You are on page 1of 2

Contingency Plan

Name of Production: Producers Name: Contact Number:

Location / scene Potential problem Effect on production Control Measure Existing measures
Poole Camera not working/loss No photos so will have to Save to globe, back up memory Saving everything to the globe each
of memory stick retake stick day
Software Failing Slow down production, Save everything to the globe so Saving everything to the globe each
College potential loss of work work Is not lost, work on day
something else that day if software
fails.
College/home iPad failing/running out Slowing down production, Bringing a charger with me incase Always sending finished work over
of battery not being able to send the battery dies. teams so it's always accessible
myself work
Computer crashing Potential loss of work and Taking work out of the globe to Saving everything to the globe each
College slowed production work on and continuously saving day
work whilst working on It
College Loss of work Would need to redo Save everything to globe, take Saving everything to the globe each
photos of everything for proof day
Weebly deleting/not Would have to re do the Saving everything to the globe I will also be copying everything I
College saving work work each day and keeping track of my write each day and pasting it onto a
work. word document in case of Weebly
deleting the work, then I will not
have to re write it as I will already
have It on the globe.

You might also like