Payment Stage o/
/o Amount

Advance Payment 6A9L Rs.2,508,600.00

1st Interim Payment After Deliver All Goods 75% Rs.627,150.00

2nd Interim Payment After Installation 75% Rs. 627,150.00

Final Payment at the Completion (After Commissioning and


10"/" Rs. 418,100.00
After Submission of Warranty Certificate)

Total Amount (Ex VAT) Rs.4,181,000.00

The foliowing documents shall be deemed to form, be read with and construed as part and
parcel of this Contract. For the purposes of interpretatiory the priority of documents sl'rall be in
accordance with the following sequence.

a) This Agreement
b) Letter of Acceptance
c) The Form ofBid
d) Contract Data
e) Conciition of Contract
0 Speci{ic Conditions of Contract
g) Specific Proiect Details
h) The Speciiications
i) The Drawings
n The Priced Bills of Quantities

The contractor shall strictly follow the safety regulations and keep the site and surrounding as
clean as possible and follow the traffic regulations applicable from time to time to the
satisfaction of the Engineer. The contractor shall make prompt arrangements to remove and
cart au,ay any solid waste and unusable or rejected construction material from site.

The contractor shall strictly follow & comply with standard noise levels, vibration monitoring,
health and safety requirement and other specific instruction as advised bv the Engineer &
relevant authorities. Contractor shall provide safety plan & other relevant documents for
Engineer's approval before commence the works & during conskuction.