENT IN ACCORDANCE WITH THE 2. IN OR BEHIND WALLS AND PARTITIONS, PROVIDE CAST BRONZE PLUGS WITH SATIN
REQUIREMENTS OF THE LOCAL ENERGY CODE. FINISH CHROME PLATED BRASS WALL PLATE J.R. SMITH NO. 4532 (HUB AND SPIGOT),
D. PENETRATION FIRESTOPPING: RESIST PASSAGE OF SMOKE AND OTHER GASES, AND OR NO. 4472 (NO-HUB),
MAINTAIN ORIGINAL FIRE-RESISTANCE RATING OF CONSTRUCTION PENETRATED. B. MATERIAL: 3. FOR PIPING BURIED UNDER FLOOR: EXTEND PIPING AND TERMINATE WITH SQUARE
H LIST. THE CERTIFIED COPY OF THE 1. PENETRATIONS IN FIRE-RESISTANCE-RATED WALLS: RATINGS DETERMINED PER ASTM 1. FIRE RATING: FLAME SPREAD: 25 OR LESS, SMOKE DEVELOPED: 50 OR LESS. NICKEL BRONZE TOP WITH TERRAZZO IR TILE RECESS, SIMILAR TO J.R. SMITH NO.
MPLETED OR OTHERWISE RESOLVED E 814 OR UL 1479, BASED ON TESTING AT A POSITIVE PRESSURE DIFFERENTIAL OF 2. PIPING: FIBERGLASS, SECTIONAL PIPE COVERING. THICKNESS AS FOLLOWS: 4203.
0.01-INCH WC. F-RATING: NOT LESS THAN THE FIRE-RESISTANCE RATING OF a. DOMESTIC HOT WATER; RECIRCULATION: 1" THICK, VAPOR BARRIER
ADJUSTMENT, AND MAINTENANCE OF CONSTRUCTIONS PENETRATED. b. DOMESTIC COLD WATER: 1" THICK, VAPOR BARRIER B. FLOOR DRAIN
2. PENETRATIONS IN HORIZONTAL ASSEMBLIES: RATINGS DETERMINED PER ASTM E 814 c. STORM DRAINAGE (DRAIN BODY; HORIZONTAL PIPE): 1" THICK, VAPOR BARRIER 1. DUCO CAST IRON BODY AND FLASHING COLLAR WITH NICKEL BRONZE ADJUSTABLE
OR UL 1479, BASED ON TESTING AT A POSITIVE PRESSURE DIFFERENTIAL OF 0.01-INCH 3. VALVES AND FITTINGS: PREMOLDED FIBERGLASS FITTINGS OR RADIAL MITERED STRAINER, 6" ROUND TOP, JAY R. SMITH NO. 2005-A.
WC. F-RATING: AT LEAST 1 HOUR, BUT NOT LESS THAN THE FIRE-RESISTANCE RATING SEGMENTS OF PIPE INSULATION, INSULATING CEMENT, FIBERGLASS REINFORCING
OF CONSTRUCTIONS PENETRATED. T-RATING: AT LEAST 1 HOUR, BUT NOT LESS CLOTH, AND MASTIC. VAPOR SEAL INSULATION ON CW PIPING. MANVILLE ZESTON C. FUNNEL DRAIN
THAN THE FIRE-RESISTANCE RATING OF CONSTRUCTIONS PENETRATED EXCEPT FOR 2000, PVC FITTING COVERS WITH FIBER GLASS INSULATION INSERT. 1. ABOVE FLOOR RECEPTOR: COMBINATION FUNNEL AND TRAP DRAIN, 3" PIPE SIZE &
FLOOR PENETRATIONS WITHIN THE CAVITY OF A WALL. 4. VAPOR BARRIER (SWEATPROOFING): AS SPECIFIED FOR CW PIPING; NO STAPLES
3. PENETRATIONS IN SMOKE BARRIERS: PROVIDE PENETRATION FIRESTOPPING WITH PERMITTED. CLEANOUT PLUG. SIMILAR TO ZURN Z1019, OR J.R. SMITH NO. 3812,
RATINGS DETERMINED PER UL 1479. L-RATING: NOT EXCEEDING 5.0 CFM/SQ. FT. OF 2. FLOOR DRAIN RECEPTOR: DUCO CAST IRON BODY AND FLASHING COLLAR WITH
PENETRATION OPENING AT 0.30-INCH WC AT BOTH AMBIENT AND ELEVATED C. EXECUTION:
TEMPERATURES. 1. AT ALL HANGERS: PROVIDE SECTION OF NON COMPRESSIBLE INSULATION FULL 3510.
4. ACCESSORIES: PROVIDE COMPONENTS FOR EACH PENETRATION FIRESTOPPING LENGTH OF SHIELD.
WINGS SHOWING ALL WORK IN DETAIL SYSTEM THAT ARE NEEDED TO INSTALL FILL MATERIALS AND TO MAINTAIN RATINGS 2. FOR OUTDOOR INSTALLATION: PROVIDE METAL OR OTHER WEATHER-RESISTANT SECTION 221600 - FUEL GAS
REQUIRED. USE ONLY THOSE COMPONENTS SPECIFIED BY PENETRATION JACKETING.
FIRESTOPPING MANUFACTURER AND APPROVED BY QUALIFIED TESTING AND 3. TEMPERATURE MAINTENANCE ELECTRIC HEAT STRIP: PROVIDE INSULATION A. GENERAL:
INSPECTING AGENCY FOR FIRESTOPPING INDICATED. OVERSIZED 14" LARGER DIAMETER TO ACCOMMODATE HEAT STRIP. 1. TO ALL FIXTURES, EQUIPMENT, AND ROUGHING AS INDICATED OR REQUIRED FOR THE
WORK INDICATED IN THE PROJECT AREA.
E. INSTALLATION SECTION 221116 - DOMESTIC WATER DISTRIBUTION (COLD AND HOT WATER):
1. INSTALL PENETRATION FIRESTOPPING TO COMPLY WITH MANUFACTURER'S WRITTEN B. MATERIALS:
INSTALLATION INSTRUCTIONS AND PUBLISHED DRAWINGS FOR PRODUCTS AND A. GENERAL: 1. PIPE: BLACK STEEL, SCH 40, ASTM A53.
THREE RING BINDER WITH DURABLE APPLICATIONS INDICATED. 1. TO ALL FIXTURES, EQUIPMENT, AND ROUGHING AS INDICATED OR REQUIRED FOR THE 2. FITTINGS: STEEL OR WROUGHT IRON, ASTM A53;
2. INSTALL FILL MATERIALS FOR FIRESTOPPING BY PROVEN TECHNIQUES TO FILL VOIDS WORK INDICATED IN THE PROJECT AREA. 3. JOINTS: TAPERED THREAD: UP TO 3" AND PRESSURE LESS THAN 14"WC;
AND CAVITIES FORMED BY OPENINGS, FORMING MATERIALS, ACCESSORIES, AND WELDED: 4" AND LARGER, OR PRESSURE IN EXCESS OF 14"WC.
PENETRATING ITEMS AS REQUIRED TO ACHIEVE FIRE-RESISTANCE RATINGS B. MATERIALS: 4. VALVES: PLUG TYPE, 200 PSIG WOG, LUBRICATED, STANDARD PORT OPENING, CAST
INDICATED. 1. PIPE: COPPER, TYPE "L", HARD DRAWN, ASTM B88. IRON OR SEMI-STEEL BODY, SEALED LUBRICATION SYSTEM, CYLINDRICAL PLUG OR
CHROME PLATED BRASS PIPING WHEN EXPOSED AT FIXTURES.

You might also like