No Problem Total
1 Burry 6 PROBLEM TERBANYAK
2 Part nempel diatas 3
3 Baret 2
6
4 Buat stopper kait/gawang 2
5 Part tidak masuk jig 2
6 Baut stripper lepas 1
7 Bending cacat 1
8 Bending miring 1
9 Blank gompal 1
10 Camp pecah 1 3
11 Die cutting welding amblas 1
12 Hasil pierce penyok 1 2 2
13 Lobang pierce tidak masuk di cf 1
14 Part belum close 1
15 Punch gompal 1
16 Stopper belakang patah 1
17 Stripper lepas 1 Burry Part nempel diatas Baret Buat stopper
TOTAL 27 kait/gawang
APPROVED CHECKED PREPARED Department : Engineering
PREVENTIVE & CORRECTIVE No. Document :-
DIES 10-14 Oktober 2022 Revisi : 00
PT. DIAN RAYA CIPTA ROMADHON PENDI ANNISA Page :1/1
16
Target preventive & corrective dies:
9-12 dies/hari
36-48 dies/minggu
11 11 11