Professional Documents
Culture Documents
SHD Cscec 18 F01 ST SC 01 Ex 05 0003 0000 01
SHD Cscec 18 F01 ST SC 01 Ex 05 0003 0000 01
12 DN
325.12 325.12 325.12 325.12
F.F.L. F.F.L. F.F.L.
325.12
5 4 3 2 F.F.L.
F.F.L.
F.F.L. F.F.L. F.F.L. UP 1 Client :
C-04 325.12
F.F.L. S.G S.G
C-04
S.G
325.12
325.12
S.G
S.G
S.G
S.G
S.G
F.F.L.
9
Ministry of Housing, Utilities
4.28
1157
6.74
X=8 214.123
1
1156
9.96
X=8 234.274
0 1145
X=8 586.007
Y=6
82 680 1475 920
& Urban Development
750 1550
DRAINAGE PIT 82
Y=6
82 5 Y=6
1 0.91
7.6 8 1157 7.37
3
11 57 680 1475 1475 1475 1475 920 X=8 231.483 B070 B071 1144
X=8 211.327 82 X=8 0.48
2
Y=6
S.G
S.G
S.G
S.G
B079 B080 B081
Y=6
8 2 8259
Y=6
750 750
750750
9
3.81
1145
1 X=8 587.405
B074 B075 B076 B077 B078 5.80 82
1 157 Y=6
S.G
X=8 9 680 1475 1475 920
6.91
750 1550
1 B072 B073
7.21 8221
1157 Y=6
X=8 212.725 1 0.43
7
6.27
Y=6
82 1157 1157 DRAINAGE PIT
X=8 215.521 X=8 232.878
82 82
Y=6 Y=6
680 1475 920
3
7.84
1144
X=8 589.084
2% Y=6
82
2% 2.3%
2%
New Urban Communities
S.G
2.3%
1.3% Authority
S.G
COLUMN
2.0%
EXIT C9
ENT C9
324.20 324.10
323.94
324.00
T.O.S.
323.94
Main Consultant :
S.G
323.94
T.O.S. T.O.S.
T.O.S.
324.00 UP
T.O.S.
D D
322.70 324.20
F.F.L. F.F.L.
324.40
UP
T.O.S.
323.940
T.O.S.
324.10 323.80
C-05
F.F.L. T.O.S.
S.G
324.20 325.02
C-05
324.20
324.20
F.F.L.
F.F.L. 324.20
C.L.
Sub -Consultant :
F.F.L. 324.20
F.F.L.
323.940
T.O.S.
324.85
F.F.L. 324.35
COLUMN 324.85
F.F.L.
S.G
324.90 F.F.L.
2.6% T.O.S.
0.3% 323.60
T.O.S. 324.50
0.3% T.O.S.
324.85
F.F.L.
S.G
RAMP
S.G
0.35%
RAMP 50.34%
324.10
T.O.S.
325.00
324.32
F.F.L. Contractor :
F.F.L.
325.02
C-04
325.00
F.F.L.
C-04
C.L.
324.80
T.O.S.
2% 324.90
T.O.S.
325.12
325.00
2% F.F.L.
Project Name :
323.60 323.60
2.5% 324.50
F.F.L.
325.00
F.F.L. 324.50
324.50
F.F.L.
324.90
T.O.S. 323.30
T.O.S.
323.30
T.O.S.
C-08 S.G
Of the
F.F.L.
2%
325.00 325.00
F.F.L.
C-05 324.36
TREE
325.00
F.F.L. C-08 S.G
325.02
C.L.
New Administrative Capital
T.O.S.
324.40
T.O.S.
COLUMN S.G
CBD EAST - PHASE 1
C-05
324.50
325.00
F.F.L.
Key Plan :
324.80
324.90
T.O.S.
41.40%
T.O.S.
324.50
324.50
F.F.L. 325.00
324.80 F.F.L.
UP T.O.S.
324.36
ALIPHATIC URETHANE TRAFFIC
T.O.S. COATING SYSTEM ON STEEL
NORTH
REINFORCED
325.00 CEMENT-SAND-SCREED: Refer to
324.50
F.F.L. E18066-0104D-FD-07-C08-A-4-00-070-1
F.F.L.
324.50
F.F.L. 325.02
325.00
F.F.L. C.L.
324.36 324.36
324.36 324.36 T.O.S.
T.O.S.
T.O.S. T.O.S. S.G
324.20
T.O.S.
324.40 324.40
T.O.S. T.O.S.
324.40 324.40
T.O.S. T.O.S. 325.00
324.40
F.F.L.
T.O.S. S.G
325.00
F.F.L.
325.00
NOTE:
S.G
S.G
S.G
1%
C 1.5% 325.00
C WITH PROJECT SPECIFICATIONS AND OTHER
2.2%
0.3% F.F.L.
RELATED DRAWINGS.
1.5% 1% 1%
2% S.G
2% 325.00
F.F.L.
325.00
F.F.L.
1% 02-DEFORMED HIGH TENSILE STEEL
0.3% 0.3% 0.3% 0.3% REINFORCEMENT BARS B500DWR HAVING A
STAIR-P02
STAIR-P01 S.G S.G
1% 1% 1% 1138
X=8 422.761
Y=6
82
PRACTICE AND PROJECT SPECS.
2%
B065
1
0 0.38
1.90 1138
325.65
X=8 421.777
1600
1138
X=8 422.280
Y=6
82
03-DO NOT SCALE FROM DRAWINGS, ALL
B066
0.3% 0.6% Y=6
82
0.3% 1.7%
1600
0.3% 30%
B067
DIMENSIONS & COORDINATES SHOULD BE READ OR
1600
9
8.86
1137 DRAINAGE PIT
B068
X=8 421.254
Y=6
82
2% COMPUTED.
1600
1% 1% 1%
B069
4 750750
7.36
2% 1.5% 2% 1.5%
1137
X=8 420.709
82
Y=6
04-UNLESS OTHERWISE NOTED ON THE DRAWINGS,
DIMENSIONS ARE GIVEN IN MILLIMETERS AND
STAIR-P01
0.3% 0.3%
0.3% STAIR-P02
0.3%
LEVELS IN METERS.
2% 1%
325.00 325.00
2%
1.5% 1% 1%
0.3%
S.G
05-CONCRETE GRADE
1.5%
325.00
F.F.L.
1% S.G
1.5%
1.2% 0.3% 325.00
325.00
F.F.L.
F.F.L. S.G
325.00
324.40 324.40 F.F.L.
T.O.S. T.O.S.
324.40
324.40
06-CONCRETE COVER
T.O.S.
T.O.S.
324.20
T.O.S.
324.34
T.O.S.
324.34
T.O.S.
324.34
T.O.S. 324.34
T.O.S.
Element Concrete Cover
S.G
Foundation 50mm
ALIPHATIC URETHANE TRAFFIC S.G S.G
1 E18066-0105D-FD-18-F03-EY-5-SS-001-1 13/06/2019
325.00
325.00
C-06 TREE
COLUMN
324.90
T.O.S.
324.90
325.00
F.F.L
PENTHOUSE
FOR FANROOM
0.5% Drawings 2
3
E18066-0105D-FD-18-F01-ES-1-OP-001-3
E18066-0105D-FD-18-F00-SC-0-GN-001-2
22/03/2020
21/10/2019
C-07
F.F.L.
F.F.L. T.O.S.
INTAKE 4 E18066-0105D-FD-18-F00-SC-0-GN-002-1 21/10/2019
324.50
S.G
324.40
0.5%
325.00
T.O.S.
2% S.G
5 DWG-CSCEC-18-F01-LS-HR-0001-03 16/03/2020
325.00 323.30 S.G
2.5%
F.F.L. 325.00
F.F.L.
T.O.S. 323.30
T.O.S. 6 DWG-CSCEC-18-F01-LS-HR-0003-01 16/03/2020
B 1.5%
324.90
T.O.S. 323.60
T.O.S. C-07 323.60
T.O.S.
B 7
8
DWG-CSCEC-18-F01-LS-HR-0004-01
DWG-CSCEC-01-A01-AR-AR-0536-00
29/04/2020
07/02/2022
9 SHD-CSCEC-18-F03-ST-SC-02-RF-01-0004-0000-01 15/06/2020
0.5%
2%
2%
324.49
F.F.L.
S.G
D-05 0.3%
10
11
DWG-CSCEC-11-G00-ST-SC-1258-00
DWG-CSCEC-11-G00-ST-SC-1260-00
17/12/2022
17/12/2022
324.90
T.O.S.
324.80
T.O.S.
2.5%
325.00 12
13
DWG-CSCEC-11-G00-ST-SC-0280-02
DWG-CSCEC-08-G00-ST-SC-1417-01
29/01/2023
14/02/2023
2% 14 ASB-CSCEC-08-G00-ST-SC-0026-00 22/02/2023
325.00
RAMP RAMP
325.00
F.F.L.
325.00
F.F.L
15 ASB-CSCEC-08-G00-ST-SC-0025-00 22/02/2023
324.32
F.F.L.
325.00
F.F.L.
F.F.L
0.8%
324.10
16 DWG-CSCEC-08-G00-ST-SC-0264-07 07/02/2023
T.O.S.
17 DWG-CSCEC-06-C05-AR-AR-0242-02 23/11/2021
0.35%
RAMP
0.3% 324.85
325.00
324.90 F.F.L.
F.F.L
325.00
F.F.L
0.5%
T.O.S.
2.6% 2%
0.3% 324.85
F.F.L.
325.00
F.F.L 1 MAT-CSCEC-18-EL-LC-0031-04 17/04/2022
COLUMN 324.50
T.O.S.
325.00
324.85
324.35
F.F.L.
S.G
F.F.L
Documents
324.90 324.85
323.94 F.F.L.
T.O.S. F.F.L.
T.O.S.
324.10
324.20
S.G S.G
324.10
T.O.S.
T.O.S.
2% 324.98
F.G.L. 0.3%
324.98
F.G.L.
2%
325.00
324.35
F.F.L
F.F.L.
S.G
ENT B2
Exit B2
ENT C6
324.20 324.10
T.O.S.
324.10
324.10
T.O.S.
323.94
T.O.S.
S.G
Coordination Table :
2.0%
2.3% Structure C.
2%
8 2% Structure S.
1 6.87
7
1134
5.31
1134
3.90
7 2% 2.3%
1134 X=8 151.803
325.00
1.18 X=8 147.169 X=8 5.99
7
1135
F.F.L
6
DRAINAGE PIT X=8
8213
4.71
6
Y=6
82 Y=6
82
Y=6
8215 Electrical
2.13 Y=6
325.00 325.00
1135
D-05
X=8 131.925 8 F.F.L F.F.L
7.81
S.G
82 1134 Plumbing
Y=6 680 1475 1475 1475 920 X=8 144.373 920 1475 1475 1475 1475 680
82 B052 B053 B054 B055
Y=6
750750
750750
750750
S.G
325.00
F.F.L.
HVAC
S.G
4
S.G
0.70
325.00
B048 B049 B050 B051 B056 B057 B058 B059 B060 6
3.43
D-05
1135
680 1475 1475 1475 920 F.F.L
X=8 136.112 11 34
S.G
S.G
S.G
8 X=8 157.395
1.65 82 325.00
Other
325.00
1135 Y=6 8 Y =6
82 F.F.L
X=8 133.320 7.34
8 4.84
82 113 4 .407 1 134 DRAINAGE PIT
Y=6 X=8 145.771 811346 67 X=8 153.201 325.00
82 X= 8.5 Y=6
82 .377 F.F.L
Y=6 2 1 4 1344
Y=6
8 DRAINAGE PIT X=81 54.599
821
Y=6
325.00
F.F.L
325.50
F.F.L Revision Table :
S.G
2%
325.00
S.G
F.F.L
325.00
325.00 325.00
F.F.L F.F.L
DN
325.00
S.G
F.F.L. 325.50
F.F.L
S.G
S.G
S.G
S.G
325.50
F.F.L
UP
325.00 325.00
F.F.L 325.00
F.F.L
F.F.L
325.00
F.F.L.
S.G
0.3%
Drawing Title :
S.G
325.00
F.F.L.
PENTHOUSE
FOR FANROOM 0.3%
INTAKE INF-F01
AUTOMATIC RISING BOLLARD
FOUNDATION LAYOUT (PART 3)
S.G
S.G
S.G
0.3% 1.1%
S.G
S.G
325.00
F.F.L.
S.G
325.00
F.F.L.
S.G
S.G
325.00
F.F.L.
0.3%
0.3%
D-05 0.5% 0.3%
AHMED ABDELWAHAB DUAN XINGCHAO WU GUANGJUN
S.G
325.00
D-05 325.00
1.9%
2.7%
F.F.L.
F.F.L
2.2%
1%
0.4%
1%
PENTHOUSE
FOR FANROOM
325.00 325.00
F.F.L.
324.89
F.G.L.
0.3%
AHMED ABDELWAHAB 18 FEB 2023 AS SHOWN
324.35
INTAKE 1.7%
D-04
F.F.L
324.85
F.F.L
324.85
F.F.L
SHD CSCEC 18 F01 ST SC 01 EX 05 0003 0000 01
Packa. Build. Sub Elemt. Floor Part Sheet Sequnc. Rev.
324.35
F.F.L
324.35 324.35
Type Contractor Discp.
5 324.35
F.F.L 324.35
F.F.L
324.35
F.F.L 324.35
F.F.L
4 3 2 1 No. Type Discp. Type Level No. No. No. No.
F.F.L
F.F.L
D-04 324.35