Element Approved Qty. Conc.

actual conc diff %

Raft 2,384.00

Column Raft to 2nd BF 66.834


Column 2nd BFt to 1st BF 73.562
Column 1st BF - to Gr 62.236
Column Gr - 1st floor 49.508
Column 1st - to 2nd 47.686
Column 2nd - to 3rd 47.686

Core From Raft 2nd BF 21.442


Core From 2nd BF to 1st BF 24.539
Core From 1st BF to Gr 21.413
Core From Gr to 1st Floor 20.198
Core From 1st Floor to 2nd Floor 19.846
Core From 2nd Floor to 3rd Floor 19.846

Retaining Wall 1st & 2nd BF 362.540

Ceiling 2nd Basement 493.088


Ceiling 1st Basement 504.199
Ceiling Gr 236.791
Ceiling 1st 310.728
Ceiling 2nd 310.728

Beams 2nd Basement 10.401


Beams 1st Basement 46.790
Beams Gr 16.379
Beam 1st 9.912
Beam 2nd 9.912
total 5,170.262 5,275.00 104.74 2.03%

total 278.76 280.00 1.24 0.44%


5,215,000.00
Vos

VO#

VO#1

VO#2

VO#3

VO#4

VO#5

VO#6

VO#7

VO#8

VO#9

VO#10

VO#11

VO#12

VO#13

VO#13

VO#14

VO#15
VO#16

VO#17
Total
Vos

Item Cost Price Profit Margin

Steel & Concrete price difference 1,465,013 1,465,013 - 0%

Demolishing 609,313 731,175 121,863 17%

‫مشمع‬ 14,448 17,338 2,890 17%

‫سلك شبك‬ 53,075 63,690 10,615 17%

‫نقل مخلفات‬ 9,994 11,993 1,999 17%

‫تشوين‬ 23,985 28,782 4,797 17%

‫عالوات أدوار‬ - 202,715 202,715 100%

‫ خرسانة‬Sikament 23,179 27,815 4,636 17%

‫إيجار جاكات‬ 32,083 38,500 6,417 17%

‫ملء مونة‬ 17,930 21,516 3,586 17%

‫ملء محارة‬ 9,172 11,006 1,834 17%


supply
Electric works #1 2nd basment 32,945 54,360 21,415 39%

Electric works #2 1st basment 47,674 119,440 71,766 60%


27,674.00
Electric works #3ground 97,256 215,249 117,993 55%
62,256.00
Electric works #41st 71,569 180,602 109,033 60%
38,569.00
Electric works #52nd 54,760 169,615 114,855 68% 21,760.00

‫فك مواسير‬ 28,333 34,000 5,667 17%

Electric works #53rdto7th floor 74,501 152,032 77,531 51%

2,665,230 3,544,839 879,609 24.81%


install

20,000.00

35,000.00

33,000.00
33,000.00

33,000.00
‫الوحدة‬ ‫البند‬ ‫الرقم‬ ‫مسلسل‬

‫للعناصر اإلنشائيه أعلي )‪ (Fcu = 35 MPa‬توريد وصب خرسانه مسلحه‬


‫األرض على أى منسوب و مكونة من الخلطة المصممة و حسب القطاعات‬
‫الموضحة بالرسومات األنشائية والفئة تشمل الشدات والسقاالت وحديد التسليح‬
‫وتشمل اإلضافات وفواصل التمدد والفواصل اإلنشائية والمواد المالئة للفواصل‬
‫‪33.02.5.001.3.1‬‬
‫واإلكسسوارات والنقل والخلط و الصب و التشطيب والمعالجه واإلختبارات وذلك‬
‫طبقا للرسومات والمواصفات وتعليمات اإلستشاري‪ .‬علي ان يتم خصم كميات‬
‫الحديد طبقا لما ورد بلوحات الطرح مع االتفاق علي نسبة الهالك بعد اعتماد‬
‫االستشاري‬
‫م‪3‬‬ ‫األعمدة‬
‫م‪3‬‬ ‫األعمدة ‪ -‬الدور الثاني‬
‫م‪3‬‬ ‫األعمدة ‪ -‬الدور الثالث‬
‫م‪3‬‬ ‫األعمدة ‪ -‬الدور الثالث‬
‫م‪3‬‬ ‫الحوائط‬
‫م‪3‬‬ ‫الحوائط الدور الثاني‬
‫م‪3‬‬ ‫الحوائط الدور الثالث‬
‫م‪3‬‬ ‫الحوائط الدور الثالث‬
‫م‪3‬‬ ‫البالطات الدور االرضي‬
‫م‪3‬‬ ‫البالطات سقف الدور االول‬
‫م‪3‬‬ ‫البالطات سقف الدور الثاني‬
‫م‪3‬‬ ‫البالطات سقف الدور الثاني‬
‫م‪3‬‬ ‫البالطات سقف الدور الثالث‬
‫م‪3‬‬ ‫الكمرات الدور االرضي‬
‫م‪3‬‬ ‫الكمرات سقف الدور االول‬
‫م‪3‬‬ ‫الكمرات سقف الدور الثاني‬
‫م‪3‬‬ ‫الكمرات سقف الدور الثاني‬
‫م‪3‬‬ ‫الكمرات سقف الدور الثالث‬
‫م‪3‬‬ ‫الساللم الدور االرضي‬
‫م‪3‬‬ ‫الساللم الدور االرضي‬
‫م‪3‬‬ ‫الساللم الدور االول‬
‫م‪3‬‬ ‫الساللم الدور االول‬
‫م‪3‬‬ ‫سلم الدور الثاني (‪)1‬‬
‫م‪3‬‬ ‫سلم الدور الثاني (‪)2‬‬
‫م‪3‬‬ ‫سلم الدور الثالث (‪)1‬‬
‫م‪3‬‬ ‫سلم الدور الثالث (‪)2‬‬
‫فرق اسعار الخرسانة عن العقد ( ‪ 957.6‬متوسط ‪ -‬سعر العقد ‪ )660‬لزوم صبة‬
‫م‪3‬‬
‫االعمدة و الحوائط و البالطات‬
‫فرق اسعار الخرسانة عن العقد ( ‪ 923.4‬متوسط ‪ -‬سعر العقد ‪ )660‬لزوم صبة‬
‫م‪3‬‬
‫االعمدة و الحوائط و البالطات‬
‫فرق اسعار الخرسانة عن العقد ( ‪ 923.4‬متوسط ‪ -‬سعر العقد ‪ )660‬لزوم صبة‬
‫م‪3‬‬
‫االعمدة و الحوائط و البالطات‬
‫فرق اسعار الخرسانة عن العقد ( ‪ 923.4‬متوسط ‪ -‬سعر العقد ‪ )660‬لزوم صبة‬
‫م‪3‬‬
‫االعمدة و الحوائط و البالطات‬
‫متوسط ‪ -‬سعر العقد ‪ )660‬لزوم صبة ‪ ( 889.2‬فرق اسعار الخرسانة عن العقد‬
‫م‪3‬‬
‫االعمدة و الحوائط و البالطات‬
‫متوسط ‪ -‬سعر العقد ‪ )660‬لزوم صبة ‪ ( 889.2‬فرق اسعار الخرسانة عن العقد‬
‫م‪3‬‬
‫االعمدة و الحوائط و البالطات‬
‫متوسط ‪ -‬سعر العقد ‪ )660‬لزوم صبة ‪ ( 889.2‬فرق اسعار الخرسانة عن العقد‬
‫م‪3‬‬
‫االعمدة و الحوائط و البالطات‬
‫متوسط ‪ -‬سعر العقد ‪ )660‬لزوم صبة ‪ ( 889.2‬فرق اسعار الخرسانة عن العقد‬
‫م‪3‬‬
‫االعمدة و الحوائط و البالطات‬
‫متوسط ‪ -‬سعر العقد ‪ )660‬لزوم صبة ‪ ( 889.2‬فرق اسعار الخرسانة عن العقد‬
‫م‪3‬‬
‫االعمدة و الحوائط و البالطات‬
‫متوسط ‪ -‬سعر العقد ‪ )660‬لزوم صبة ‪ ( 889.2‬فرق اسعار الخرسانة عن العقد‬
‫م‪3‬‬
‫االعمدة و الحوائط و البالطات‬
‫الكمية‬ ‫الكمية‬
‫االجمالى‬ ‫إستقطاع‬ ‫نسبة اإلنجاز‬ ‫الفئة‬
‫اإلجمالى‬ ‫الحالية‬ ‫السابقة‬ ‫بالمقايسة‬

EGP 308,416.20 0 100% 111.745 0.000 111.745 550 2,760


EGP 131,613.36 0 100% 47.686 0.000 47.686 550 2,760
EGP 0.00 0 90% 0.000 (42.413) 42.413 550 2,760
EGP 114,717.33 0 98% 42.413 42.413 0.000 550 2,760
EGP 116,217.43 0 100% 41.610 0.000 41.610 210 2,793
EGP 55,429.88 0 100% 19.846 0.000 19.846 210 2,793
EGP 0.00 0 90% 0.000 (20.228) 20.228 210 2,793
EGP 53,670.64 0 95% 20.228 20.228 0.000 210 2,793
EGP 599,791.60 0 100% 236.791 0.000 236.791 2,500 2,533
EGP 787,074.02 0 100% 310.728 0.000 310.728 2,500 2,533
EGP 0.00 0 90% 0.000 (310.052) 310.052 2,500 2,533
EGP 769,654.48 0 98% 310.052 310.052 0.000 2,500 2,533
EGP 704,155.85 0 90% 308.881 308.881 0.000 2,500 2,533
EGP 42,994.88 0 100% 16.379 0.000 16.379 130 2,625
EGP 26,019.00 0 100% 9.912 0.000 9.912 130 2,625
EGP 0.00 0 90% 0.000 (9.1120) 9.112 130 2,625
EGP 23,919.00 0 100% 9.112 9.1120 0.000 130 2,625
EGP 21,234.15 0 90% 8.988 8.9880 0.000 130 2,625
EGP 29,384.99 0 90% 12.256 0.000 12.256 120 2,664
EGP 6,256.40 0 70% 3.355 0.000 3.355 120 2,664
EGP 8,051.52 0 90% 3.358 0.000 3.358 120 2,664
EGP 5,447.08 0 70% 2.921 0.000 2.921 120 2,664
EGP 6,262.00 0 70% 3.358 0.000 3.358 120 2,664
EGP 7,003.39 0 90% 2.921 0.000 2.921 120 2,664
EGP 6,262.00 0 70% 3.358 3.358 0.000 120 2,664
EGP 7,003.39 0 90% 2.921 2.921 0.000 120 2,664
EGP 17,376.57 0 100% 58.389 0.000 58.389 0 297.6

EGP 173,544.84 0 100% 658.864 0.000 658.864 0 263.4

EGP 24,511.52 0 100% 93.058 0.000 93.058 0 263.4

EGP 1,157.17 0 70% 6.276 0.000 6.276 0 263.4

EGP 1,077.52 0 70% 6.716 3.358 3.358 0 229.2


EGP 0.00 0 90% 0.000 (322.085) 322.085 0 229.2

EGP 73,821.88 0 100% 322.085 322.085 0.000 0 229.2

EGP 0.00 0 90% 0.000 (62.640) 62.640 0 229.2

EGP 14,357.09 0 100% 62.640 62.640 0.000 0 229.2

EGP 66,172.55 0 90% 320.790 320.790 0.000 0 229.2


Approved
Element Steel Steel/m3 actual diff.
Qty. Conc.

Raft 2,384.00 200,379.62 84.05185

Column Raft to 2nd BF 66.834


45,737.23 325.772
Column 2nd BFt to 1st BF 73.562
Column 1st BF - to Gr 62.236 22,393.37 359.8158
Column Gr - 1st floor 49.508 12,736.36 257.2612
Column 1st - to 2nd 47.686 12,948.03 271.5257
Column 2nd - to 3rd 47.686 12,948.03 271.5257

Core From Raft 2nd BF 21.442 6,458.94 301.2284


Core From 2nd BF to 1st BF 24.539 6,887.81 280.6883
Core From 1st BF to Gr 21.413 5,269.32 246.0775
Core From Gr to 1st Floor 20.198 4,970.52 246.0942
Core From 1st Floor to 2nd Floor 19.846 41,914.23 2112
Core From 1st Floor to 2nd Floor 19.846 41,914.23 2112

Retaining Wall 1st & 2nd BF 362.540 39,251.80 108.2689

Ceiling 2nd Basement 493.088 70,116.17 142.1981


Ceiling 1st Basement 504.199 102,840.38 203.968
Ceiling Gr 236.791 43,269.01 182.7308
Ceiling 1st 310.728 48,241.15 155.252
Ceiling 2nd 310.728 48,241.15 155.252

Beams 2nd Basement 10.401 1,266.62 121.778


Beams 1st Basement 46.790 2,751.95 58.8155
Beams Gr 16.379 5,175.10 315.9606
Beam 1st 9.912 3,085.09 311.248
Beam 2nd 9.912 3,085.09 311.248

Stairs 2nd BF 3.207 2,170.45 676.7852


Stairs 1st BF 9.220 3,326.66 360.8189
Stairs Gr 15.591 1,220.00 78.25027
Stairs 1st 6.279 1,220.00 194.2935
Stairs 2nd 6.279 1,220.00 194.2935

791,038.31 782,000.00 (9,038.31)


%

-1% 782 842


Indirect Cost Korba Assets
31/12/2018 31/05/2019 30/06/2019 7/31/2019 11/30/2019 Furniture 9,576
Buffet 36,747 46,747 47,204 47,922 49,722 Air Condition 17,654
Transportation 41,400 75,900 82,800 90,100 117,700 ‫ميزان قامة‬ 5,850
Site Tools 37,331 40,331 40,458 40,563 44,563 Fence 33,400
Stationary Tools & Photo Copy 21,182 23,297 23,297 23,297 25,306 Furniture 7,030
Guard 11,700 18,200 19,500 20,800 26,000 Water Dispenser 1,605
Safety Tools 40,000 52,395 52,395 52,395 52,395 Scaffold 18,650
Scaffold Rent 47,650 47,650 47,650 47,650 47,650 Caravan 115,475
Consultant Lab 8,465 8,465 8,465 8,465 8,465 Total 209,240
Car Fuel 3,534 3,534 3,534 3,534 3,534
Uber 6,220 6,220 6,220 6,220 6,220
Site Preparation 59,000 59,000 59,000 59,000 59,000
Mobile 945 2,145 2,385 2,385 3,385
Actual O.D

P.C 166,600

Concrete 4,201,775

Steel 2,943,280 2,591,050

Delivered O.D/S.D

P.C 275 279

Concrete 4,034 3,779

Steel 569 509


Q EGP

R.C 3,264 -

Steel 166 -

Sub. -

Farmaga - 8,570

Selk & Bascout - 18,255

Labor - 20,135

Waste % Crane - 24,000

Tests 0 2,060

255 6.74% Tests 0 798

44 8.64% Electricity 0 213,000

286,818
total R.C STEEL FAR SEL;

2019 col 733 - - 1,343 2,860

wall 280 - - 513 1,092

2019 slab 3,333 - - 6,104 13,002

2019 beam 173 - - 317 676

2019 stairs 160 - - 293 624

2019 Total 4,680 - - 8,570 18,255

Masonry

Concrete

Sub Elec
Labor CR TE

3,155.04 3,761 125 11,244

1,204.66 1,436 48 4,293

14,341.18 17,094 568 51,109

745.74 889 30 2,658

688.38 821 27 2,453

20,135 24,000 798 71,758


‫الشرقيون للتنمية العمرانية‬
‫االدارة الهندسية ‪ -‬المكتب الفني‬
‫مشروع ‪ /‬عمارة الكوربة‬

‫‪###‬‬ ‫أسعار األعمال المدنية لعمارة الكوربة‬


‫‪61.00‬‬ ‫‪500.00‬‬ ‫ردم‬
‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫بسكوت وسلك‬ ‫فرمجة‬ ‫توتال‬ ‫مشمع‬ ‫اختبارات‬ ‫معالجة‬ ‫هالك حديد‬ ‫حديد‬ ‫مصنعيات‬ ‫هالك خرسانة‬ ‫خرسانة‬ ‫عمالة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬

‫‪762.50‬‬ ‫‪-‬‬ ‫‪4.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2.00‬‬ ‫‪2.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪130.00‬‬ ‫‪29.50‬‬ ‫‪590.00‬‬ ‫‪5.00‬‬ ‫م‪3‬‬ ‫)‪ (Fcu = 20 MPa‬توريد وصب خرسانة عادية‬
‫أسفل االساسات المسلحة‬
‫‪415,562.50‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,180.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,090.00‬‬ ‫‪1,090.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪70,850.00‬‬ ‫‪16,077.50‬‬ ‫‪321,550.00‬‬ ‫‪2,725.00‬‬ ‫‪545.00‬‬ ‫‪BOQ Budget‬‬
‫‪212,554.50‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,115.04‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪557.52‬‬ ‫‪557.52‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪36,238.80‬‬ ‫‪8,223.42‬‬ ‫‪164,468.40‬‬ ‫‪1,393.80‬‬ ‫‪278.76‬‬ ‫‪Invoice Budget‬‬
‫‪415,562.50‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,180.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,090.00‬‬ ‫‪1,090.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪70,850.00‬‬ ‫‪16,077.50‬‬ ‫‪321,550.00‬‬ ‫‪2,725.00‬‬ ‫‪545.00‬‬ ‫‪Planned Value‬‬
‫‪212,554.50‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,115.04‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪557.52‬‬ ‫‪557.52‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪36,238.80‬‬ ‫‪8,223.42‬‬ ‫‪164,468.40‬‬ ‫‪1,393.80‬‬ ‫‪278.76‬‬ ‫‪Earned Value‬‬
‫‪-‬‬ ‫‪201,206.51‬‬ ‫‪-‬‬ ‫‪1,430.31‬‬ ‫‪2,317.00‬‬ ‫‪1,645.00‬‬ ‫‪436.30‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪23,500.00‬‬ ‫‪166,600.00‬‬ ‫‪5,277.90‬‬ ‫‪Actual Cost‬‬
‫‪11,347.99‬‬ ‫‪-‬‬ ‫‪315.27-‬‬ ‫‪2,317.00-‬‬ ‫‪1,645.00-‬‬ ‫‪121.22‬‬ ‫‪557.52‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪12,738.80‬‬ ‫‪8,223.42‬‬ ‫‪2,131.60-‬‬ ‫‪3,884.10-‬‬ ‫‪Cost Variance‬‬

‫إجمالي التكلفة‬ ‫‪VO Cost /‬‬ ‫بسكوت وسلك‬ ‫فرمجة‬ ‫توتال‬ ‫ونش‬ ‫اختبارات‬ ‫معالجة‬ ‫هالك حديد‬ ‫حديد‬ ‫مصنعيات‬ ‫هالك خرسانة‬ ‫خرسانة‬ ‫عمالة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬
‫‪VOS Price‬‬ ‫وسلك شبك‬
‫‪Indirect Cost‬‬

‫‪10.00‬‬ ‫‪10.00‬‬ ‫‪-‬‬ ‫‪41.94‬‬ ‫‪10.00‬‬ ‫‪1.00‬‬ ‫‪12.61‬‬ ‫‪420.20‬‬ ‫‪220.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪3.00‬‬ ‫)‪ (Fcu = 35 MPa‬توريد وصب خرسانه مسلحه‬
‫للبشة أسفل األرض‬
‫‪3,725,414.83‬‬ ‫‪739,750.34‬‬ ‫‪21,000.00‬‬ ‫‪21,000.00‬‬ ‫‪-‬‬ ‫‪88,074.57‬‬ ‫‪21,000.00‬‬ ‫‪2,100.00‬‬ ‫‪26,472.52‬‬ ‫‪882,417.40‬‬ ‫‪462,000.00‬‬ ‫‪69,300.00‬‬ ‫‪1,386,000.00‬‬ ‫‪6,300.00‬‬ ‫‪2,100.00‬‬ ‫‪BOQ Budget‬‬
‫‪4,129,678.49‬‬ ‫‪739,750.34‬‬ ‫‪23,843.43‬‬ ‫‪23,843.43‬‬ ‫‪-‬‬ ‫‪100,000.00‬‬ ‫‪23,843.43‬‬ ‫‪2,384.34‬‬ ‫‪30,056.94‬‬ ‫‪1,001,898.10‬‬ ‫‪524,555.53‬‬ ‫‪78,683.33‬‬ ‫‪1,573,666.58‬‬ ‫‪7,153.03‬‬ ‫‪2,384.34‬‬ ‫‪Invoice Budget‬‬
‫‪3,725,414.83‬‬ ‫‪739,750.34‬‬ ‫‪21,000.00‬‬ ‫‪21,000.00‬‬ ‫‪-‬‬ ‫‪88,074.57‬‬ ‫‪21,000.00‬‬ ‫‪2,100.00‬‬ ‫‪26,472.52‬‬ ‫‪882,417.40‬‬ ‫‪462,000.00‬‬ ‫‪69,300.00‬‬ ‫‪1,386,000.00‬‬ ‫‪6,300.00‬‬ ‫‪2,100.00‬‬ ‫‪Planned Value‬‬
‫‪4,129,678.49‬‬ ‫‪739,750.34‬‬ ‫‪23,843.43‬‬ ‫‪23,843.43‬‬ ‫‪-‬‬ ‫‪100,000.00‬‬ ‫‪23,843.43‬‬ ‫‪2,384.34‬‬ ‫‪30,056.94‬‬ ‫‪1,001,898.10‬‬ ‫‪524,555.53‬‬ ‫‪78,683.33‬‬ ‫‪1,573,666.58‬‬ ‫‪7,153.03‬‬ ‫‪2,384.34‬‬ ‫‪Earned Value‬‬
‫‪1,303‬‬ ‫‪4,354,076.08‬‬ ‫‪42,386.01‬‬ ‫‪30,197.06‬‬ ‫‪48,917.01‬‬ ‫‪62,202.77‬‬ ‫‪9,211.22‬‬ ‫‪-‬‬ ‫‪1,245,832.40‬‬ ‫‪524,555.53‬‬ ‫‪-‬‬ ‫‪2,279,345.81‬‬ ‫‪111,428.28‬‬ ‫‪Actual Cost‬‬
‫‪224,397.59-‬‬ ‫‪18,542.58-‬‬ ‫‪6,353.63-‬‬ ‫‪48,917.01-‬‬ ‫‪37,797.23‬‬ ‫‪14,632.21‬‬ ‫‪2,384.34‬‬ ‫‪30,056.94‬‬ ‫‪243,934.30-‬‬ ‫‪-‬‬ ‫‪78,683.33‬‬ ‫‪705,679.23-‬‬ ‫‪104,275.25-‬‬ ‫‪Cost Variance‬‬
‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫‪VO Cost‬‬ ‫بسكوت وسلك‬ ‫فرمجة‬ ‫توتال‬ ‫ونش‬ ‫اختبارات‬ ‫تعويضات‬ ‫هالك حديد‬ ‫حديد‬ ‫مصنعيات‬ ‫هالك خرسانة‬ ‫خرسانة‬ ‫عمالة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬
‫‪3,284.81‬‬ ‫‪10.00‬‬ ‫‪25.00‬‬ ‫‪-‬‬ ‫‪40.00‬‬ ‫‪20.00‬‬ ‫‪1.00‬‬ ‫‪51.20‬‬ ‫‪1,706.61‬‬ ‫‪735.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪3.00‬‬ ‫م‪3‬‬ ‫االعمدة‬ ‫‪3.2.2‬‬
‫‪461,269.31‬‬ ‫‪44,098.26‬‬ ‫‪1,270.00‬‬ ‫‪3,175.00‬‬ ‫‪-‬‬ ‫‪5,080.00‬‬ ‫‪2,540.00‬‬ ‫‪127.00‬‬ ‫‪6,502.20‬‬ ‫‪216,739.86‬‬ ‫‪93,345.00‬‬ ‫‪4,191.00‬‬ ‫‪83,820.00‬‬ ‫‪381.00‬‬ ‫‪127‬‬ ‫‪BOQ Budget‬‬
‫‪505,269.36‬‬ ‫‪44,098.26‬‬ ‫‪1,403.95‬‬ ‫‪3,509.88‬‬ ‫‪-‬‬ ‫‪5,615.80‬‬ ‫‪2,807.90‬‬ ‫‪140.40‬‬ ‫‪7,188.00‬‬ ‫‪239,599.94‬‬ ‫‪103,190.33‬‬ ‫‪4,633.04‬‬ ‫‪92,660.70‬‬ ‫‪421.19‬‬ ‫‪140.40‬‬ ‫‪Invoice Budget‬‬
‫‪461,269.31‬‬ ‫‪44,098.26‬‬ ‫‪1,270.00‬‬ ‫‪3,175.00‬‬ ‫‪-‬‬ ‫‪5,080.00‬‬ ‫‪2,540.00‬‬ ‫‪127.00‬‬ ‫‪6,502.20‬‬ ‫‪216,739.86‬‬ ‫‪93,345.00‬‬ ‫‪4,191.00‬‬ ‫‪83,820.00‬‬ ‫‪381.00‬‬ ‫‪127.00‬‬ ‫‪Planned Value‬‬
‫‪505,269.36‬‬ ‫‪44,098.26‬‬ ‫‪1,403.95‬‬ ‫‪3,509.88‬‬ ‫‪-‬‬ ‫‪5,615.80‬‬ ‫‪2,807.90‬‬ ‫‪140.40‬‬ ‫‪7,188.00‬‬ ‫‪239,599.94‬‬ ‫‪103,190.33‬‬ ‫‪4,633.04‬‬ ‫‪92,660.70‬‬ ‫‪421.19‬‬ ‫‪140.40‬‬ ‫‪Earned Value‬‬
‫‪1,743‬‬ ‫‪607,004.76‬‬ ‫‪2,662.99‬‬ ‫‪1,897.20‬‬ ‫‪3,073.32‬‬ ‫‪3,908.03‬‬ ‫‪578.71‬‬ ‫‪8,814.68‬‬ ‫‪332,673.89‬‬ ‫‪103,190.33‬‬ ‫‪143,204.89‬‬ ‫‪7,000.73‬‬ ‫‪Actual Cost‬‬
‫‪101,735.39-‬‬ ‫‪1,259.04-‬‬ ‫‪1,612.68‬‬ ‫‪3,073.32-‬‬ ‫‪1,707.77‬‬ ‫‪2,229.19‬‬ ‫‪8,674.28-‬‬ ‫‪7,188.00‬‬ ‫‪93,073.95-‬‬ ‫‪-‬‬ ‫‪4,633.04‬‬ ‫‪50,544.19-‬‬ ‫‪6,579.54-‬‬ ‫‪Cost Variance‬‬
‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫‪VO Cost‬‬ ‫بسكوت وسلك‬ ‫فرمجة‬ ‫توتال‬ ‫ونش‬ ‫اختبارات‬ ‫تعويضات‬ ‫هالك حديد‬ ‫حديد‬ ‫مصنعيات‬ ‫هالك خرسانة‬ ‫خرسانة‬ ‫عمالة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬
‫‪2,376.40‬‬ ‫‪10.00‬‬ ‫‪25.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪20.00‬‬ ‫‪1.00‬‬ ‫‪28.53‬‬ ‫‪950.87‬‬ ‫‪645.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪3.00‬‬ ‫م‪3‬‬ ‫الحوائط‬ ‫‪3.2.3‬‬
‫‪127,620.92‬‬ ‫‪15,930.15‬‬ ‫‪470.00‬‬ ‫‪1,175.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪940.00‬‬ ‫‪47.00‬‬ ‫‪1,340.73‬‬ ‫‪44,691.04‬‬ ‫‪30,315.00‬‬ ‫‪1,551.00‬‬ ‫‪31,020.00‬‬ ‫‪141.00‬‬ ‫‪47.00‬‬ ‫‪BOQ Budget‬‬
‫‪125,196.99‬‬ ‫‪15,930.15‬‬ ‫‪459.80‬‬ ‫‪1,149.50‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪919.60‬‬ ‫‪45.98‬‬ ‫‪1,311.63‬‬ ‫‪43,721.15‬‬ ‫‪29,657.10‬‬ ‫‪1,517.34‬‬ ‫‪30,346.80‬‬ ‫‪137.94‬‬ ‫‪45.98‬‬ ‫‪Invoice Budget‬‬
‫‪127,620.92‬‬ ‫‪15,930.15‬‬ ‫‪470.00‬‬ ‫‪1,175.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪940.00‬‬ ‫‪47.00‬‬ ‫‪1,340.73‬‬ ‫‪44,691.04‬‬ ‫‪30,315.00‬‬ ‫‪1,551.00‬‬ ‫‪31,020.00‬‬ ‫‪141.00‬‬ ‫‪47.00‬‬ ‫‪Planned Value‬‬
‫‪125,196.99‬‬ ‫‪15,930.15‬‬ ‫‪459.80‬‬ ‫‪1,149.50‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪919.60‬‬ ‫‪45.98‬‬ ‫‪1,311.63‬‬ ‫‪43,721.15‬‬ ‫‪29,657.10‬‬ ‫‪1,517.34‬‬ ‫‪30,346.80‬‬ ‫‪137.94‬‬ ‫‪45.98‬‬ ‫‪Earned Value‬‬
‫‪1,730‬‬ ‫‪145,068.31‬‬ ‫‪961.99‬‬ ‫‪685.35‬‬ ‫‪1,110.21‬‬ ‫‪1,411.74‬‬ ‫‪209.06‬‬ ‫‪3,184.23‬‬ ‫‪53,588.02‬‬ ‫‪29,657.10‬‬ ‫‪51,731.66‬‬ ‫‪2,528.96‬‬ ‫‪Actual Cost‬‬
‫‪19,871.32-‬‬ ‫‪502.19-‬‬ ‫‪464.15‬‬ ‫‪1,110.21-‬‬ ‫‪1,411.74-‬‬ ‫‪710.54‬‬ ‫‪3,138.25-‬‬ ‫‪1,311.63‬‬ ‫‪9,866.87-‬‬ ‫‪-‬‬ ‫‪1,517.34‬‬ ‫‪21,384.86-‬‬ ‫‪2,391.02-‬‬ ‫‪Cost Variance‬‬
‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫‪VO Cost‬‬ ‫بسكوت وسلك‬ ‫فرمجة‬ ‫توتال‬ ‫ونش‬ ‫اختبارات‬ ‫تعويضات‬ ‫هالك حديد‬ ‫حديد‬ ‫مصنعيات‬ ‫هالك خرسانة‬ ‫خرسانة‬ ‫عمالة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬
‫‪2,784‬‬ ‫‪2,379.40‬‬ ‫‪10.00‬‬ ‫‪25.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪20.00‬‬ ‫‪2.00‬‬ ‫‪28.53‬‬ ‫‪950.87‬‬ ‫‪645.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪5.00‬‬ ‫م‪3‬‬ ‫الحوائط الساندة‬ ‫‪3.2.4‬‬
‫‪818,952.41‬‬ ‫‪83,718.02‬‬ ‫‪3,090.00‬‬ ‫‪7,725.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪6,180.00‬‬ ‫‪618.00‬‬ ‫‪8,814.59‬‬ ‫‪293,819.80‬‬ ‫‪199,305.00‬‬ ‫‪10,197.00‬‬ ‫‪203,940.00‬‬ ‫‪1,545.00‬‬ ‫‪309.00‬‬ ‫‪BOQ Budget‬‬
‫‪715,329.57‬‬ ‫‪83,718.02‬‬ ‫‪2,654.50‬‬ ‫‪6,636.25‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,309.00‬‬ ‫‪530.90‬‬ ‫‪7,572.28‬‬ ‫‪252,409.27‬‬ ‫‪171,215.25‬‬ ‫‪8,759.85‬‬ ‫‪175,197.00‬‬ ‫‪1,327.25‬‬ ‫‪265.45‬‬ ‫‪Invoice Budget‬‬
‫‪818,952.41‬‬ ‫‪83,718.02‬‬ ‫‪3,090.00‬‬ ‫‪7,725.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪6,180.00‬‬ ‫‪618.00‬‬ ‫‪8,814.59‬‬ ‫‪293,819.80‬‬ ‫‪199,305.00‬‬ ‫‪10,197.00‬‬ ‫‪203,940.00‬‬ ‫‪1,545.00‬‬ ‫‪309.00‬‬ ‫‪Planned Value‬‬
‫‪715,329.57‬‬ ‫‪83,718.02‬‬ ‫‪2,654.50‬‬ ‫‪6,636.25‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,309.00‬‬ ‫‪530.90‬‬ ‫‪7,572.28‬‬ ‫‪252,409.27‬‬ ‫‪171,215.25‬‬ ‫‪8,759.85‬‬ ‫‪175,197.00‬‬ ‫‪1,327.25‬‬ ‫‪265.45‬‬ ‫‪Earned Value‬‬
‫‪744,301.77‬‬ ‫‪5,055.54‬‬ ‫‪3,601.72‬‬ ‫‪5,834.52‬‬ ‫‪7,419.16‬‬ ‫‪1,098.66‬‬ ‫‪16,734.16‬‬ ‫‪248,185.98‬‬ ‫‪171,215.25‬‬ ‫‪271,866.30‬‬ ‫‪13,290.48‬‬ ‫‪Actual Cost‬‬
‫‪28,972.20-‬‬ ‫‪2,401.04-‬‬ ‫‪3,034.53‬‬ ‫‪5,834.52-‬‬ ‫‪7,419.16-‬‬ ‫‪4,210.34‬‬ ‫‪16,203.26-‬‬ ‫‪7,572.28‬‬ ‫‪4,223.29‬‬ ‫‪-‬‬ ‫‪8,759.85‬‬ ‫‪96,669.30-‬‬ ‫‪11,963.23-‬‬ ‫‪Cost Variance‬‬

‫‪2,784‬‬ ‫‪2,379.40‬‬ ‫‪10.00‬‬ ‫‪25.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪20.00‬‬ ‫‪2.00‬‬ ‫‪28.53‬‬ ‫‪950.87‬‬ ‫‪645.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪5.00‬‬ ‫م‪3‬‬ ‫الحوائط الساندة لزوم خزان المياة وغرفة الطلمبات‬ ‫‪3.2.5‬‬
‫)‪ - (Fair face‬الحوائط الداخلية‬
‫‪186,814.32‬‬ ‫‪20,256.36‬‬ ‫‪700.00‬‬ ‫‪1,750.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,400.00‬‬ ‫‪140.00‬‬ ‫‪1,996.83‬‬ ‫‪66,561.12‬‬ ‫‪45,150.00‬‬ ‫‪2,310.00‬‬ ‫‪46,200.00‬‬ ‫‪350.00‬‬ ‫‪70.00‬‬ ‫‪BOQ Budget‬‬
‫‪165,613.87‬‬ ‫‪20,256.36‬‬ ‫‪610.90‬‬ ‫‪1,527.25‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,221.80‬‬ ‫‪122.18‬‬ ‫‪1,742.67‬‬ ‫‪58,088.84‬‬ ‫‪39,403.05‬‬ ‫‪2,015.97‬‬ ‫‪40,319.40‬‬ ‫‪305.45‬‬ ‫‪61.09‬‬ ‫‪Invoice Budget‬‬
‫‪186,814.32‬‬ ‫‪20,256.36‬‬ ‫‪700.00‬‬ ‫‪1,750.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,400.00‬‬ ‫‪140.00‬‬ ‫‪1,996.83‬‬ ‫‪66,561.12‬‬ ‫‪45,150.00‬‬ ‫‪2,310.00‬‬ ‫‪46,200.00‬‬ ‫‪350.00‬‬ ‫‪70.00‬‬ ‫‪Planned Value‬‬
‫‪165,613.87‬‬ ‫‪20,256.36‬‬ ‫‪610.90‬‬ ‫‪1,527.25‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,221.80‬‬ ‫‪122.18‬‬ ‫‪1,742.67‬‬ ‫‪58,088.84‬‬ ‫‪39,403.05‬‬ ‫‪2,015.97‬‬ ‫‪40,319.40‬‬ ‫‪305.45‬‬ ‫‪61.09‬‬ ‫‪Earned Value‬‬
‫‪189,597.33‬‬ ‫‪1,223.24‬‬ ‫‪871.47‬‬ ‫‪1,411.72‬‬ ‫‪1,795.14‬‬ ‫‪265.83‬‬ ‫‪4,048.99‬‬ ‫‪71,581.54‬‬ ‫‪39,403.05‬‬ ‫‪65,780.61‬‬ ‫‪3,215.76‬‬ ‫‪Actual Cost‬‬
‫‪23,983.47-‬‬ ‫‪612.34-‬‬ ‫‪655.78‬‬ ‫‪1,411.72-‬‬ ‫‪1,795.14-‬‬ ‫‪955.97‬‬ ‫‪3,926.81-‬‬ ‫‪1,742.67‬‬ ‫‪13,492.70-‬‬ ‫‪-‬‬ ‫‪2,015.97‬‬ ‫‪25,461.21-‬‬ ‫‪2,910.31-‬‬ ‫‪Cost Variance‬‬

‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫‪VO Cost‬‬ ‫بسكوت وسلك‬ ‫فرمجة‬ ‫توتال‬ ‫ونش‬ ‫اختبارات‬ ‫تعويضات‬ ‫هالك حديد‬ ‫حديد‬ ‫مصنعيات‬ ‫هالك خرسانة‬ ‫خرسانة‬ ‫عمالة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬

‫‪2,256.96‬‬ ‫‪10.00‬‬ ‫‪10.00‬‬ ‫‪-‬‬ ‫‪25.00‬‬ ‫‪10.00‬‬ ‫‪2.00‬‬ ‫‪23.80‬‬ ‫‪793.17‬‬ ‫‪685.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪5.00‬‬ ‫م‪3‬‬ ‫البالطات ومنحدرات السيارات‬ ‫‪3.2.6‬‬
‫‪2,111,758.73‬‬ ‫‪326,499.87‬‬ ‫‪7,910.00‬‬ ‫‪7,910.00‬‬ ‫‪-‬‬ ‫‪19,775.00‬‬ ‫‪7,910.00‬‬ ‫‪1,582.00‬‬ ‫‪18,821.91‬‬ ‫‪627,396.95‬‬ ‫‪541,835.00‬‬ ‫‪26,103.00‬‬ ‫‪522,060.00‬‬ ‫‪3,955.00‬‬ ‫‪791.00‬‬ ‫‪BOQ Budget‬‬
‫‪2,577,338.90‬‬ ‫‪326,499.87‬‬ ‫‪9,972.86‬‬ ‫‪9,972.86‬‬ ‫‪-‬‬ ‫‪24,932.15‬‬ ‫‪9,972.86‬‬ ‫‪1,994.57‬‬ ‫‪23,730.50‬‬ ‫‪791,016.68‬‬ ‫‪683,140.91‬‬ ‫‪32,910.44‬‬ ‫‪658,208.76‬‬ ‫‪4,986.43‬‬ ‫‪997.29‬‬ ‫‪Invoice Budget‬‬
‫‪2,111,758.73‬‬ ‫‪326,499.87‬‬ ‫‪7,910.00‬‬ ‫‪7,910.00‬‬ ‫‪-‬‬ ‫‪19,775.00‬‬ ‫‪7,910.00‬‬ ‫‪1,582.00‬‬ ‫‪18,821.91‬‬ ‫‪627,396.95‬‬ ‫‪541,835.00‬‬ ‫‪26,103.00‬‬ ‫‪522,060.00‬‬ ‫‪3,955.00‬‬ ‫‪791.00‬‬ ‫‪Planned Value‬‬
‫‪2,577,338.90‬‬ ‫‪326,499.87‬‬ ‫‪9,972.86‬‬ ‫‪9,972.86‬‬ ‫‪-‬‬ ‫‪24,932.15‬‬ ‫‪9,972.86‬‬ ‫‪1,994.57‬‬ ‫‪23,730.50‬‬ ‫‪791,016.68‬‬ ‫‪683,140.91‬‬ ‫‪32,910.44‬‬ ‫‪658,208.76‬‬ ‫‪4,986.43 997.29‬‬ ‫‪Earned Value‬‬
‫‪1,843‬‬ ‫‪2,793,466.23‬‬ ‫‪19,716.59‬‬ ‫‪14,046.69‬‬ ‫‪22,754.60‬‬ ‫‪28,934.70‬‬ ‫‪4,284.76‬‬ ‫‪65,263.14‬‬ ‫‪843,214.83‬‬ ‫‪683,140.91‬‬ ‫‪1,060,277.22‬‬ ‫‪51,832.80‬‬ ‫‪Actual Cost‬‬
‫‪216,127.33-‬‬ ‫‪9,743.73-‬‬ ‫‪4,073.83-‬‬ ‫‪22,754.60-‬‬ ‫‪4,002.55-‬‬ ‫‪5,688.10‬‬ ‫‪63,268.57-‬‬ ‫‪23,730.50‬‬ ‫‪52,198.15-‬‬ ‫‪-‬‬ ‫‪32,910.44‬‬ ‫‪402,068.46-‬‬ ‫‪46,846.37-‬‬ ‫‪Cost Variance‬‬
‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫بسكوت وسلك‬ ‫فرمجة‬ ‫توتال‬ ‫ونش‬ ‫اختبارات‬ ‫تعويضات‬ ‫هالك حديد‬ ‫حديد‬ ‫مصنعيات‬ ‫هالك خرسانة‬ ‫خرسانة‬ ‫عمالة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬

‫‪2,611‬‬ ‫‪2,231.96‬‬ ‫‪10.00‬‬ ‫‪10.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪10.00‬‬ ‫‪2.00‬‬ ‫‪23.80‬‬ ‫‪793.17‬‬ ‫‪685.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪5.00‬‬ ‫م‪3‬‬ ‫‪ (Fair‬بالطة سقف خزان المياة ‪ -‬األسقف الداخلية‬ ‫‪3.2.7‬‬
‫)‪face‬‬
‫‪46,549.43‬‬ ‫‪10,838.00‬‬ ‫‪160.00‬‬ ‫‪160.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪160.00‬‬ ‫‪32.00‬‬ ‫‪380.72‬‬ ‫‪12,690.71‬‬ ‫‪10,960.00‬‬ ‫‪528.00‬‬ ‫‪10,560.00‬‬ ‫‪80.00‬‬ ‫‪16.00‬‬ ‫‪BOQ Budget‬‬
‫‪88,889.80‬‬ ‫‪10,838.00‬‬ ‫‪349.70‬‬ ‫‪349.70‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪349.70‬‬ ‫‪69.94‬‬ ‫‪832.11‬‬ ‫‪27,737.13‬‬ ‫‪23,954.45‬‬ ‫‪1,154.01‬‬ ‫‪23,080.20‬‬ ‫‪174.85‬‬ ‫‪34.97‬‬ ‫‪Invoice Budget‬‬
‫‪46,549.43‬‬ ‫‪10,838.00‬‬ ‫‪160.00‬‬ ‫‪160.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪160.00‬‬ ‫‪32.00‬‬ ‫‪380.72‬‬ ‫‪12,690.71‬‬ ‫‪10,960.00‬‬ ‫‪528.00‬‬ ‫‪10,560.00‬‬ ‫‪80.00‬‬ ‫‪16.00‬‬ ‫‪Planned Value‬‬
‫‪88,889.80‬‬ ‫‪10,838.00‬‬ ‫‪349.70‬‬ ‫‪349.70‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪349.70‬‬ ‫‪69.94‬‬ ‫‪832.11‬‬ ‫‪27,737.13‬‬ ‫‪23,954.45‬‬ ‫‪1,154.01‬‬ ‫‪23,080.20‬‬ ‫‪174.85‬‬ ‫‪34.97‬‬ ‫‪Earned Value‬‬
‫‪100,510.17‬‬ ‫‪654.48‬‬ ‫‪466.27‬‬ ‫‪755.33‬‬ ‫‪960.47‬‬ ‫‪142.23‬‬ ‫‪2,166.38‬‬ ‫‪34,494.61‬‬ ‫‪23,954.45‬‬ ‫‪35,195.38‬‬ ‫‪1,720.56‬‬ ‫‪Actual Cost‬‬
‫‪11,620.37-‬‬ ‫‪304.78-‬‬ ‫‪116.57-‬‬ ‫‪755.33-‬‬ ‫‪960.47-‬‬ ‫‪207.47‬‬ ‫‪2,096.44-‬‬ ‫‪832.11‬‬ ‫‪6,757.48-‬‬ ‫‪-‬‬ ‫‪1,154.01‬‬ ‫‪12,115.18-‬‬ ‫‪1,545.71-‬‬ ‫‪Cost Variance‬‬
‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫بسكوت وسلك‬ ‫فرمجة‬ ‫توتال‬ ‫ونش‬ ‫اختبارات‬ ‫تعويضات‬ ‫هالك حديد‬ ‫حديد‬ ‫مصنعيات‬ ‫هالك خرسانة‬ ‫خرسانة‬ ‫عمالة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬
‫‪2,270‬‬ ‫‪1,939.79‬‬ ‫‪10.00‬‬ ‫‪10.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪10.00‬‬ ‫‪2.00‬‬ ‫‪21.11‬‬ ‫‪703.68‬‬ ‫‪485.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪5.00‬‬ ‫م‪3‬‬ ‫الكمرات‬ ‫‪3.2.8‬‬
‫‪147,304.84‬‬ ‫‪19,278.83‬‬ ‫‪660.00‬‬ ‫‪660.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪660.00‬‬ ‫‪132.00‬‬ ‫‪1,393.28‬‬ ‫‪46,442.73‬‬ ‫‪32,010.00‬‬ ‫‪2,178.00‬‬ ‫‪43,560.00‬‬ ‫‪330.00‬‬ ‫‪66.00‬‬ ‫‪BOQ Budget‬‬
‫‪130,215.31‬‬ ‫‪19,278.83‬‬ ‫‪571.90‬‬ ‫‪571.90‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪571.90‬‬ ‫‪114.38‬‬ ‫‪1,207.30‬‬ ‫‪40,243.33‬‬ ‫‪27,737.15‬‬ ‫‪1,887.27‬‬ ‫‪37,745.40‬‬ ‫‪285.95‬‬ ‫‪57.19‬‬ ‫‪Invoice Budget‬‬
‫‪147,304.84‬‬ ‫‪19,278.83‬‬ ‫‪660.00‬‬ ‫‪660.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪660.00‬‬ ‫‪132.00‬‬ ‫‪1,393.28‬‬ ‫‪46,442.73‬‬ ‫‪32,010.00‬‬ ‫‪2,178.00‬‬ ‫‪43,560.00‬‬ ‫‪330.00‬‬ ‫‪66.00‬‬ ‫‪Planned Value‬‬
‫‪130,215.31‬‬ ‫‪19,278.83‬‬ ‫‪571.90‬‬ ‫‪571.90‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪571.90‬‬ ‫‪114.38‬‬ ‫‪1,207.30‬‬ ‫‪40,243.33‬‬ ‫‪27,737.15‬‬ ‫‪1,887.27‬‬ ‫‪37,745.40‬‬ ‫‪285.95‬‬ ‫‪57.19‬‬ ‫‪Earned Value‬‬
‫‪120,710.35‬‬ ‫‪1,164.20‬‬ ‫‪829.41‬‬ ‫‪1,343.59‬‬ ‫‪1,708.51‬‬ ‫‪253.00‬‬ ‫‪3,853.59‬‬ ‫‪18,154.16‬‬ ‫‪27,737.15‬‬ ‫‪62,606.16‬‬ ‫‪3,060.57‬‬ ‫‪Actual Cost‬‬
‫‪9,504.96‬‬ ‫‪592.30-‬‬ ‫‪257.51-‬‬ ‫‪1,343.59-‬‬ ‫‪1,708.51-‬‬ ‫‪318.90‬‬ ‫‪3,739.21-‬‬ ‫‪1,207.30‬‬ ‫‪22,089.17‬‬ ‫‪-‬‬ ‫‪1,887.27‬‬ ‫‪24,860.76-‬‬ ‫‪2,774.62-‬‬ ‫‪Cost Variance‬‬
‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫بسكوت وسلك‬ ‫فرمجة‬ ‫توتال‬ ‫ونش‬ ‫اختبارات‬ ‫تعويضات‬ ‫هالك حديد‬ ‫حديد‬ ‫مصنعيات‬ ‫هالك خرسانة‬ ‫خرسانة‬ ‫عمالة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬
‫‪2,656‬‬ ‫‪2,270.38‬‬ ‫‪10.00‬‬ ‫‪15.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪10.00‬‬ ‫‪2.00‬‬ ‫‪32.05‬‬ ‫‪1,068.33‬‬ ‫‪435.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪5.00‬‬ ‫م‪3‬‬ ‫الساللم‬ ‫‪3.2.9‬‬
‫‪33,571.45‬‬ ‫‪4,056.46‬‬ ‫‪130.00‬‬ ‫‪195.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪130.00‬‬ ‫‪26.00‬‬ ‫‪416.65‬‬ ‫‪13,888.33‬‬ ‫‪5,655.00‬‬ ‫‪429.00‬‬ ‫‪8,580.00‬‬ ‫‪65.00‬‬ ‫‪13.00‬‬ ‫‪BOQ Budget‬‬
‫‪32,254.62‬‬ ‫‪4,056.46‬‬ ‫‪124.20‬‬ ‫‪186.30‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪124.20‬‬ ‫‪24.84‬‬ ‫‪398.06‬‬ ‫‪13,268.70‬‬ ‫‪5,402.70‬‬ ‫‪409.86‬‬ ‫‪8,197.20‬‬ ‫‪62.10‬‬ ‫‪12.42‬‬ ‫‪Invoice Budget‬‬
‫‪33,571.45‬‬ ‫‪4,056.46‬‬ ‫‪130.00‬‬ ‫‪195.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪130.00‬‬ ‫‪26.00‬‬ ‫‪416.65‬‬ ‫‪13,888.33‬‬ ‫‪5,655.00‬‬ ‫‪429.00‬‬ ‫‪8,580.00‬‬ ‫‪65.00‬‬ ‫‪13.00‬‬ ‫‪Planned Value‬‬
‫‪32,254.62‬‬ ‫‪4,056.46‬‬ ‫‪124.20‬‬ ‫‪186.30‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪124.20‬‬ ‫‪24.84‬‬ ‫‪398.06‬‬ ‫‪13,268.70‬‬ ‫‪5,402.70‬‬ ‫‪409.86‬‬ ‫‪8,197.20‬‬ ‫‪62.10‬‬ ‫‪12.42‬‬ ‫‪Earned Value‬‬
‫الشرقيون للتنمية العمرانية‬
‫االدارة الهندسية ‪ -‬المكتب الفني‬
‫مشروع ‪ /‬عمارة الكوربة‬

‫‪###‬‬ ‫أسعار األعمال المدنية لعمارة الكوربة‬


‫‪36,699.96‬‬ ‫‪244.96‬‬ ‫‪174.52‬‬ ‫‪282.71‬‬ ‫‪359.49‬‬ ‫‪53.23‬‬ ‫‪810.83‬‬ ‫‪15,554.57‬‬ ‫‪5,402.70‬‬ ‫‪13,172.97‬‬ ‫‪643.97‬‬ ‫‪Actual Cost‬‬
‫‪4,445.33-‬‬ ‫‪120.76-‬‬ ‫‪11.78‬‬ ‫‪282.71-‬‬ ‫‪359.49-‬‬ ‫‪70.97‬‬ ‫‪785.99-‬‬ ‫‪398.06‬‬ ‫‪2,285.87-‬‬ ‫‪-‬‬ ‫‪409.86‬‬ ‫‪4,975.77-‬‬ ‫‪581.87-‬‬ ‫‪Cost Variance‬‬
‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫بسكوت وسلك‬ ‫فرمجة‬ ‫بنود جديدة‬ ‫ونش‬ ‫اختبارات‬ ‫معالجة‬ ‫هالك حديد‬ ‫حديد‬ ‫مصنعيات‬ ‫هالك خرسانة‬ ‫خرسانة‬ ‫عمالة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬
‫‪2,728‬‬ ‫‪2,331.25‬‬ ‫‪10.00‬‬ ‫‪25.00‬‬ ‫‪75.00‬‬ ‫‪50.00‬‬ ‫‪2.00‬‬ ‫‪26.25‬‬ ‫‪875.00‬‬ ‫‪645.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪5.00‬‬ ‫م‪340.25 3‬‬ ‫االعمدة‬ ‫‪3.3.1‬‬
‫‪1,379,564.02‬‬ ‫‪56,126.52‬‬ ‫‪5,500.00‬‬ ‫‪13,750.00‬‬ ‫‪-‬‬ ‫‪41,250.00‬‬ ‫‪27,500.00‬‬ ‫‪1,100.00‬‬ ‫‪14,437.50‬‬ ‫‪481,250.00‬‬ ‫‪354,750.00‬‬ ‫‪18,150.00‬‬ ‫‪363,000.00‬‬ ‫‪2,750.00‬‬ ‫‪550.00‬‬ ‫‪BOQ Budget‬‬
‫‪1,820,701.84‬‬ ‫‪56,126.52‬‬ ‫‪7,333.30‬‬ ‫‪18,333.25‬‬ ‫‪-‬‬ ‫‪54,999.75‬‬ ‫‪36,666.50‬‬ ‫‪1,466.66‬‬ ‫‪19,249.91‬‬ ‫‪641,663.75‬‬ ‫‪472,997.85‬‬ ‫‪24,199.89‬‬ ‫‪483,997.80‬‬ ‫‪3,666.65‬‬ ‫‪733.33‬‬ ‫‪Invoice Budget‬‬
‫‪1,379,564.02‬‬ ‫‪56,126.52‬‬ ‫‪5,500.00‬‬ ‫‪13,750.00‬‬ ‫‪-‬‬ ‫‪41,250.00‬‬ ‫‪27,500.00‬‬ ‫‪1,100.00‬‬ ‫‪14,437.50‬‬ ‫‪481,250.00‬‬ ‫‪354,750.00‬‬ ‫‪18,150.00‬‬ ‫‪363,000.00‬‬ ‫‪2,750.00‬‬ ‫‪550.00‬‬ ‫‪Planned Value‬‬
‫‪1,820,701.84‬‬ ‫‪56,126.52‬‬ ‫‪7,333.30‬‬ ‫‪18,333.25‬‬ ‫‪-‬‬ ‫‪54,999.75‬‬ ‫‪36,666.50‬‬ ‫‪1,466.66‬‬ ‫‪19,249.91‬‬ ‫‪641,663.75‬‬ ‫‪472,997.85‬‬ ‫‪24,199.89‬‬ ‫‪483,997.80‬‬ ‫‪3,666.65‬‬ ‫‪733.33‬‬ ‫‪Earned Value‬‬
‫‪1,873,283.85‬‬ ‫‪24,470.00‬‬ ‫‪9,970.00‬‬ ‫‪-‬‬ ‫‪9,500.00‬‬ ‫‪2,887.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪405,471.00‬‬ ‫‪472,997.85‬‬ ‫‪864,028.00‬‬ ‫‪83,960.00‬‬ ‫‪Actual Cost‬‬
‫‪52,582.01-‬‬ ‫‪17,136.70-‬‬ ‫‪8,363.25‬‬ ‫‪-‬‬ ‫‪45,499.75‬‬ ‫‪33,779.50‬‬ ‫‪1,466.66‬‬ ‫‪19,249.91‬‬ ‫‪236,192.75‬‬ ‫‪-‬‬ ‫‪24,199.89‬‬ ‫‪380,030.20-‬‬ ‫‪80,293.35-‬‬ ‫‪Cost Variance‬‬
‫‪2,758‬‬ ‫‪2,357.00‬‬ ‫‪10.00‬‬ ‫‪25.00‬‬ ‫‪-‬‬ ‫‪50.00‬‬ ‫‪4.00‬‬ ‫‪27.00‬‬ ‫‪900.00‬‬ ‫‪645.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪3.00‬‬ ‫‪135.11‬‬ ‫م‪3‬‬ ‫الحوائط‬ ‫‪3.3.2‬‬
‫‪516,400.22‬‬ ‫‪21,430.22‬‬ ‫‪2,100.00‬‬ ‫‪5,250.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪10,500.00‬‬ ‫‪840.00‬‬ ‫‪5,670.00‬‬ ‫‪189,000.00‬‬ ‫‪135,450.00‬‬ ‫‪6,930.00‬‬ ‫‪138,600.00‬‬ ‫‪630.00‬‬ ‫‪210.00‬‬ ‫‪BOQ Budget‬‬
‫‪681,390.22‬‬ ‫‪21,430.22‬‬ ‫‪2,800.00‬‬ ‫‪7,000.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪14,000.00‬‬ ‫‪1,120.00‬‬ ‫‪7,560.00‬‬ ‫‪252,000.00‬‬ ‫‪180,600.00‬‬ ‫‪9,240.00‬‬ ‫‪184,800.00‬‬ ‫‪840.00‬‬ ‫‪280.00‬‬ ‫‪Invoice Budget‬‬
‫‪516,400.22‬‬ ‫‪21,430.22‬‬ ‫‪2,100.00‬‬ ‫‪5,250.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪10,500.00‬‬ ‫‪840.00‬‬ ‫‪5,670.00‬‬ ‫‪189,000.00‬‬ ‫‪135,450.00‬‬ ‫‪6,930.00‬‬ ‫‪138,600.00‬‬ ‫‪630.00‬‬ ‫‪210.00‬‬ ‫‪Planned Value‬‬
‫‪681,390.22‬‬ ‫‪21,430.22‬‬ ‫‪2,800.00‬‬ ‫‪7,000.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪14,000.00‬‬ ‫‪1,120.00‬‬ ‫‪7,560.00‬‬ ‫‪252,000.00‬‬ ‫‪180,600.00‬‬ ‫‪9,240.00‬‬ ‫‪184,800.00‬‬ ‫‪840.00‬‬ ‫‪280.00‬‬ ‫‪Earned Value‬‬
‫‪180,600.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪180,600.00‬‬ ‫‪-‬‬ ‫‪Actual Cost‬‬
‫‪500,790.22‬‬ ‫‪2,800.00‬‬ ‫‪7,000.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪14,000.00‬‬ ‫‪1,120.00‬‬ ‫‪7,560.00‬‬ ‫‪252,000.00‬‬ ‫‪-‬‬ ‫‪9,240.00‬‬ ‫‪184,800.00‬‬ ‫‪840.00‬‬ ‫‪Cost Variance‬‬
‫‪2,458‬‬ ‫‪2,101.00‬‬ ‫‪10.00‬‬ ‫‪10.00‬‬ ‫‪25.00‬‬ ‫‪15.00‬‬ ‫‪2.00‬‬ ‫‪21.00‬‬ ‫‪700.00‬‬ ‫‪645.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪5.00‬‬ ‫‪1,962.00‬‬ ‫م‪3‬‬ ‫البالطات‬ ‫‪3.3.3‬‬
‫‪5,570,121.72‬‬ ‫‪255,121.72‬‬ ‫‪25,000.00‬‬ ‫‪25,000.00‬‬ ‫‪-‬‬ ‫‪62,500.00‬‬ ‫‪37,500.00‬‬ ‫‪5,000.00‬‬ ‫‪52,500.00‬‬ ‫‪1,750,000.00‬‬ ‫‪1,612,500.00‬‬ ‫‪82,500.00‬‬ ‫‪1,650,000.00‬‬ ‫‪12,500.00‬‬ ‫‪2,500.00‬‬ ‫‪BOQ Budget‬‬
‫‪7,341,788.39‬‬ ‫‪255,121.72‬‬ ‫‪33,333.33‬‬ ‫‪33,333.33‬‬ ‫‪-‬‬ ‫‪83,333.33‬‬ ‫‪50,000.00‬‬ ‫‪6,666.67‬‬ ‫‪70,000.00‬‬ ‫‪2,333,333.33‬‬ ‫‪2,150,000.00‬‬ ‫‪110,000.00‬‬ ‫‪2,200,000.00‬‬ ‫‪16,666.67‬‬ ‫‪3,333.33‬‬ ‫‪Invoice Budget‬‬
‫‪5,570,121.72‬‬ ‫‪255,121.72‬‬ ‫‪25,000.00‬‬ ‫‪25,000.00‬‬ ‫‪-‬‬ ‫‪62,500.00‬‬ ‫‪37,500.00‬‬ ‫‪5,000.00‬‬ ‫‪52,500.00‬‬ ‫‪1,750,000.00‬‬ ‫‪1,612,500.00‬‬ ‫‪82,500.00‬‬ ‫‪1,650,000.00‬‬ ‫‪12,500.00‬‬ ‫‪2,500.00‬‬ ‫‪Planned Value‬‬
‫‪7,341,788.39‬‬ ‫‪255,121.72‬‬ ‫‪33,333.33‬‬ ‫‪33,333.33‬‬ ‫‪-‬‬ ‫‪83,333.33‬‬ ‫‪50,000.00‬‬ ‫‪6,666.67‬‬ ‫‪70,000.00‬‬ ‫‪2,333,333.33‬‬ ‫‪2,150,000.00‬‬ ‫‪110,000.00‬‬ ‫‪2,200,000.00‬‬ ‫‪16,666.67‬‬ ‫‪3,333.33‬‬ ‫‪Earned Value‬‬
‫‪2,150,000.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,150,000.00‬‬ ‫‪-‬‬ ‫‪Actual Cost‬‬
‫‪5,191,788.39‬‬ ‫‪33,333.33‬‬ ‫‪33,333.33‬‬ ‫‪-‬‬ ‫‪83,333.33‬‬ ‫‪50,000.00‬‬ ‫‪6,666.67‬‬ ‫‪70,000.00‬‬ ‫‪2,333,333.33‬‬ ‫‪-‬‬ ‫‪110,000.00‬‬ ‫‪2,200,000.00‬‬ ‫‪16,666.67‬‬ ‫‪Cost Variance‬‬
‫‪2,361‬‬ ‫‪2,018.25‬‬ ‫‪10.00‬‬ ‫‪10.00‬‬ ‫‪-‬‬ ‫‪15.00‬‬ ‫‪2.00‬‬ ‫‪23.25‬‬ ‫‪775.00‬‬ ‫‪485.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪5.00‬‬ ‫‪69.74‬‬ ‫م‪3‬‬ ‫الكمرات‬ ‫‪3.3.4‬‬
‫‪295,821.33‬‬ ‫‪13,266.33‬‬ ‫‪1,400.00‬‬ ‫‪1,400.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,100.00‬‬ ‫‪280.00‬‬ ‫‪3,255.00‬‬ ‫‪108,500.00‬‬ ‫‪67,900.00‬‬ ‫‪4,620.00‬‬ ‫‪92,400.00‬‬ ‫‪700.00‬‬ ‫‪140.00‬‬ ‫‪BOQ Budget‬‬
‫‪363,096.33‬‬ ‫‪13,266.33‬‬ ‫‪1,733.33‬‬ ‫‪1,733.33‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,600.00‬‬ ‫‪346.67‬‬ ‫‪4,030.00‬‬ ‫‪134,333.33‬‬ ‫‪84,066.67‬‬ ‫‪5,720.00‬‬ ‫‪114,400.00‬‬ ‫‪866.67‬‬ ‫‪173.33‬‬ ‫‪Invoice Budget‬‬
‫‪295,821.33‬‬ ‫‪13,266.33‬‬ ‫‪1,400.00‬‬ ‫‪1,400.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,100.00‬‬ ‫‪280.00‬‬ ‫‪3,255.00‬‬ ‫‪108,500.00‬‬ ‫‪67,900.00‬‬ ‫‪4,620.00‬‬ ‫‪92,400.00‬‬ ‫‪700.00‬‬ ‫‪140.00‬‬ ‫‪Planned Value‬‬
‫‪363,096.33‬‬ ‫‪13,266.33‬‬ ‫‪1,733.33‬‬ ‫‪1,733.33‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,600.00‬‬ ‫‪346.67‬‬ ‫‪4,030.00‬‬ ‫‪134,333.33‬‬ ‫‪84,066.67‬‬ ‫‪5,720.00‬‬ ‫‪114,400.00‬‬ ‫‪866.67‬‬ ‫‪173.33‬‬ ‫‪Earned Value‬‬
‫‪84,066.67‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪84,066.67‬‬ ‫‪-‬‬ ‫‪Actual Cost‬‬
‫‪279,029.66‬‬ ‫‪1,733.33‬‬ ‫‪1,733.33‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,600.00‬‬ ‫‪346.67‬‬ ‫‪4,030.00‬‬ ‫‪134,333.33‬‬ ‫‪-‬‬ ‫‪5,720.00‬‬ ‫‪114,400.00‬‬ ‫‪866.67‬‬ ‫‪Cost Variance‬‬
‫‪2,339‬‬ ‫‪1,999.00‬‬ ‫‪10.00‬‬ ‫‪15.00‬‬ ‫‪-‬‬ ‫‪15.00‬‬ ‫‪2.00‬‬ ‫‪24.00‬‬ ‫‪800.00‬‬ ‫‪435.00‬‬ ‫‪33.00‬‬ ‫‪660.00‬‬ ‫‪5.00‬‬ ‫‪67.50‬‬ ‫م‪3‬‬ ‫الساللم‬ ‫‪3.3.5‬‬
‫‪252,125.84‬‬ ‫‪12,245.84‬‬ ‫‪1,200.00‬‬ ‫‪1,800.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,800.00‬‬ ‫‪240.00‬‬ ‫‪2,880.00‬‬ ‫‪96,000.00‬‬ ‫‪52,200.00‬‬ ‫‪3,960.00‬‬ ‫‪79,200.00‬‬ ‫‪600.00‬‬ ‫‪120.00‬‬ ‫‪BOQ Budget‬‬
‫‪332,085.84‬‬ ‫‪12,245.84‬‬ ‫‪1,600.00‬‬ ‫‪2,400.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,400.00‬‬ ‫‪320.00‬‬ ‫‪3,840.00‬‬ ‫‪128,000.00‬‬ ‫‪69,600.00‬‬ ‫‪5,280.00‬‬ ‫‪105,600.00‬‬ ‫‪800.00‬‬ ‫‪160.00‬‬ ‫‪Invoice Budget‬‬
‫‪252,125.84‬‬ ‫‪12,245.84‬‬ ‫‪1,200.00‬‬ ‫‪1,800.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,800.00‬‬ ‫‪240.00‬‬ ‫‪2,880.00‬‬ ‫‪96,000.00‬‬ ‫‪52,200.00‬‬ ‫‪3,960.00‬‬ ‫‪79,200.00‬‬ ‫‪600.00‬‬ ‫‪120.00‬‬ ‫‪Planned Value‬‬
‫‪332,085.84‬‬ ‫‪12,245.84‬‬ ‫‪1,600.00‬‬ ‫‪2,400.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,400.00‬‬ ‫‪320.00‬‬ ‫‪3,840.00‬‬ ‫‪128,000.00‬‬ ‫‪69,600.00‬‬ ‫‪5,280.00‬‬ ‫‪105,600.00‬‬ ‫‪800.00‬‬ ‫‪160.00‬‬ ‫‪Earned Value‬‬
‫‪69,600.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪69,600.00‬‬ ‫‪-‬‬ ‫المكعب توريد وصب خرسانة رغوية ذات‬‫بالمتر‪Actual‬‬
‫‪Cost‬‬
‫‪262,485.84‬‬ ‫‪1,600.00‬‬ ‫‪2,400.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪2,400.00‬‬ ‫‪320.00‬‬ ‫‪3,840.00‬‬ ‫‪128,000.00‬‬ ‫‪-‬‬ ‫‪5,280.00‬‬ ‫‪105,600.00‬‬ ‫‪800.00‬‬ ‫)‪ (Fcu = 15 MPa‬كثافة منخفضة‬ ‫لملء‬
‫‪Cost‬‬ ‫وذلك‬
‫‪Variance‬‬
‫الفراغات باالماكن المحددة أسفل العناصر‬
‫‪471.00‬‬ ‫‪5.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪160.00‬‬ ‫‪-‬‬ ‫‪300.00‬‬ ‫‪3.00‬‬ ‫‪40.00‬‬ ‫م‪3‬‬ ‫‪ CHECK SUMM‬االنشائية لجسم حمامات السباحة ‪،‬و مكونة من‬
‫‪551‬‬ ‫الخلطة المصممة التي يعتمدها المهندس‬
‫االستشاري قبل الصب‪ ،‬والفئه تشمل اإلضافات‬
‫‪18,840.00‬‬ ‫‪-‬‬ ‫‪200.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪120.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪6,400.00‬‬ ‫‪-‬‬ ‫‪12,000.00‬‬ ‫‪120.00‬‬ ‫‪40.00‬‬ ‫‪Budget‬و‪BOQ‬‬
‫الصب و ذلك طبقا للمواصفات وتعليمات‬ ‫والخلط‬
‫‪18,840.00‬‬ ‫‪-‬‬ ‫‪200.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪120.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪6,400.00‬‬ ‫‪-‬‬ ‫‪12,000.00‬‬ ‫‪120.00‬‬ ‫‪40.00‬‬ ‫‪Invoice‬‬
‫اإلستشاري و أصول الصناعة‬ ‫‪. Budget‬‬
‫‪18,840.00‬‬ ‫‪-‬‬ ‫‪200.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪120.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪6,400.00‬‬ ‫‪-‬‬ ‫‪12,000.00‬‬ ‫‪120.00‬‬ ‫‪40.00‬‬ ‫‪Planned Value‬‬
‫‪18,840.00‬‬ ‫‪-‬‬ ‫‪200.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪120.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪6,400.00‬‬ ‫‪-‬‬ ‫‪12,000.00‬‬ ‫‪120.00‬‬ ‫‪40.00‬‬ ‫‪Earned Value‬‬
‫‪25,145.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,645.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪23,500.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪Actual Cost‬‬
‫‪6,305.00-‬‬ ‫‪200.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,645.00-‬‬ ‫‪-‬‬ ‫‪120.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪17,100.00-‬‬ ‫‪-‬‬ ‫‪12,000.00‬‬ ‫‪120.00‬‬ ‫‪Cost Variance‬‬

‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫‪-‬‬ ‫‪-‬‬ ‫عمال‬ ‫‪VO Cost‬‬ ‫تشوين‬ ‫نقل مخلفات‬ ‫مصنعيات‬ ‫هادر طوب‬ ‫الطوب يالنقل‬ ‫اشاير حديد‬ ‫هدر مونة‬ ‫المونة‬ ‫الكمية‬ ‫الوحدة‬ ‫البند‬

‫‪126.94‬‬ ‫‪7.938‬‬ ‫‪6.00‬‬ ‫‪20.60‬‬ ‫‪6.40‬‬ ‫‪64.40‬‬ ‫‪4.00‬‬ ‫‪1.60‬‬ ‫‪16.00‬‬ ‫م‬
‫‪2‬‬
‫مباني سمك ‪ 12‬سم‬
‫‪572,490.38‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪35,800.38‬‬ ‫‪27,060.00‬‬ ‫‪92,906.00‬‬ ‫‪28,864.00‬‬ ‫‪290,444.00‬‬ ‫‪18,040.00‬‬ ‫‪7,216.00‬‬ ‫‪72,160.00‬‬ ‫‪4,510.00‬‬ ‫‪BOQ Budget‬‬
‫‪106,120.17‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪6,636.17‬‬ ‫‪5,016.00‬‬ ‫‪17,221.60‬‬ ‫‪5,350.40‬‬ ‫‪53,838.40‬‬ ‫‪3,344.00‬‬ ‫‪1,337.60‬‬ ‫‪13,376.00‬‬ ‫‪836.00‬‬ ‫‪Invoice Budget‬‬
‫‪572,490.38‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪35,800.38‬‬ ‫‪27,060.00‬‬ ‫‪92,906.00‬‬ ‫‪28,864.00‬‬ ‫‪290,444.00‬‬ ‫‪18,040.00‬‬ ‫‪7,216.00‬‬ ‫‪72,160.00‬‬ ‫‪4,510.00‬‬ ‫‪Planned Value‬‬
‫‪106,120.17‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪6,636.17‬‬ ‫‪5,016.00‬‬ ‫‪17,221.60‬‬ ‫‪5,350.40‬‬ ‫‪53,838.40‬‬ ‫‪3,344.00‬‬ ‫‪1,337.60‬‬ ‫‪13,376.00‬‬ ‫‪836.00‬‬ ‫‪Earned Value‬‬
‫‪112‬‬ ‫‪122,500.00‬‬ ‫‪6,840.00‬‬ ‫‪-‬‬ ‫‪24,000.00‬‬ ‫‪58,660.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪33,000.00‬‬ ‫‪Actual Cost‬‬
‫‪16,379.83-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪203.83-‬‬ ‫‪5,016.00‬‬ ‫‪6,778.40-‬‬ ‫‪5,350.40‬‬ ‫‪4,821.60-‬‬ ‫‪3,344.00‬‬ ‫‪1,337.60‬‬ ‫‪19,624.00-‬‬ ‫‪Cost Variance‬‬
‫‪282‬‬ ‫‪241.23‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪15.59‬‬ ‫‪4.00‬‬ ‫‪41.16‬‬ ‫‪12.88‬‬ ‫‪128.80‬‬ ‫‪8.00‬‬ ‫‪2.80‬‬ ‫‪28.00‬‬ ‫‪2‬‬
‫م‬ ‫سمك ‪ 25‬سم‬ ‫‪4.1.2‬‬
‫‪1,780,295.85‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪115,072.65‬‬ ‫‪29,520.00‬‬ ‫‪303,760.80‬‬ ‫‪95,054.40‬‬ ‫‪950,544.00‬‬ ‫‪59,040.00‬‬ ‫‪20,664.00‬‬ ‫‪206,640.00‬‬ ‫‪7,380.00‬‬ ‫‪BOQ Budget CHECK‬‬
‫‪1,780,295.85‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪115,072.65‬‬ ‫‪29,520.00‬‬ ‫‪303,760.80‬‬ ‫‪95,054.40‬‬ ‫‪950,544.00‬‬ ‫‪59,040.00‬‬ ‫‪20,664.00‬‬ ‫‪206,640.00‬‬ ‫‪7,380.00‬‬ ‫‪Invoice Budget SUMMARY‬‬
‫‪1,780,295.85‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪115,072.65‬‬ ‫‪29,520.00‬‬ ‫‪303,760.80‬‬ ‫‪95,054.40‬‬ ‫‪950,544.00‬‬ ‫‪59,040.00‬‬ ‫‪20,664.00‬‬ ‫‪206,640.00‬‬ ‫‪7,380.00‬‬ ‫‪Planned Value‬‬
‫‪1,780,295.85‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪115,072.65‬‬ ‫‪29,520.00‬‬ ‫‪303,760.80‬‬ ‫‪95,054.40‬‬ ‫‪950,544.00‬‬ ‫‪59,040.00‬‬ ‫‪20,664.00‬‬ ‫‪206,640.00‬‬ ‫‪7,380.00‬‬ ‫‪Earned Value‬‬
‫‪122,500.00‬‬ ‫‪6,840.00‬‬ ‫‪-‬‬ ‫‪24,000.00‬‬ ‫‪58,660.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪33,000.00‬‬ ‫‪Actual Cost‬‬
‫‪1,657,795.85‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪108,232.65‬‬ ‫‪29,520.00‬‬ ‫‪279,760.80‬‬ ‫‪95,054.40‬‬ ‫‪891,884.00‬‬ ‫‪59,040.00‬‬ ‫‪20,664.00‬‬ ‫‪173,640.00‬‬ ‫‪Cost Variance‬‬

‫إجمالي التكلفة‬ ‫توريد وتركيب‬ ‫عمال‬ ‫مستحلب‬ ‫طبقتين لياسة‬ ‫خرسانة ميول‬ ‫معالجة تعشيش‬ ‫عمالة‬ ‫مصنعيات‬ ‫هدر‬ ‫توريد‬ ‫الكمية‬ ‫البند‬
‫‪VOS Price‬‬ ‫‪-‬‬ ‫‪VO Cost‬‬ ‫بيتوميني‬

‫‪95.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪9.00‬‬ ‫‪27.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3.00‬‬ ‫‪28.00‬‬ ‫‪-‬‬ ‫‪28.00‬‬ ‫لزوم األسطح األفقية للبشة والبند يشمل توريد وعمل‬
‫م‬
‫‪2‬‬
‫طبقة لياسة أسمنتية بسمك ‪30‬مم‬

‫‪172,330.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪16,326.00‬‬ ‫‪48,978.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,442.00‬‬ ‫‪50,792.00‬‬ ‫‪-‬‬ ‫‪50,792.00‬‬ ‫‪1,814.00‬‬ ‫‪BOQ Budget‬‬
‫‪175,437.45‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪16,620.39‬‬ ‫‪49,861.17‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,540.13‬‬ ‫‪51,707.88‬‬ ‫‪-‬‬ ‫‪51,707.88‬‬ ‫‪1,846.71‬‬ ‫‪Invoice Budget‬‬
‫‪172,330.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪16,326.00‬‬ ‫‪48,978.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,442.00‬‬ ‫‪50,792.00‬‬ ‫‪-‬‬ ‫‪50,792.00‬‬ ‫‪1,814.00‬‬ ‫‪Planned Value‬‬
‫‪175,437.45‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪16,620.39‬‬ ‫‪49,861.17‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,540.13‬‬ ‫‪51,707.88‬‬ ‫‪-‬‬ ‫‪51,707.88‬‬ ‫‪1,846.71‬‬ ‫‪Earned Value‬‬
‫‪111‬‬ ‫‪107,403.00‬‬ ‫‪-‬‬ ‫‪107,403.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪Actual Cost‬‬
‫‪68,034.45‬‬ ‫‪-‬‬ ‫‪107,403.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪16,620.39‬‬ ‫‪49,861.17‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,540.13‬‬ ‫‪51,707.88‬‬ ‫‪-‬‬ ‫‪51,707.88‬‬ ‫‪Cost Variance‬‬

‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫‪-‬‬ ‫توريد وتركيب‬ ‫بنود جديدة‬ ‫‪VO Cost‬‬ ‫مستحلب‬ ‫طبقتين لياسة‬ ‫خرسانة ميول‬ ‫معالجة تعشيش‬ ‫عمالة‬ ‫مصنعيات‬ ‫هدر‬ ‫توريد‬ ‫الكمية‬ ‫البند‬
‫بيتوميني‬
‫‪7.2‬‬
‫لزوم أسطح الحوائط الخرسانية الرأسية ‪ ،‬والفئة‬
‫‪96.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪9.00‬‬ ‫‪28.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3.00‬‬ ‫‪28.00‬‬ ‫‪-‬‬ ‫‪28.00‬‬ ‫تشمل اعداد وتسوية األسطح الستقبال العزل وجميع‬
‫األعمال الالزمة‬

‫‪127,104.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪11,916.00‬‬ ‫‪37,072.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3,972.00‬‬ ‫‪37,072.00‬‬ ‫‪-‬‬ ‫‪37,072.00‬‬ ‫‪1,324.00‬‬ ‫‪BOQ Budget‬‬
‫‪138,148.80‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪12,951.45‬‬ ‫‪40,293.40‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪4,317.15‬‬ ‫‪40,293.40‬‬ ‫‪-‬‬ ‫‪40,293.40‬‬ ‫‪1,439.05‬‬ ‫‪Invoice Budget‬‬
‫‪127,104.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪11,916.00‬‬ ‫‪37,072.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3,972.00‬‬ ‫‪37,072.00‬‬ ‫‪-‬‬ ‫‪37,072.00‬‬ ‫‪1,324.00‬‬ ‫‪Planned Value‬‬
‫‪138,148.80‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪12,951.45‬‬ ‫‪40,293.40‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪4,317.15‬‬ ‫‪40,293.40‬‬ ‫‪-‬‬ ‫‪40,293.40‬‬ ‫‪1,439.05‬‬ ‫‪Earned Value‬‬
‫‪112‬‬ ‫‪100,000.00‬‬ ‫‪-‬‬ ‫‪100,000.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪Actual Cost‬‬
‫‪38,148.80‬‬ ‫‪-‬‬ ‫‪100,000.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪12,951.45‬‬ ‫‪40,293.40‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪4,317.15‬‬ ‫‪40,293.40‬‬ ‫‪-‬‬ ‫‪40,293.40‬‬ ‫‪Cost Variance‬‬
‫الشرقيون للتنمية العمرانية‬
‫االدارة الهندسية ‪ -‬المكتب الفني‬
‫مشروع ‪ /‬عمارة الكوربة‬

‫‪###‬‬ ‫أسعار األعمال المدنية لعمارة الكوربة‬


‫توريد ودهان عدد وجهين (غير كاشفين ) من‬
‫البيتومين المؤكسد الساخن (مستحلب بيتوميني) وذلك‬
‫لالسطح العلوية للبشة المسلحة والفئة تشمل اعداد‬
‫‪54.79‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1.00‬‬ ‫‪2.65‬‬ ‫‪12.00‬‬ ‫‪1.14‬‬ ‫‪38.00‬‬ ‫‪1,760.00‬‬ ‫م‪2‬‬
‫األسطح للدهان وملء أي فجوات وتنظيف األسطح ‪،‬‬
‫علي أن يتم عمل العزل طبقاً لتعليمات الجهه المصنعة‬
‫‪.‬وطبقاً للمواصفات وتعليمات اإلستشاري‬

‫‪96,430.40‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,760.00‬‬ ‫‪4,664.00‬‬ ‫‪21,120.00‬‬ ‫‪2,006.40‬‬ ‫‪66,880.00‬‬ ‫‪1,760.00‬‬ ‫‪BOQ Budget‬‬
‫‪96,430.40‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,760.00‬‬ ‫‪4,664.00‬‬ ‫‪21,120.00‬‬ ‫‪2,006.40‬‬ ‫‪66,880.00‬‬ ‫‪1,760.00‬‬ ‫‪Invoice Budget‬‬
‫‪96,430.40‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,760.00‬‬ ‫‪4,664.00‬‬ ‫‪21,120.00‬‬ ‫‪2,006.40‬‬ ‫‪66,880.00‬‬ ‫‪1,760.00‬‬ ‫‪Planned Value‬‬
‫‪96,430.40‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,760.00‬‬ ‫‪4,664.00‬‬ ‫‪21,120.00‬‬ ‫‪2,006.40‬‬ ‫‪66,880.00‬‬ ‫‪1,760.00‬‬ ‫‪Earned Value‬‬
‫‪100,000.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪100,000.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪Actual Cost‬‬
‫‪3,569.60-‬‬ ‫‪-‬‬ ‫‪100,000.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,760.00‬‬ ‫‪4,664.00‬‬ ‫‪21,120.00‬‬ ‫‪2,006.40‬‬ ‫‪66,880.00‬‬ ‫‪Cost Variance‬‬
‫لزوم األسطح األفقية لبالطة سقف البدروم (‪، )1‬‬ ‫‪7.2.1‬‬
‫‪191‬‬ ‫‪163.03‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪88.00‬‬ ‫‪-‬‬ ‫‪2.70‬‬ ‫‪35.00‬‬ ‫‪1.78‬‬ ‫‪35.56‬‬ ‫‪600.00‬‬ ‫م‪2‬‬ ‫والبند يشمل توريد وعمل خرسانة ميول بمتوسط‬
‫‪.‬سمك ‪ 70‬مم‬
‫‪97,820.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪52,800.00‬‬ ‫‪-‬‬ ‫‪1,620.00‬‬ ‫‪21,000.00‬‬ ‫‪1,066.67‬‬ ‫‪21,333.33‬‬ ‫‪600.00‬‬ ‫‪BOQ Budget‬‬
‫‪97,820.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪52,800.00‬‬ ‫‪-‬‬ ‫‪1,620.00‬‬ ‫‪21,000.00‬‬ ‫‪1,066.67‬‬ ‫‪21,333.33‬‬ ‫‪600.00‬‬ ‫‪Invoice Budget‬‬
‫‪97,820.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪52,800.00‬‬ ‫‪-‬‬ ‫‪1,620.00‬‬ ‫‪21,000.00‬‬ ‫‪1,066.67‬‬ ‫‪21,333.33‬‬ ‫‪600.00‬‬ ‫‪Planned Value‬‬
‫‪97,820.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪52,800.00‬‬ ‫‪-‬‬ ‫‪1,620.00‬‬ ‫‪21,000.00‬‬ ‫‪1,066.67‬‬ ‫‪21,333.33‬‬ ‫‪600.00‬‬ ‫‪Earned Value‬‬
‫‪100,000.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪100,000.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪Actual Cost‬‬
‫‪2,180.00-‬‬ ‫‪-‬‬ ‫‪100,000.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪52,800.00‬‬ ‫‪-‬‬ ‫‪1,620.00‬‬ ‫‪21,000.00‬‬ ‫‪1,066.67‬‬ ‫‪21,333.33‬‬ ‫‪Cost Variance‬‬
‫مستحلب‬
‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫‪-‬‬ ‫توريد وتركيب‬ ‫بنود جديدة‬ ‫‪VO Cost‬‬ ‫بيتوميني‬ ‫طبقتين لياسة‬ ‫خرسانة ميول‬ ‫معالجة تعشيش‬ ‫عمالة‬ ‫مصنعيات‬ ‫هدر‬ ‫توريد‬ ‫الكمية‬ ‫البند‬

‫توريد وتثبيت ألواح من الكرتونال مقاس‬


‫‪33.02‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪12.50‬‬ ‫‪-‬‬ ‫‪20.52‬‬ ‫‪2‬‬
‫م‬ ‫‪3 ×2000×1000‬مم أو بالمقاسات المتوفرة‬
‫بالسوق المصري‬

‫‪43,718.48‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪16,550.00‬‬ ‫‪-‬‬ ‫‪27,168.48‬‬ ‫‪1,324.00‬‬ ‫‪BOQ Budget‬‬
‫‪47,517.43‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪17,988.13‬‬ ‫‪-‬‬ ‫‪29,529.31‬‬ ‫‪1,439.05‬‬ ‫‪Invoice Budget‬‬
‫‪43,718.48‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪16,550.00‬‬ ‫‪-‬‬ ‫‪27,168.48‬‬ ‫‪1,324.00‬‬ ‫‪Planned Value‬‬
‫‪47,517.43‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪17,988.13‬‬ ‫‪-‬‬ ‫‪29,529.31‬‬ ‫‪1,439.05‬‬ ‫‪Earned Value‬‬
‫‪39‬‬ ‫‪47,970.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪13,150.00‬‬ ‫‪-‬‬ ‫‪34,820.00‬‬ ‫‪Actual Cost‬‬
‫‪452.57-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪4,838.13‬‬ ‫‪-‬‬ ‫‪5,290.69-‬‬ ‫‪Cost Variance‬‬
‫كالبند رقم (‪ ، )7.2‬ولكن توريد وتركيب نظام‬ ‫‪-‬‬
‫لزوم اللبشة المسلحة ‪ PVC‬عزل من ألواح الـ‬
‫‪246‬‬ ‫‪210.00‬‬ ‫‪210.00‬‬ ‫‪-‬‬ ‫م‪2‬‬ ‫‪ (PVC Compartment‬والحوائط الساندة‬
‫لزوم عمل طبقة عازلة خارجية ) ‪System‬‬
‫اسفل اللبشات المسلحة وعلي الحوائط المسلحة‬
‫يحددها‬‫الحرارة‬
‫أماكنمنأخري‬
‫الوقاية‬
‫أعمالوأي‬‫الخارج‬‫السابع ‪-‬‬ ‫الباب‬
‫الساندة من‬
‫‪.‬والرطوبةأو توصيات الشركة المنتجة‪ .‬يركب‬ ‫المهندس‬
‫مقاول‬
‫طريقالتسرب‬ ‫عنلمنع‬‫المنتجةسي‬
‫الشركة بي في‬
‫لتعليماتمن ماده‬
‫فواصل مرنه‬‫طبقاً‬ ‫‪7.4‬‬
‫‪(Water‬والفئة تشمل ألواح الـ‬ ‫متخصص‪،‬‬ ‫و)‪stopper‬‬
‫‪PVC‬‬
‫طبقات الحماية وجميع االكسسوارات من مواسير‬
‫سي‬ ‫في‬ ‫بي‬ ‫ماده‬ ‫من‬ ‫مرنه‬ ‫فواصل‬
‫حقن و صمامات و وترستوب لزوم تنفيذ النظام‬ ‫وتثبيت‬ ‫توريد‬
‫الساندة‬
‫الوصالت‬ ‫الخرسانية‬ ‫الحوائط‬
‫اللحامات و‬ ‫لزوماختبار‬ ‫تشملممأيضاً‬
‫بارتفاع‪250‬‬
‫و الفئة‬
‫مستحلب‬
‫وعملالنحو‬ ‫التثبيت‬
‫البند علي‬ ‫تشمل‬
‫لتنفيذ‬ ‫األعمالوالفئة‬
‫الالزمة‬ ‫وكافةيماثلها ‪،‬‬
‫وما‬
‫‪VOS Price‬‬ ‫إجمالي التكلفة‬ ‫‪-‬‬ ‫توريد وتركيب‬ ‫بنود جديدة‬ ‫‪VO Cost‬‬ ‫بيتوميني‬ ‫طبقتين لياسة‬ ‫خرسانة ميول‬ ‫معالجة تعشيش‬ ‫عمالة‬ ‫مصنعيات‬ ‫هدر‬ ‫توريد‬ ‫الكمية‬ ‫طبقاًو‬ ‫اإلكسسوارات وذلك‬
‫المشروع‬ ‫لتعليمات البند‬
‫استشارى‬ ‫طبقاوجميع‬‫الوصالت‬
‫األكمل‬
‫الشركه‬
‫وتعليمات عمل‬
‫والفئة تشمل‬‫التعاقد‬ ‫ومستندات‬
‫المنتجة‪،‬‬ ‫الشركة‬ ‫للرسومات‬
‫تعليمات‬
‫‪181‬‬ ‫‪154.66‬‬ ‫‪77.33‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪9.50‬‬ ‫‪3.23‬‬ ‫‪64.60‬‬ ‫م ‪.‬ط‬ ‫بتقديم عينة‬ ‫‪7.4.1‬‬
‫ضمان للعزل‬ ‫المقاولشهادة‬
‫يقومالمياه‬
‫وتقديم‬ ‫علي ان‬
‫خزانات‬
‫المطلوبة‬ ‫المنتجة‬
‫حوائط‬ ‫لزوم‬
‫األختبارات‬
‫‪7,423.68‬‬ ‫‪-‬‬ ‫‪3,711.84‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪456.00‬‬ ‫‪155.04‬‬ ‫‪3,100.80‬‬ ‫‪48.00‬‬ ‫صالحية‬‫للمهندس‬
‫شهادة‬‫الورشه‬
‫رسوماتوكذلك‬
‫المتخصص‬ ‫ويقدم‬
‫‪BOQ‬‬ ‫لالعتماد‬
‫‪Budget‬‬
‫المقاول‬ ‫من‬
‫‪10,375.06‬‬ ‫‪-‬‬ ‫‪5,187.53‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪637.29‬‬ ‫‪216.68‬‬ ‫‪4,333.56‬‬ ‫‪67.08‬‬ ‫التنفيذ‬
‫المنتجة‬‫الشركةفي‬
‫البدء‬ ‫قبل‬
‫‪.‬لإلعتمادمن‬
‫‪Invoice‬‬ ‫‪Budget‬‬
‫‪.‬واختبار‬
‫‪7,423.68‬‬ ‫‪3,711.84‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪456.00‬‬ ‫‪155.04‬‬ ‫‪3,100.80‬‬ ‫‪48.00‬‬ ‫‪Planned Value‬‬
‫‪10,375.06‬‬ ‫‪5,187.53‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪637.29‬‬ ‫‪216.68‬‬ ‫‪4,333.56‬‬ ‫‪67.08‬‬ ‫‪Earned Value‬‬
‫‪90‬‬ ‫‪22,800.00‬‬ ‫‪22,800.00‬‬ ‫‪Actual Cost‬‬
‫‪12,424.94-‬‬ ‫‪5,187.53‬‬ ‫‪22,800.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪637.29‬‬ ‫‪216.68‬‬ ‫‪4,333.56‬‬ ‫‪Cost Variance‬‬

‫إجمالي التكلفة‬ ‫توريد وتركيب‬ ‫بنود جديدة‬ ‫مستحلب‬ ‫طبقتين لياسة‬ ‫خرسانة ميول‬ ‫معالجة تعشيش‬ ‫عمالة‬ ‫مصنعيات‬ ‫هدر‬ ‫توريد‬ ‫الكمية‬ ‫البند‬
‫‪VOS Price‬‬ ‫‪-‬‬ ‫‪VO Cost‬‬ ‫بيتوميني‬
‫‪181‬‬ ‫‪154.66‬‬ ‫‪77.33‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪9.50‬‬ ‫‪3.23‬‬ ‫‪64.60‬‬ ‫م ‪.‬ط‬ ‫لزوم حوائط البدروم‬ ‫‪7.4.2‬‬
‫‪52,584.40‬‬ ‫‪-‬‬ ‫‪26,292.20‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3,230.00‬‬ ‫‪1,098.20‬‬ ‫‪21,964.00‬‬ ‫‪340.00‬‬ ‫‪BOQ Budget‬‬
‫‪23,995.50‬‬ ‫‪-‬‬ ‫‪11,997.75‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,473.93‬‬ ‫‪501.13‬‬ ‫‪10,022.69‬‬ ‫‪155.15‬‬ ‫‪Invoice Budget‬‬
‫‪52,584.40‬‬ ‫‪26,292.20‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3,230.00‬‬ ‫‪1,098.20‬‬ ‫‪21,964.00‬‬ ‫‪340.00‬‬ ‫‪Planned Value‬‬
‫‪23,995.50‬‬ ‫‪11,997.75‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,473.93‬‬ ‫‪501.13‬‬ ‫‪10,022.69‬‬ ‫‪155.15‬‬ ‫‪Earned Value‬‬
‫‪90‬‬ ‫‪44,575.00‬‬ ‫‪44,575.00‬‬ ‫‪Actual Cost‬‬
‫‪20,579.50-‬‬ ‫‪11,997.75‬‬ ‫‪44,575.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,473.93‬‬ ‫‪501.13‬‬ ‫‪10,022.69‬‬ ‫‪Cost Variance‬‬
‫‪90‬‬ ‫‪77.33‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪9.50‬‬ ‫‪3.23‬‬ ‫‪64.60‬‬ ‫‪94.00‬‬ ‫م‪.‬ط‬ ‫لزوم حوائط حمامات السباحة‬ ‫‪7.4.3‬‬
‫‪7,269.02‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪893.00‬‬ ‫‪303.62‬‬ ‫‪6,072.40‬‬ ‫‪94.00‬‬ ‫‪BOQ Budget‬‬
‫‪7,269.02‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪893.00‬‬ ‫‪303.62‬‬ ‫‪6,072.40‬‬ ‫‪94.00‬‬ ‫‪Invoice Budget‬‬
‫‪7,269.02‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪893.00‬‬ ‫‪303.62‬‬ ‫‪6,072.40‬‬ ‫‪94.00‬‬ ‫‪Planned Value‬‬
‫‪7,269.02‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪893.00‬‬ ‫‪303.62‬‬ ‫‪6,072.40‬‬ ‫‪94.00‬‬ ‫‪Earned Value‬‬
‫‪44,575.00‬‬ ‫‪44,575.00‬‬ ‫‪Actual Cost‬‬
‫‪37,305.98-‬‬ ‫‪-‬‬ ‫‪44,575.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪893.00‬‬ ‫‪303.62‬‬ ‫‪6,072.40‬‬ ‫‪Cost Variance‬‬
‫عزل رطوبة لألسطح الخرسانية الداخلية‬ ‫‪7.5‬‬
‫‪.‬لخزانات المياة وحمام السباحة‬
‫توريد وعمل عزل رطوبة لألسطح الداخليه‬
‫لخزانات المياه وحمامات السباحه (لألرضيات ‪-‬‬
‫للحوائط ‪ -‬أسقف ) وذلك بإستخدام دهانات بمادة‬
‫عازلة للمياه بأساس أسمنتى معدل وغير سام ‪،‬‬
‫تطبق باستخدام فرشاة خشنة أو رولة أو الرش‬
‫و يتم دهان عدد ‪ 2‬وجهه متعامدين ‪ ،‬ويتم التنفيذ‬
‫بمعرفة شركة متخصصة مع استخراج شهادة‬
‫ضمان للعزل المائي ‪ .‬والفئة تشمل تهيئة‬
‫واعداد األسطح و ازاله جميع االتربة و الزيوت‬
‫و المواد المعالجة من على السطح و اإلختبارات‬
‫وأسقف‬
‫وأرضيات طبقاً‬ ‫الداخلية‬
‫األعمال‪ .‬وذلك‬ ‫الحوائط لنهو‬ ‫ولزوم‬
‫كل ما يلزم‬ ‫‪7.5.1‬‬
‫‪122‬‬ ‫‪104.30‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪20.00‬‬ ‫‪4.50‬‬ ‫‪79.80‬‬ ‫‪416.00‬‬ ‫م‪2‬‬ ‫المياه‬ ‫خزانات‬
‫ومستندات التعاقد و توصيات الشركه‬ ‫للرسومات‬
‫‪43,388.80‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪8,320.00‬‬ ‫‪1,872.00‬‬ ‫‪33,196.80‬‬ ‫‪416.00‬‬ ‫‪.‬المنتجه‬
‫‪BOQ Budget‬‬
‫‪43,388.80‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪8,320.00‬‬ ‫‪1,872.00‬‬ ‫‪33,196.80‬‬ ‫‪416.00‬‬ ‫‪Invoice Budget‬‬
‫‪43,388.80‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪8,320.00‬‬ ‫‪1,872.00‬‬ ‫‪33,196.80‬‬ ‫‪416.00‬‬ ‫‪Planned Value‬‬
‫‪43,388.80‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪8,320.00‬‬ ‫‪1,872.00‬‬ ‫‪33,196.80‬‬ ‫‪416.00‬‬ ‫‪Earned Value‬‬
‫‪44,575.00‬‬ ‫‪44,575.00‬‬ ‫‪Actual Cost‬‬
‫‪1,186.20-‬‬ ‫‪-‬‬ ‫‪44,575.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪8,320.00‬‬ ‫‪1,872.00‬‬ ‫‪33,196.80‬‬ ‫‪Cost Variance‬‬
‫الشرقيون للتنمية العمرانية‬
‫االدارة الهندسية ‪ -‬المكتب الفني‬
‫مشروع ‪ /‬عمارة الكوربة‬

‫‪###‬‬ ‫أسعار األعمال المدنية لعمارة الكوربة‬


‫لزوم الحوائط الداخلية وأرضيات حمامات‬ ‫‪7.5.2‬‬
‫‪122‬‬ ‫‪104.30‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪20.00‬‬ ‫‪4.50‬‬ ‫‪79.80‬‬ ‫‪170.00‬‬ ‫م‪2‬‬ ‫السباحة‬
‫‪17,731.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3,400.00‬‬ ‫‪765.00‬‬ ‫‪13,566.00‬‬ ‫‪170.00‬‬ ‫‪BOQ Budget‬‬
‫‪17,731.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3,400.00‬‬ ‫‪765.00‬‬ ‫‪13,566.00‬‬ ‫‪170.00‬‬ ‫‪Invoice Budget‬‬
‫‪17,731.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3,400.00‬‬ ‫‪765.00‬‬ ‫‪13,566.00‬‬ ‫‪170.00‬‬ ‫‪Planned Value‬‬
‫‪17,731.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3,400.00‬‬ ‫‪765.00‬‬ ‫‪13,566.00‬‬ ‫‪170.00‬‬ ‫‪Earned Value‬‬
‫‪44,575.00‬‬ ‫‪44,575.00‬‬ ‫‪Actual Cost‬‬
‫‪26,844.00-‬‬ ‫‪-‬‬ ‫‪44,575.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪3,400.00‬‬ ‫‪765.00‬‬ ‫‪13,566.00‬‬ ‫‪Cost Variance‬‬
‫عزل رطوبة لألسطح الخرسانية باالماكن‬ ‫‪7.6‬‬
‫‪.‬المعرضة للرطوبة‬
‫توريد وتركيب طبقة عازلة للرطوبة من أغشية‬
‫من لفائف البيتومين المعالجه والمسلحه سمك ‪4‬‬
‫مم وذلك لألسطح الخرسانية االفقية باالماكن‬
‫المعرضة للرطوبة كـ(حمامات‪ -‬مطابخ ‪ -‬مغسلة‬
‫‪ -‬جاكوزي ‪ -‬بخار‪ -‬وماشابهه) وعلي اى‬
‫منسوب ‪ .‬والفئة تشمل تهيئة واعداد األسطح و‬
‫ازاله جميع االتربة و الزيوت و المواد المعالجة‬
‫من على السطح‪ ،‬وعمل دهان بيتوميني‬
‫تحضيري ‪ ،‬وعمل رقبة زجاجة أسمنتية لزوم‬
‫الوزرات الرأسية وعمل الفواصل والركوب‪،‬‬
‫وكذلك عمل الطبقة العازلة حول الفتحات وحول‬
‫مواسير المياة ومواسير الصرف ‪.‬و تشمل الفئة‬
‫عمل وزرة رأسية بارتفاع ‪ 300‬مم وتشمل أيضا ً‬
‫عمل الحماية الالزمة بطبقة لياسة اسمنتية‬
‫سمك ‪ 30‬مم ‪ ،‬مع األخذ في اإلعتبار إختبار‬
‫العزل قبل التشطيب لمدة ال تقل عن يومين‬
‫‪.‬وطبقا" للمواصفات و أصول الصناعة‬

‫لزوم أرضيات الحمامات العامة والمناطق‬ ‫‪7.6.1‬‬


‫‪172‬‬ ‫‪146.80‬‬ ‫‪9.00‬‬ ‫‪27.00‬‬ ‫‪3.00‬‬ ‫‪28.00‬‬ ‫‪22.80‬‬ ‫‪57.00‬‬ ‫‪44.00‬‬ ‫م‪2‬‬ ‫المعرضة للرطوبة بالمناطق العامة‬
‫‪6,459.20‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪396.00‬‬ ‫‪1,188.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪132.00‬‬ ‫‪1,232.00‬‬ ‫‪1,003.20‬‬ ‫‪2,508.00‬‬ ‫‪44.00‬‬ ‫‪BOQ Budget‬‬
‫‪6,459.20‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪396.00‬‬ ‫‪1,188.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪132.00‬‬ ‫‪1,232.00‬‬ ‫‪1,003.20‬‬ ‫‪2,508.00‬‬ ‫‪44.00‬‬ ‫‪Invoice Budget‬‬
‫‪6,459.20‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪396.00‬‬ ‫‪1,188.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪132.00‬‬ ‫‪1,232.00‬‬ ‫‪1,003.20‬‬ ‫‪2,508.00‬‬ ‫‪44.00‬‬ ‫‪Planned Value‬‬
‫‪6,459.20‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪396.00‬‬ ‫‪1,188.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪132.00‬‬ ‫‪1,232.00‬‬ ‫‪1,003.20‬‬ ‫‪2,508.00‬‬ ‫‪44.00‬‬ ‫‪Earned Value‬‬
‫‪44,575.00‬‬ ‫‪44,575.00‬‬ ‫‪Actual Cost‬‬
‫‪38,115.80-‬‬ ‫‪-‬‬ ‫‪44,575.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪396.00‬‬ ‫‪1,188.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪132.00‬‬ ‫‪1,232.00‬‬ ‫‪1,003.20‬‬ ‫‪2,508.00‬‬ ‫‪Cost Variance‬‬
‫‪172‬‬ ‫‪146.80‬‬ ‫‪9.00‬‬ ‫‪27.00‬‬ ‫‪3.00‬‬ ‫‪28.00‬‬ ‫‪22.80‬‬ ‫‪57.00‬‬ ‫‪600.00‬‬ ‫م‪2‬‬ ‫لزوم أرضيات حمامات ومطابخ الشقق‬ ‫‪7.6.2‬‬
‫‪88,080.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,400.00‬‬ ‫‪16,200.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,800.00‬‬ ‫‪16,800.00‬‬ ‫‪13,680.00‬‬ ‫‪34,200.00‬‬ ‫‪600.00‬‬ ‫‪BOQ Budget‬‬
‫‪88,080.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,400.00‬‬ ‫‪16,200.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,800.00‬‬ ‫‪16,800.00‬‬ ‫‪13,680.00‬‬ ‫‪34,200.00‬‬ ‫‪600.00‬‬ ‫‪Invoice Budget‬‬
‫‪88,080.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,400.00‬‬ ‫‪16,200.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,800.00‬‬ ‫‪16,800.00‬‬ ‫‪13,680.00‬‬ ‫‪34,200.00‬‬ ‫‪600.00‬‬ ‫‪Planned Value‬‬
‫‪88,080.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,400.00‬‬ ‫‪16,200.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,800.00‬‬ ‫‪16,800.00‬‬ ‫‪13,680.00‬‬ ‫‪34,200.00‬‬ ‫‪600.00‬‬ ‫‪Earned Value‬‬
‫‪44,575.00‬‬ ‫‪44,575.00‬‬ ‫‪Actual Cost‬‬
‫‪43,505.00‬‬ ‫‪-‬‬ ‫‪44,575.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪5,400.00‬‬ ‫‪16,200.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪1,800.00‬‬ ‫‪16,800.00‬‬ ‫‪13,680.00‬‬ ‫‪34,200.00‬‬ ‫‪Cost Variance‬‬
‫لزوم األرضيات حول وأسفل حمام السباحة بدور‬ ‫‪7.6.3‬‬
‫‪172‬‬ ‫‪146.80‬‬ ‫‪9.00‬‬ ‫‪27.00‬‬ ‫‪3.00‬‬ ‫‪28.00‬‬ ‫‪22.80‬‬ ‫‪57.00‬‬ ‫‪95.00‬‬ ‫م‪2‬‬ ‫السطح علي منسوب ‪19.40 +‬‬
‫‪13,946.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪855.00‬‬ ‫‪2,565.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪285.00‬‬ ‫‪2,660.00‬‬ ‫‪2,166.00‬‬ ‫‪5,415.00‬‬ ‫‪95.00‬‬ ‫‪BOQ Budget‬‬
‫‪13,946.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪855.00‬‬ ‫‪2,565.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪285.00‬‬ ‫‪2,660.00‬‬ ‫‪2,166.00‬‬ ‫‪5,415.00‬‬ ‫‪95.00‬‬ ‫‪Invoice Budget‬‬
‫‪13,946.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪855.00‬‬ ‫‪2,565.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪285.00‬‬ ‫‪2,660.00‬‬ ‫‪2,166.00‬‬ ‫‪5,415.00‬‬ ‫‪95.00‬‬ ‫‪Planned Value‬‬
‫‪13,946.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪855.00‬‬ ‫‪2,565.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪285.00‬‬ ‫‪2,660.00‬‬ ‫‪2,166.00‬‬ ‫‪5,415.00‬‬ ‫‪95.00‬‬ ‫‪Earned Value‬‬
‫‪44,575.00‬‬ ‫‪44,575.00‬‬ ‫‪Actual Cost‬‬
‫‪30,629.00-‬‬ ‫‪-‬‬ ‫‪44,575.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪855.00‬‬ ‫‪2,565.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪285.00‬‬ ‫‪2,660.00‬‬ ‫‪2,166.00‬‬ ‫‪5,415.00‬‬ ‫‪Cost Variance‬‬
‫الباب السابع ‪ -‬أعمال الوقاية من الحرارة‬
‫‪.‬والرطوبة‬
‫طبقات عزل االسطح‬ ‫‪7.7‬‬
‫توريد وتركيب طبقات األسطح بالكامل والفئة‬
‫تشمل توريد وتركيب وعمل الطبقات و األعمال‬
‫‪ :‬التالية‬
‫خـرسانة عادية لــتشكيلميولاــالسطح ســمك ‪1.‬‬
‫‪ .‬متوسط ‪ 70‬ممـ‬
‫عملطبقهـ عازلة لـلرطوبة منلـفائفاــلبيتومين ‪2.‬‬
‫اــلمعـاــلجهـ واــلمسلحهـ ســمك ‪ 4‬ممـ وذلك أعليدهان‬
‫أوليبــرايمر معـ اعداد اــألسطح وعملرقبة زجاجة‬
‫عليمحيط اــلدروة واــلحوائط الـستقباــلوزرة عزل‬
‫الصاج‬ ‫البولي ايثلين‬
‫بالمسماير‬ ‫موزايكو وزر‬ ‫موزايكو ترابيع‬ ‫البوليسترين‬ ‫لفائف بيتومين‬ ‫البندممـ‬
‫‪ .‬بــارتفاع الـ يــقلعن‪300‬‬
‫والورد‬ ‫عملطبقهـ عازلهـ لـلحرارة مناــلبولسترينعاــلى‪3.‬‬
‫‪ .‬اــلكثافة اــلمصنوع بــطريقة اــلبثقســمك ‪ 50‬ممـ‬
‫‪4. 150‬‬ ‫ـمك ‪+‬‬
‫منسوب‬ ‫بوليعلي‬
‫إيثيلينسـ‬ ‫السطح‬
‫دورمناــل‬‫أرضياتطبقة‬ ‫لزوم‬
‫فـــرد وتثبيت‬ ‫‪7.7.1‬‬
‫‪486‬‬ ‫‪415.28‬‬ ‫‪30.00‬‬ ‫‪11.40‬‬ ‫‪15.00‬‬ ‫‪114.00‬‬ ‫‪123.12‬‬ ‫‪121.76‬‬ ‫‪290.00‬‬ ‫م‬
‫‪2‬‬
‫‪18.50‬‬
‫‪.‬ميكرونلــحماية اــلطبقة اــلعـازلة لـألسطح‬
‫‪120,431.20‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪8,700.00‬‬ ‫‪3,306.00‬‬ ‫‪4,350.00‬‬ ‫‪33,060.00‬‬ ‫‪-‬‬ ‫‪35,704.80‬‬ ‫‪35,310.40‬‬ ‫‪290.00‬‬ ‫تــركيبتــرابي عـ بــالط تــيرازو مقاس‪5.‬‬ ‫‪Budget‬و‪BOQ‬‬
‫وتوريد‬
‫‪120,431.20‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪8,700.00‬‬ ‫‪3,306.00‬‬ ‫‪4,350.00‬‬ ‫‪33,060.00‬‬ ‫‪-‬‬ ‫‪35,704.80‬‬ ‫‪35,310.40‬‬ ‫‪290.00‬‬ ‫‪ 20‬ممـ‬ ‫‪×200 Budget‬‬
‫‪Invoice‬‬ ‫‪×200 .‬‬
‫‪120,431.20‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪8,700.00‬‬ ‫‪3,306.00‬‬ ‫‪4,350.00‬‬ ‫‪33,060.00‬‬ ‫‪-‬‬ ‫‪35,704.80‬‬ ‫‪35,310.40‬‬ ‫‪290.00‬‬
‫مائلة منبــالط تــيرازو ‪6.‬‬ ‫‪ .‬عملوزرات‬
‫‪Planned Value‬‬
‫تــوريد وتركيبقــاطعـ مياة مناــلصاج اــلغير ‪7.‬‬
‫‪120,431.20‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪8,700.00‬‬ ‫‪3,306.00‬‬ ‫‪4,350.00‬‬ ‫‪33,060.00‬‬ ‫‪-‬‬ ‫‪35,704.80‬‬ ‫‪35,310.40‬‬ ‫‪290.00‬‬ ‫‪Earned‬ـمك ‪ 1.25‬ممـ يــركبفـــوقأطراف‬ ‫‪Value‬ـلصدأ سـ‬
‫قــابللـ‬
‫‪44,575.00‬‬ ‫‪44,575.00‬‬ ‫عـازلة لـلرطوبة اــلرأسية بــاــألسطح‬ ‫‪Actual‬‬ ‫‪Cost‬‬
‫مواد اــل‬ ‫اــل‬
‫‪75,856.20‬‬ ‫‪-‬‬ ‫‪44,575.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪8,700.00‬‬ ‫‪3,306.00‬‬ ‫‪4,350.00‬‬ ‫‪33,060.00‬‬ ‫‪-‬‬ ‫‪35,704.80‬‬ ‫‪35,310.40‬‬ ‫‪ Cost‬غير قــابلة لــلصدأ معـ ملو‬ ‫‪Variance‬وورد‬
‫بــمسامير‬
‫معجون‬ ‫بــاــل‪+‬‬
‫منسوب‬‫عليقاطعـ‬
‫السطحو اــل‬
‫بــيناــلحائط‬
‫علوىدور‬ ‫فراغ اــل‬
‫أرضيات‬ ‫اــل‬
‫لزوم‬ ‫‪7.7.2‬‬
‫‪486‬‬ ‫‪415.28‬‬ ‫‪30.00‬‬ ‫‪11.40‬‬ ‫‪15.00‬‬ ‫‪114.00‬‬ ‫‪123.12‬‬ ‫‪121.76‬‬ ‫‪700.00‬‬ ‫م‬
‫‪2‬‬
‫كـافة مواد اــلغلق‬ ‫تــركيب‬ ‫ـ‬‫ع‬‫م‬ ‫)‬‫ن‬ ‫سليكو‬
‫‪ ( 21.60‬بالطة السطح العلوي )‬‫(اــل‬‫ق‬ ‫غـاــل‬
‫اــل‬
‫‪ rod.‬وعود اــلحبس‬
‫‪290,696.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪21,000.00‬‬ ‫‪7,980.00‬‬ ‫‪10,500.00‬‬ ‫‪79,800.00‬‬ ‫‪-‬‬ ‫‪86,184.00‬‬ ‫‪85,232.00‬‬ ‫‪700.00‬‬ ‫‪BOQ Budget‬‬
‫والفئة تشمل جميع األعمال الالزمة لتنفيذ البند‬
‫‪290,696.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪21,000.00‬‬ ‫‪7,980.00‬‬ ‫‪10,500.00‬‬ ‫‪79,800.00‬‬ ‫‪-‬‬ ‫‪86,184.00‬‬ ‫‪85,232.00‬‬ ‫‪700.00‬‬ ‫‪Invoice‬للمواصفات والرسومات لكل بند‬ ‫‪Budget‬‬
‫جميعه طبقا‬ ‫مما‬
‫‪290,696.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪21,000.00‬‬ ‫‪7,980.00‬‬ ‫‪10,500.00‬‬ ‫‪79,800.00‬‬ ‫‪-‬‬ ‫‪86,184.00‬‬ ‫‪85,232.00‬‬ ‫‪700.00‬‬ ‫‪Planned‬يخصه والفئة تشمل جميع‬ ‫‪Value‬كال" فيما‬
‫فرعي‬
‫‪290,696.00‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪21,000.00‬‬ ‫‪7,980.00‬‬ ‫‪10,500.00‬‬ ‫‪79,800.00‬‬ ‫‪-‬‬ ‫‪86,184.00‬‬ ‫‪85,232.00‬‬ ‫‪700.00‬‬ ‫األعمال طبقا" طبقاً للرسومات‬ ‫‪ Value‬لنهو‬
‫‪Earned‬‬ ‫مايلزم‬
‫‪44,575.00‬‬ ‫‪44,575.00‬‬ ‫‪.‬والمواصفات و ألصول الصناعة‬
‫‪Actual Cost‬‬
‫‪246,121.00‬‬ ‫‪-‬‬ ‫‪44,575.00-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪-‬‬ ‫‪21,000.00‬‬ ‫‪7,980.00‬‬ ‫‪10,500.00‬‬ ‫‪79,800.00‬‬ ‫‪-‬‬ ‫‪86,184.00‬‬ ‫‪85,232.00‬‬ ‫‪Cost Variance‬‬
‫الباب الثامن ‪ -‬أعمال األبواب والشبابيك‬

‫اجمالي األعمال المدنية والمعمارية‬


T.S wood depr. scafolding Steel Subcontractor Crane Tests Bascot Labor
87,800.00 108,700.00 16,533.00 74,070.00 200,000.00

2,317.00 18,400.00 - 436.30 - 5,277.90


3,073.32 73,600.00 47,650.00 3,908.03 578.71 2,662.99 7,000.73
1,110.21 10,000.00 1,411.74 209.06 961.99 2,528.96
22,754.60 80,000.00- 28,934.70 4,284.76 19,716.59 51,832.80
5,834.52 175,000.00 7,419.16 1,098.66 5,055.54 13,290.48
1,411.72 42,000.00- 1,795.14 265.83 1,223.24 3,215.76
755.33 200,000.00 960.47 142.23 654.48 1,720.56
1,343.59 1,708.51 253.00 1,164.20 3,060.57
282.71 359.49 53.23 244.96 643.97
48,917.01 62,202.77 9,211.22 42,386.01 111,428.28
87,800.00 355,000.00 - 2,863,280 1,608,256 108,700.00 16,533.00 74,070.00 200,000.00
Compensation Farmaga Concrete
104,876.00 54,200.00 3,983,181.00

- 1,430.31 166,600.00
8,814.68 1,897.20 143,204.89
3,184.23 685.35 51,731.66
65,263.14 14,046.69 1,060,277.22
16,734.16 3,601.72 271,866.30
4,048.99 871.47 65,780.61
2,166.38 466.27 35,195.38
3,853.59 829.41 62,606.16
810.83 174.52 13,172.97
- 30,197.06 2,279,345.81
104,876.00 54,200.00 3,983,181.00