You are on page 1of 24
4 TRAVERSE ENERGY SERVICES LIMITED Integrity and excellence in every aspect QUALITY ASSURANCE AND CONTROL PLAN (00 | Quality Assurance and Control plan, LM AO Ae — | 27/05/2022 Rev. Description Prepared | Checked | Approved | Date 31 Alcon Road, Woli, Port Harcourt, Rivers Stat, Nigeria Page | 10 20 3.0 40 50 5.1 CONTROL PROCEDURES/WORK INSTRUCTIONS 5.2. MANAGEMENT SYSTEM IMPLEMENTATION... 60 70 80 20 TRAVERSE ENERGY SERVICES LIMITED Integrity and excellence in every aspect TABLE OF CONTENTS INTRODUCTION. DEFINITION: REFERENCE DOCUMENTS.. = TESL POLICY STATEMENT AND OBJECTIVES, ‘QUALITY SYSTEM DESCRIPTION. 5.2.1, CONTRACT REVIEW... 5.2.2. DOCUMENT /RECORD CONTROL. 5.2.3. MATERIAL CONTROL... 5.2.4. TESTING CONTROL. : 5.2.5. TOOLS AND INSTRUMENT CONTROL... 5.2.6, NONCONFORMANCE AND CORRECTIVE ACTION. 5.2.7. CONTROL OF SPECIAL PROCESSES... ‘5.2.8, QUALITY CONTROL DOCUMENTATION 5.2.9, WELDING PROCEDURES 5.2.10, WELDER QUALIFICATION. 5.2.11, WELDING CONSUMABLE CONTROL. 5.2.12, WELDING INSPECTION... ‘5.2.13. NON-DESTRUCTIVE TESTING. (CONTINUAL IMPROVEMENT eo QUALITY AUDITS AND INSPECTIONS . INSPECTION, QUALITY PROGRAMMES AND VERIFICATION... KEY PERFORMANANCE INDICATORS w {31 Alcon Road, Wo, Port Harcourt, Rivers State, Nigeria Poel? TRAVERSE ENERGY SERVICES LIMITED Integrity and excellence in every aspect INTRODUCTION ‘This Quality management plan shows clearly how Traverse Energy Service Limited (referred as TESL) will carry out an effective implementation of Its quality system during the PRS UPGRADE OF GNI IKEJA 1A PIPELINE SEGEMENT AT ABOVE GROUND INSTALLATION. TESL Management is dedicated to providing CENT commitment that will establish and execute this quality plan as stated. All construction activities shall be performed according to this plan, CLIENT Specifications, applicable industry codes, Standards and applicable government Regulations. DEFINITIONS: > TESL ‘Traverse Energy Services Limited > NCR Non Conformance Report REFERENCE DOCUMENTS (STANDARDS) > ASME B31.4 Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids ASME 816.9 Factory-Made Wrought Steel Butt welding Fittings APISL. Specification for Line Pipe ‘APISTD 1104 Welding of Pipelines and Related Facilities [APIRP 1100 Pressure Testing of Liquid Petroleum Pipelines ASTM A370 Mechanical Testing of Stee! Products ASTME 709 Magnetic Particle Examination DNV 1981 Rules for submarine pipeline systems 150 9001, Quality systems: model for quality assurance in production, Installation and servicing Mss sP 44 ‘Steel pipe line flanges. > ASME 831.8 Gas Transmission and Distribution Fi 31 Alcon Road, Woji, Por Harcourt, Rivers State, Nigeria a TRAVERSE ENERGY SERVICES LIMITED Integrity and excellence in every aspect 4.0 TESL POLICY STATEMENT AND OBJECTIVES TRAVERSE ENERGY SERVICES LIMITED Traverse Coeey Serco United TES) an Instatation and Commasioning ((POC) companys estab tine Layne Fact Constaction, Uparade and Mainten Improve the service we provide to eet out Clans legal and regulatory requirements 2001:2018 Qusity Stem Standarss. Amel goo fowards Oust by quality, TEL has set standard ot dl bush and commited to te devary ot ‘Gualeypreducts and sensces in fl Cond wth Wdatractua requirements through: cright iat Tine” Service and Project Delivery {cident Guatty Conte Quay Asurance ‘aac Spcietons Gulranteed 31 Akon Road, Woj, Port Harcourt, Rivers State, Nigeria TRAVERSE ENERGY SERVICES LIMITED Integrity and excellence in every aspect 5.0 QUALITY SYSTEM DESCRIPTION ‘TESL has established the quality management system and prepared the controlling document as the s based on 1509001: 2015 "Quality Management legislative basis for the quality management activi system- Requirements". The purpose of the implementation of quality management system Is to improve, perfect and enhance the quality of TESL continuously. 5.1. CONTROL PROCEDURES/WORK INSTRUCTIONS. Each procedure of work instruction is a specified way to perform the respective TESL activity. These be issued detailing how the processes and the work will be performed 5.2 MANAGEMENT SYSTEM IMPLEMENTATION ESL has developed Quality Control Procedures and work Instructions to cover its scope of operations. The procedures, Work Instructions and project specific procedures will be used to carryout activities ‘on the project. “The Quality Management System will be implemented a follows: s2, covmnar seve Contract review is undertaken by Management inline with the contract requirement. 5.2.2, DOCUMENT /RECORD CONTROL ‘The Document Controller is responsible for the document control program, which includes all construction and reference drawings, Contract Documents and specifications. He shall | implement a record file for all construction and reference drawings as per the Document Control Procedure/record contral procedure. When new revisions are issued, they shall be entered into a Project Document Register, which shall be updated by placing the superseded drawing under the new revision and stamping “SUPERSEDED” on the old drawing. The Project Manager is responsible for ensuring that field personnel use the latest drawing j revisions for all activities. The Welding Inspector shall be responsible for as-built. The drawing sizes, type and contents ofthe as-built will be completed as described in the CLIENT 31 Akon Road, Woii, Port Harcourt, Rivers State, Nigeria, Page IS TRAVERSE ENERGY SERVICES LIMITED Integrity and excellence in every aspect specifications. After each as-built is completed it will be given to the Document controller who shall maintain an as-built records. . MATERIAL CONTROL ‘All consumable and other temporary materials shall be purchased in strict compliance with the Contract Documents and specifications. The Construction Manager is responsible for ion to allow the reviewing all purchase orders to ensure they contain the necessary informat! Purchaser to purchase material that meets contract requirements ‘The Quality Contro! Department shal inspect all TESL free isued and purchased material Inspection shall be performed to ensure compliance with the manufacturer's information, requiring a grade CLIENT supplied Codes or standatds, specifications and drawings. Mate or type marking shal be identified in a manner that allows traceability until installation of any section, or pieces not used at one time Ifa deficiency i noted, an Overage, Short & Damage (OS&D) report shall be filed out and the information entered into the Material Receiving Report. The material wil be isolated until 2 resolution is reached by the Project Manager, Quality Assurance & Control Department and the CLIENT Representative, at which time the OS&D report and material Receiving Report wll be signed as completed, Individual material that has an expiration date wil be closely monitored in storage, so that items with less shelf life willbe Issued for use first. Materials such a5 paints, coatings, welding consumables that require specific temperature range for storage shall be Kept according to the manufacturer's recommendations, The quality Control Department shall maintain complete records of material test reports and/or certificates of compliance on all materials either purchased by ‘ESL or Vendor furnished information supplied with a product will be maintained and turned over to the CLIENT at the completion of the Project or as requested. ‘The Quality Control Department will periodically perform inspections to ensure all material and conditions comply with the Contract Documents and specification. Inspection results will be documented on a Material Inspection Report form and maintained with the other Project Quality Control Documentation. 131 Alcon Road, Woji, Port Harcourt, Rivers State, Nigeria Page l6 524, 526. TRAVERSE ENERGY SERVICES LIMITED Integrity and excellence in every aspect TESTING CONTROL Testing required satisfying the Contract Document, specifications, applicable Codes and ‘Standards would be witnessed or monitored by the Quality Control Department. Testing will be performed in accordance with the applicable sections of each approved Testing Procedure. CLIENT shall be given adequate notice to allow for the witnessing of any test, or portions of tests that may be required. All test results shall be documented in accordance with approved test procedures and reports. ‘TOOLS AND INSTRUMENT CONTROL {ll tools and instrumentation shall be purchased in strict compliance with the Contract Documents and Speciiations. |The Quality Control Department in conjunction with the Construction Manager is responsible for reviewing all purchase orders to ensure they

You might also like