PEKERJAAN
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
PEKERJAAN :
PEMBANGUNAN GI 150 KV SUKATANI GOBEL Rp. 45,450,909,000
Terbilang : Empat Puluh Sembilan Milyar Sembilan Ratus Sembilan Puluh Lima Juta Sembilan Ra
Sembilan Puluh Sembilan Ribu Sembilan Ratus Rupiah
Konsorsium
PT. WISMA SARANA TEKNIK -
PT. MENARA INDRA UTAMA
TOTAL PRICE
NO. DESCRIPTION
(IDR)
1 2 3
3 Bill No 3 : Miscellaneous -
1,583,536,060
1,583,536,061
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
ELECTRO MECHANICAL WORKS, INSTALLATION AND OTHER SERVICES
TOTAL PRICE
NO. DESCRIPTION
(IDR)
1 2 4
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
1 Switchyard Equipment and Transformer
150 KV SWITCHYARD STEEL STRUCTURES, BUSBAR, EARTHING Rp 4,419,953,251
150 KV LINE BAY : 2 BAYS FOR LINE I & II Rp 5,994,778,980
150 KV LINE BAY : 2 BAYS FOR LINE III & IV Rp 5,811,154,257
150 kV TRANSFORMER BAY : 2 BAY Rp 4,283,089,587
150 KV BUS-COUPLER BAY : 1 BAY Rp 3,801,250,471
ENERGY METER PANEL Rp 319,743,950
150 KV SUBSTATION AUXILIARIES EQUIPMENT Rp 1,005,758,463
150/20 KV POWER TRANSFORMERS AND AUXILIARIES Rp 1,785,163,011
20 kV SWITCHGEARS AND POWER CABLES Rp 6,264,248,403
2 SUBSTATION AUTOMATION
SUBSTATION AUTOMATION HARDWARE Rp 1,022,156,505
SUBSTATION AUTOMATION SOFTWARE Rp 762,145,727
AC SUPPLY EQUIPMENT FOR SUBSTATION AUTOMATION Rp 129,380,191
POWER LINE CARRIER FOR 150 KV SUBSTATION Rp 1,760,273,802
DC POWER SUPPLAY Rp 255,004,433
TELECOMUNICATION EQUIPMENT Rp 842,463,978
3 MISCELLANEOUS Rp 494,248,478
4 TRAINING FOR SUBSTATION AUTOMATION Rp -
CONSISTING OF :
a. POST STEEL STRUCTURE TYPE 1N FOR A9, B9, B8, B7, C9, C8, C7 24 unit 24 unit 57,160,930 1,371,862,308 3,572,558 85,741,394 6,073,349 145,760,370 1,603,364,073.05
FOR D9, D8, D7, E8, E7
FOR ........
b. POST STEEL STRUCTURE TYPE 1F
c. POST STEEL STRUCTURE TYPE 2 FOR ........ 0 unit 0 unit - - - - - - -
FOR ........
d. POST STEEL STRUCTURE TYPE 3N FOR ........ 0 unit 0 unit - - - - - - -
e. POST STEEL STRUCTURE TYPE 3F
f. BEAM STEEL STRUCTURE TYPE 1 FOR B9-B8, B9-C9,C9-C8, C8-C7, C7-C6 26 unit 26 unit 28,580,465 743,092,084 1,786,279 46,443,255 3,036,674 78,953,534 868,488,872.90
FOR C9-D9, D8-D7, D7-D6, C7-D7
FOR E8-E7, E7-E6
1 . 2 BARE ALUMINIUM CONDUCTOR OF TAL 850 MM2 FOR THE INSTALLATION OF 3-PH DOUBLE 8 bays 8 bays 15,483,895 123,871,164 2,977,132 23,817,054 5,001,581 40,012,651 187,700,868.56
MAIN-BUSBAR 2 x TAL 850 MM2/PH TO COMPLETE THE SPECIFIED SCOPE OF WORK.
1 . 3 150 KV DOUBLE TENSION STRING INSULATOR SET 120 kN MIN. 5.270 MM CREEPAGE DISTANCE 48 sets 48 sets 7,706,008 369,888,375 59,543 2,858,046 595,426 28,580,465 401,326,886.16
COMPLETE WITH FITTINGS FOR INSTALLATION THE MAIN-BUSBAR AS SPECIFIED.
BIDDER :
FINAL REV 01 Page 6 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
1 . 4 150 KV SINGLE SUSPENSION STRING INSULATOR SET 120 kN MIN. 5.270 MM CREEPAGE DISTANC 18 sets 18 sets 3,847,645 69,257,611 59,543 1,071,767 476,341 8,574,139 78,903,518.09
COMPLETE WITH FITTINGS FOR INSTALLATION THE MAIN-BUSBAR AS SPECIFIED.
1 . 5 SET OF CLAMPS, CONNECTORS AND ACCESSORIES FOR INSTALLATION 8 bays 8 bays 48,229,534 385,836,274 1,786,279 14,290,232 6,549,690 52,397,519 452,524,025.37
OF THE MAIN BUSBAR AS SPECIFIED
1 . 6 SET OF CONDUCTOR FOR SHIELD WIRE AND ACCESSORIES FOR 1 lot 1 lot 68,797,942 68,797,942 4,763,411 4,763,411 12,003,795 12,003,795 85,565,148.08
INSTALLATION OF MAIN BUSBAR AND FLY BUS SHIELD WIRE AS SPECIFIED FOR 8 BAYS
1 . 7 SUBSTATION EARTHING GRID TO 40 KA LEVEL COMPRISING EQUIPMENT AND MATERIAL 1 lot 1 lot 663,483,581 663,483,581 7,145,116 7,145,116 71,451,162 71,451,162 742,079,858.97
TO COMPLETE THE SCOPE OF WORK FOR SUBSTATION EARTHING GRID AND EARTHING
CIRCUIT REQUIRED SUCH AS COPPER CONDUCTORS, RODS, CLAMPS AND CONNECTORS
FOR CONNECTION TO MAIN SUBSTATION EARTHING CIRCUIT AND TO INDIVIDUAL ITEM
OF EQUIPMENT AND STRUCTURES.
1 . 8 UPRATING THE EXISTING SUBSTATION EARTHING GRID TO 40 KA LEVEL COMPRISING 0 bays 0 bays - - - - - - -
EQUIPMENT AND MATERIAL TO COMPLETE THE SCOPE OF WORK FOR SUBSTATION
EARTHING GRID AND EARTHING CIRCUIT REQUIRED SUCH AS COPPER CONDUCTORS, RODS,
CLAMPS AND CONNECTORS FOR CONNECTION TO MAIN SUBSTATION EARTHING
CIRCUIT AND TO INDIVIDUAL ITEM OF EQUIPMENT AND STRUCTURES.
1 . 9 EXTENSION THE EXISTING SUBSTATION EARTHING GRID OF 40 KA LEVEL FOR NEW BAYS 0 bays 0 bays - - - - - - -
COMPRISING EQUIPMENT AND MATERIAL TO COMPLETE THE SCOPE OF WORK FOR
SUBSTATION EARTHING GRID AND EARTHING CIRCUIT REQUIRED SUCH AS COPPER
CONDUCTORS, RODS, CLAMPS AND CONNECTORS FOR CONNECTION TO MAIN SUBSTATION
EARTHING CIRCUIT AND TO INDIVIDUAL ITEM OF EQUIPMENT AND STRUCTURES.
2 . 2 150 KV DOUBLE TENSION STRING INSULATOR SET 120 kN MIN. 5.270 MM CREEPAGE DISTANCE 18 sets 18 sets 7,706,008 138,708,141 59,543 1,071,767 595,426 10,717,674 150,497,582.31
COMPLETE WITH FITTINGS FOR INSTALLATION OF THE LINE BAY AS SPECIFIED.
2 . 3 150 KV SINGLE SUSPENSION STRING INSULATOR SET 120 kN MIN. 5.270 MM CREEPAGE 6 sets 6 sets 3,847,645 23,085,870 59,543 357,256 476,341 2,858,046 26,301,172.70
DISTANCE COMPLETE WITH FITTINGS FOR INSTALLATION OF THE LINE BAY AS SPECIFIED.
2 . 4 150KV POST INSULATOR COMPLETE WITH CLAMPS AND SUPPORTING 3 sets 3 sets 13,777,570 41,332,711 893,140 2,679,419 1,786,279 5,358,837 49,370,966.59
STRUCTURE FOR DROPPER TO BUS DISCONNECTOR
BIDDER :
FINAL REV 01 Page 7 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
2 . 6 SET OF CONDUCTOR FOR SHIELD WIRE AND ACCESSORIES FOR INSTALLATION OF 0 bays 0 bays - - 4,763,411 - 12,003,795 - -
THE LINE BAY SHIELD WIRE AS SPECIFIED FOR LINE BAY.
2 . 7 150 kV 3 PHASE DISCONNECTING SWITCH MOTOR OPERATED, 4000 A 40 kA WITHOUT 4 unit 4 unit 132,327,552 529,310,207 4,167,984 16,671,938 7,145,116 28,580,465 574,562,609.90
EARTHING SWITCH, COMPLETE WITH CLAMPS AND SUPPORTING STRUCTURE FOR LINE BAY.
2 . 8 150 kV 3 PHASE DISCONNECTING SWITCH MOTOR OPERATED, 4000 A 40 kA WITH 2 unit 2 unit 156,560,213 313,120,427 4,167,984 8,335,969 7,145,116 14,290,232 335,746,628.07
EARTHING SWITCH, COMPLETE WITH CLAMPS AND SUPPORTING STRUCTURE FOR LINE BAY.
2 . 9 150 kV 3 PHASE SF6 CIRCUIT BREAKER, 4000 A 40 kA, COMPLETE WITH CLAMPS AND 2 unit 2 unit 738,319,742 1,476,639,483 5,358,837 10,717,674 8,931,395 17,862,790 1,505,219,947.91
SUPPORTING STRUCTURE FOR LINE BAY.
2 . 10 150 kV CURRENT TRANSFORMER FOR LINE BAY COMPLETE WITH 6 unit 6 unit 69,553,240 417,319,442 1,071,767 6,430,605 2,381,705 14,290,232 438,040,279.43
CLAMPS AND SUPPORTING STRUCTURE COMPRISING :
CORE 1 : 1000-2000/1 A, CLASS X FOR MAIN PROTECTION (DISTANCE PROTECTION).
CORE 2 : 1000-2000/1 A, 30 VA CLASS 5P20, + CLASS 0.2 FOR BACKUP PROTECTION
INSTRUMEN, METERING AND CONTROL DEVICES
CORE 3 : 2000-4000/1 A, CLASS X FOR CHECK BUS ZONE PROTECTION
CORE 4 : 2000-4000/1 A, CLASS X FOR MAIN BUS ZONE PROTECTION.
2 . 11 150 kV CAPACITOR VOLTAGE TRANSFORMER WITH 2 SECONDARY WINDING, 6 unit 6 unit 69,710,433 418,262,598 1,071,767 6,430,605 2,381,705 14,290,232 438,983,434.76
RATIO 150000V:V3 / 100V:V3 / 100V:V3, BURDEN 100 VA CL 0.2, 150 VA CL 3P,
MIN. CAPACITANCE 5000 PF, COMPLETE WITH CLAMPS, SUPPORTING STRUCTURE
2 . 12 LINE TRAP COMPLETE WITH SUPPORTING POST INSULATORS AND ALL NECESSARY FIXINGS 2 sets 2 sets 136,114,463 272,228,927 1,071,767 2,143,535 2,381,705 4,763,411 279,135,872.49
AND AUXILLIARY ITEMS OF EQUIPMENT 2000 A, 40 kA, 1.0 mH
2 . 13 150 kV LIGHTNING ARRESTER, 20 kA, COMPLETE WITH CLAMP, 6 unit 6 unit 32,861,878 197,171,268 1,071,767 6,430,605 2,381,705 14,290,232 217,892,104.49
SUPPORTING STRUCTURE AND SURGE COUNTER.
2 . 14 PROTECTION & CONTROL CUBICLE FOR OHL LINE I AND LINE II COMPRISING: 2 sets 2 sets 585,185,016 1,170,370,032 2,977,132 5,954,263 8,931,395 17,862,790 1,194,187,085.90
- IED MAIN LINE PROTECTION (DISTANCE, AUTORECLOSE, SYNCHROCHECK, ...ETC)
- IED BACKUP PROTECTION (OC, DEF, DFR, FAULT LOCATER, METERING, ...ETC)
- IED BAY CONTROL
- ETHERNET SWITCH FR INTER-BAY SYSTEM-1
- ETHERNET SWITCH FR INTER-BAY SYSTEM-2
INCLUDING MISELLANEOUS EQUIPMENT, MIMIC DIAGRAM AND MATERIAL, RACK CABINET, CABLES
CLAMPS, CONNECTORS, COMPRESSION TERMINAL, CONNECTIN TO INDIVIDUAL ITEMS OF
EQUIPMENT, TEST TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER ....ETC,
TO COMPLETE THE SCOPE OF WORKS.
2 . 15 MARSHALLING KIOSK FOR LINE BAY 2 sets 2 sets 49,122,674 98,245,348 1,071,767 2,143,535 2,977,132 5,954,263 106,343,145.96
BIDDER :
FINAL REV 01 Page 8 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
3 . 2 150 KV DOUBLE TENSION STRING INSULATOR SET 120 kN MIN. 5.270 MM CREEPAGE DISTANCE 18 sets 18 sets 7,706,008 138,708,141 59,543 1,071,767 595,426 10,717,674 150,497,582.31
COMPLETE WITH FITTINGS FOR INSTALLATION OF THE LINE BAY AS SPECIFIED.
3 . 3 150 KV SINGLE SUSPENSION STRING INSULATOR SET 120 kN MIN. 5.270 MM CREEPAGE 6 sets 6 sets 3,847,645 23,085,870 59,543 357,256 476,341 2,858,046 26,301,172.70
DISTANCE COMPLETE WITH FITTINGS FOR INSTALLATION OF THE LINE BAY AS SPECIFIED.
3 . 4 150KV POST INSULATOR COMPLETE WITH CLAMPS AND SUPPORTING 3 sets 3 sets 10,181,791 30,545,372 893,140 2,679,419 1,786,279 5,358,837 38,583,627.43
STRUCTURE FOR DROPPER TO BUS DISCONNECTOR
3 . 5 SET OF CLAMPS, CONNECTORS AND ACCESSORIES FOR THE INSTALLATION OF 2 bays 2 bays 83,359,689 166,719,378 1,786,279 3,572,558 8,931,395 17,862,790 188,154,726.34
THE LINE BAY AS SPECIFIED FOR LINE BAY. -
3 . 6 SET OF CONDUCTOR FOR SHIELD WIRE AND ACCESSORIES FOR INSTALLATION OF 0 bays 0 bays - - 4,763,411 - 12,003,795 - -
THE LINE BAY SHIELD WIRE AS SPECIFIED FOR LINE BAY.
3 . 7 150 kV 3 PHASE DISCONNECTING SWITCH MOTOR OPERATED, 40 kA 4000 A WITHOUT 4 unit 4 unit 132,327,552 529,310,207 4,167,984 16,671,938 7,145,116 28,580,465 574,562,609.90
EARTHING SWITCH, COMPLETE WITH CLAMPS AND SUPPORTING STRUCTURE FOR LINE BAY.
3 . 8 150 kV 3 PHASE DISCONNECTING SWITCH MOTOR OPERATED, 40 kA 4000 A WITH 2 unit 2 unit 156,560,213 313,120,427 4,167,984 8,335,969 7,145,116 14,290,232 335,746,628.07
EARTHING SWITCH, COMPLETE WITH CLAMPS AND SUPPORTING STRUCTURE FOR LINE BAY.
3 . 9 150 kV 3 PHASE SF6 CIRCUIT BREAKER 40 kA 4000 A, COMPLETE 2 unit 2 unit 738,319,742 1,476,639,483 5,358,837 10,717,674 8,931,395 17,862,790 1,505,219,947.91
WITH CLAMPS AND SUPPORTING STRUCTURE FOR LINE BAY.
3 . 10 150 kV CURRENT TRANSFORMER FOR LINE BAY COMPLETE WITH 6 unit 6 unit 69,553,240 417,319,442 1,071,767 6,430,605 2,381,705 14,290,232 438,040,279.43
CLAMPS AND SUPPORTING STRUCTURE COMPRISING :
CORE 1 : 2000-1000/1 A, CLASS X FOR MAIN PROTECTION (DISTANCE PROTECTION).
CORE 2 : 2000-1000/1 A, 30 VA CLASS 5P20, + CLASS 0.2 FOR BACKUP PROTECTION
INSTRUMEN, METERING AND CONTROL DEVICES
CORE 3 : 4000-2000/1 A, CLASS X FOR CHECK BUS ZONE PROTECTION
CORE 4 : 4000-2000/1 A, CLASS X FOR MAIN BUS ZONE PROTECTION.
BIDDER :
FINAL REV 01 Page 9 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
3 . 12 LINE TRAP COMPLETE WITH SUPPORTING POST INSULATORS AND ALL NECESSARY FIXINGS 2 sets 2 sets 136,114,463 272,228,927 1,071,767 2,143,535 2,381,705 4,763,411 279,135,872.49
AND AUXILLIARY ITEMS OF EQUIPMENT 2000 A, 40 kA, 1.0 mH.
3 . 13 150 kV LIGHTNING ARRESTER, 20 kA, COMPLETE WITH CLAMP, 6 unit 6 unit 3,261,746 19,570,473 1,071,767 6,430,605 2,381,705 14,290,232 40,291,310.20
SUPPORTING STRUCTURE AND SURGE COUNTER.
3 . 14 PROTECTION & CONTROL CUBICLE FOR OHL LINE III AND LINE IV COMPRISING: 2 sets 2 sets 585,185,016 1,170,370,032 2,977,132 5,954,263 8,931,395 17,862,790 1,194,187,085.90
- IED MAIN LINE PROTECTION (DISTANCE, AUTORECLOSE, SYNCHROCHECK, ...ETC)
- IED BACKUP PROTECTION (OC, DEF, DFR, FAULT LOCATER, METERING, ...ETC)
- IED BAY CONTROL
- ETHERNET SWITCH FR INTER-BAY SYSTEM-1
- ETHERNET SWITCH FR INTER-BAY SYSTEM-2
INCLUDING MISELLANEOUS EQUIPMENT, MIMIC DIAGRAM AND MATERIAL, RACK CABINET, CABLES
CLAMPS, CONNECTORS, COMPRESSION TERMINAL, CONNECTIN TO INDIVIDUAL ITEMS OF
EQUIPMENT, TEST TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER ....ETC,
TO COMPLETE THE SCOPE OF WORKS.
3 . 15 MARSHALLING KIOSK FOR LINE BAY 2 sets 2 sets 49,122,674 98,245,348 1,071,767 2,143,535 2,977,132 5,954,263 106,343,145.96
3 . 16 LV POWER CABLE, CONTROL CABLE AND ACCESSORIES AND NECESSARY EQUIPMENT 2 bays 2 bays 208,399,222 416,798,444 4,763,411 9,526,822 14,885,659 29,771,317 456,096,583.47
(CABLE LADDER, CLAMP, CABLE LUG, TERMINAL, … ETC)
FOR LINE BAY TO COMPLETE THE SCOPE OF WORK
4 . 2 150 KV SINGLE TENSION STRING INSULATOR SET 120 kN MIN. 5.270 MM CREEPAGE DISTANCE 12 sets 12 sets 3,847,645 46,171,741 59,543 714,512 476,341 5,716,093 52,602,345.39
FITTINGS FOR INSTALLATION OF THE LINE BAY AS SPECIFIED.
4 . 3 150 KV SINGLE SUSPENSION STRING INSULATOR SET 120 kN MIN. 5.270 MM CREEPAGE DISTANC 6 sets 6 sets 3,847,645 23,085,870 59,543 357,256 476,341 2,858,046 26,301,172.70
COMPLETE WITH FITTINGS FOR INSTALLATION OF THE LINE BAY AS SPECIFIED.
BIDDER :
FINAL REV 01 Page 10 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
4 . 5 SET OF CLAMPS, CONNECTORS AND ACCESSORIES FOR THE 2 bay 2 bay 83,359,689 166,719,378 1,786,279 3,572,558 8,931,395 17,862,790 188,154,726.34
INSTALLATION OF THE TRAFO BAY AS SPECIFIED.
4 . 6 SET OF CONDUCTOR FOR SHIELD WIRE AND ACCESSORIES FOR INSTALLATION OF 0 bay 0 bay - - 4,763,411 - 12,003,795 - -
THE TRAFO BAY SHIELD WIRE AS SPECIFIED.
4 7 150 kV 3 PHASE DISCONNECTING SWITCH MOTOR OPERATED, 1600 A 40 kA WITHOUT EARTHING 4 unit 4 unit 101,782,180 407,128,721 4,167,984 16,671,938 7,145,116 28,580,465 452,381,123.05
SWITCH, COMPLETE WITH CLAMPS AND SUPPORTING STRUCTURE FOR TRANSFORMER BAY.
4 . 8 150 kV 3 PHASE SF6 CIRCUIT BREAKER 1600 A 40 kA, COMPLETE WITH CLAMPS AND 2 unit 2 unit 399,955,322 799,910,643 5,358,837 10,717,674 8,931,395 17,862,790 828,491,107.90
SUPPORTING STRUCTURE FOR TRANSFORMER BAY.
4 . 9 150 kV CURRENT TRANSFORMER FOR TRANSFORMER BAY COMPLETE WITH CLAMPS AND 6 unit 6 unit 125,821,030 754,926,182 1,071,767 6,430,605 2,381,705 14,290,232 775,647,019.41
SUPPORTING STRUCTURE COMPRISING :
CORE 1 : 150-300/1 A, CLASS X FOR MAIN TRANSFORMER PROTECTION AND RESTRICTED
EARTH FAULT PROTECTION.
CORE 2 : 150-300/1 A, 30 VA CLASS 5P20 + CLASS 0.2 FOR BACK UP PROTECTION EARTH
FAULT PROTECTION, INSTRUMENT, METERING AND CONTROL DEVICES.
CORE 3 : 2000-4000/1 A, CLASS X FOR CHECK BUS ZONE PROTECTION.
CORE 4 : 2000-4000/1 A, CLASS X FOR MAIN BUS BAR PROTECTION.
4 . 10 150 kV LIGHTNING ARRESTER, 20 kA, COMPLETE WITH CLAMP, 6 unit 6 unit 32,861,878 197,171,268 1,071,767 6,430,605 2,381,705 14,290,232 217,892,104.49
SUPPORTING STRUCTURE AND SURGE COUNTER.
4 . 11 PROTECTION & CONTROL CUBICLE FOR OHL 150/20 kV TRANSFORMATOR BAY COMPRISING: 2 set 2 set 558,176,477 1,116,352,954 2,977,132 5,954,263 8,931,395 17,862,790 1,140,170,007.50
- IED MAIN TRANSFORMER PROTECTION (DIFFERENTIAL, REF HV/LV SIDE, DFR, ...ETC).
- IED BACKUP PROTECTION (OC, EF, SEF, OV, UV, FR, METERING, ...ETC).
- IED BAY CONTROL.
- IED AUTOMATIC VOLTAGE REGULATOR
- ETHERNET SWITCH FOR INTER-BAY SYSTEM-1.
- ETHERNET SWITCH FOR INTER-BAY SYSTEM-2.
INCLUDING MISELLANEOUS EQUIPMENT, MIMIC DIAGRAM AND MATERIAL, RACK CABINET, AVR,
CABLES CLAMPS, CONNECTORS, COMPRESSION TERMINAL, CONNECTIN TO INDIVIDUAL
ITEMS OF EQUIPMENT, TEST TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER,
ETC..., TO COMPLETE THE SCOPE OF WORKS.
4 . 12 BAY CONTROL UNIT FOR IBT 1&2 COMPLETE WITH MONITORING, MIMIC DIAGRAM, RACK CABINE 0 set 0 set - - 2,977,132 - 8,931,395 - -
CLAMPS, CONNECTOR, INTERIOR LAMP, HEATER, ... ETC TO COMPLETE THE SCOPE OF WORK.
BIDDER :
FINAL REV 01 Page 11 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
4 . 14 LV POWER CABLE, CONTROL CABLE ACCESSORIES AND NECESSARY EQUIPMENT NECESSARY 2 bay 2 bay 208,399,222 416,798,444 4,763,411 9,526,822 14,885,659 29,771,317 456,096,583.47
EQUIPMENT (CABLE LADDER, CLAMP, CABLE LUG, TERMINAL, … ETC) FOR TRAFO BAY TO COMPLETE
THE SCOPE OF WORK. NOTE: 1 LOT FOR TRAFO 60 MVA AND 1 LOT FOR SST EXISTING.
5 . 2 150 KV DOUBLE TENSION STRING INSULATOR SET 120 kN MIN. 5.270 MM CREEPAGE DISTANCE 6 sets 6 sets 7,706,008 46,236,047 59,543 357,256 595,426 3,572,558 50,165,860.77
COMPLETE WITH FITTINGS FOR INSTALLATION OF THE LINE BAY AS SPECIFIED.
5 . 3 150 KV SINGLE SUSPENSION STRING INSULATOR SET 120 kN MIN. 5.270 MM CREEPAGE 6 sets 6 sets 3,847,645 23,085,870 59,543 357,256 476,341 2,858,046 26,301,172.70
DISTANCE COMPLETE WITH FITTINGS FOR INSTALLATION OF THE LINE BAY AS SPECIFIED.
5 . 4 150KV POST INSULATOR COMPLETE WITH CLAMPS AND SUPPORTING 0 set 0 set - - 893,140 - 1,786,279 - -
STRUCTURE FOR DROPPER TO BUS DISCONNECTOR
5 . 5 SET OF CLAMPS, CONNECTORS AND ACCESSORIES FOR THE 1 bay 1 bay 83,359,689 83,359,689 1,786,279 1,786,279 8,931,395 8,931,395 94,077,363.17
INSTALLATION OF THE BUS-COUPLER BAY AS SPECIFIED. (EXISTING)
5 . 6 SET OF CONDUCTOR FOR SHIELD WIRE AND ACCESSORIES FOR 0 bay 0 bay - - 4,763,411 - 12,003,795 - -
INSTALLATION OF THE BUS-COUPLER BAY SHIELD WIRE AS SPECIFIED
5 . 7 150 kV 3 PHASE DISCONNECTING SWITCH MOTOR OPERATED, 4000 A 40 kA WITHOUT 2 unit 2 unit 132,327,552 264,655,104 4,167,984 8,335,969 7,145,116 14,290,232 287,281,304.95
EARTHING SWITCH, COMPLETE WITH CLAMPS AND SUPPORTING STRUCTURE
FOR BUS-COUPLER BAY.
5 . 8 150 kV 3 PHASE SF6 CIRCUIT BREAKER 4000 A 40 kA, COMPLETE WITH CLAMPS AND 1 unit 1 unit 583,675,610 583,675,610 5,358,837 5,358,837 8,931,395 8,931,395 597,965,842.55
SUPPORTING STRUCTURE FOR BUS-COUPLER BAY.
5 . 9 150 kV CURRENT TRANSFORMER FOR BUS-COUPLER BAY COMPLETE WITH 3 unit 3 unit 69,553,240 208,659,721 1,071,767 3,215,302 2,381,705 7,145,116 219,020,139.71
CLAMPS AND SUPPORTING STRUCTURE COMPRISING :
CORE 1 : 2000-4000/1 A, CLASS X FOR MAIN BUSBAR PROTECTION
5 . 10 150 kV CURRENT TRANSFORMER FOR BUS-COUPLER BAY COMPLETE WITH 3 unit 3 unit 69,553,240 208,659,721 1,071,767 3,215,302 2,381,705 7,145,116 219,020,139.71
CLAMPS AND SUPPORTING STRUCTURE COMPRISING :
CORE 1 : 2000-4000/1 A, CLASS 5P20 +CLASS 0.2 FOR OVER CURRENT
PROTECTION, EARTH FAULT PROTECTION AND INSTRUMENT
CORE 2 : 2000-4000/1 A, CLASS X FOR MAIN BUSBAR PROTECTION
BIDDER :
FINAL REV 01 Page 12 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
5 . 12 150 kV CAPACITOR VOLTAGE TRANSFORMER WITH 2 SECONDARY WINDING, 2 unit 2 unit 69,710,433 139,420,866 1,071,767 2,143,535 2,381,705 4,763,411 146,327,811.59
RATIO 150000V:V3 / 100V:V3 / 100V:V3, BURDEN 100 VA CL 0.2, 150 VA CL 3P,
MIN. CAPACITANCE 5000 PF, COMPLETE WITH CLAMPS, SUPPORTING STRUCTURE.
5 . 13 MARSHALLING KIOSK FOR BUS-COUPLER BAY 1 bay 1 bay 49,122,674 49,122,674 1,071,767 1,071,767 2,977,132 2,977,132 53,171,572.98
5 . 16 LV POWER CABLE, CONTROL CABLE ACCESSORIES AND NECESSARY EQUIPMENT 1 bay 1 bay 208,399,222 208,399,222 4,763,411 4,763,411 14,885,659 14,885,659 228,048,291.73
(CABLE LADDER, CLAMP, CABLE LUG, TERMINAL, ETC...) FOR BUS COUPLER
TO COMPLETE THE SCOPE OF WORK.
SUB TOTAL A5 3,676,984,992 35,368,325 88,897,154 3,801,250,471.35
7 . 2 BATTERY CHARGER MIN 60 A FOR 110 VDC BATTERY COMPLETE WITH PANEL BOARD AND 1 set 1 set 185,077,861 185,077,861 178,628 178,628 1,190,853 1,190,853 186,447,341.28
INCLUDING 3 STEPS VOLTAGE DROPPER (SUBJECT TO CALCULATION).
7 . 3 110 VDC SWITCH FUSE DISTRIBUTION BOARD SUITABLE FOR 110 VDC BATTERY SET, 1 set 1 set 53,588,371 53,588,371 178,628 178,628 595,426 595,426 54,362,425.68
HV EQUIPMENT OF MINIMUM 10 BAYS, MV SWITCHGEARS, ... ETC TO COMPLETE
THE SPECIFIED SCOPE OF WORK, INCLUDING NECESSARY SPARE MCB.
BIDDER :
FINAL REV 01 Page 13 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
7 . 5 20/0.4 KV MINIMUM 200 kVA 3-PHASE STATION AUXILIARY TRANSFORMER 1 set 1 set 117,894,417 117,894,417 1,786,279 1,786,279 5,954,263 5,954,263 125,634,959.68
COMPLETE WITH NECESSARY ACCESSORIES (VECTOR GROUP DYn 5).
7 . 6 SUITABLE LV POWER CABLES AND NECESSARY EQUIPMENT CABLE LADDER, CLAMP, 1 lot 1 lot 104,199,611 104,199,611 4,763,411 4,763,411 14,885,659 14,885,659 123,848,680.63
CABLE LUG, TERMINAL, ... ETC. FOR SUBSTATION AUXILIARIES SUPPLY TO COMPLETE
THE SPECIFIED SCOPE OPF WORK.
8 . 2 SINGLE PHASE NEUTRAL CT FOR 20 KV SIDE CLASS X, 1000-2000/5 A COMPLETE WITH CLAMPS 2 unit 2 unit 26,794,186 53,588,371 119,085 238,171 1,190,853 2,381,705 56,208,247.36
FOR RESTRICTED EARTH FAULT PROTECTION SUITABLE FOR MOUNTING OUTDOOR
TRANSFORMER TANK OR CAN BE PUT INSIDE THE 20 KV NEUTRAL EARTHING RESISTOR CUBICLE.
8 . 3 SINGLE PHASE NEUTRAL CT FOR 20 KV SIDE CLASS 5P20, 1000-2000/5 A COMPLETE WITH CLAM 2 unit 2 unit 26,794,186 53,588,371 119,085 238,171 1,190,853 2,381,705 56,208,247.36
FOR NEUTRAL EARTH FAULT PROTECTION SUITABLE FOR MOUNTING OUTDOOR ON
TRANSFORMER TANK OR CAN BE PUT INSIDE THE 20 KV NEUTRAL EARTHNG RESISTOR CUBICLE.
8 . 4 SINGLE PHASE NEUTRAL CT FOR 150 KV SIDE CLASS X 150-300/1 A COMPLETE WITH CLAMPS 2 unit 2 unit 26,794,186 53,588,371 119,085 238,171 1,190,853 2,381,705 56,208,247.36
FOR RESTRICTD EARTH FAULT PROTECTION SUITABLE FOR MOUNTING OUTDOOR ON
TRANSFORMER TANK.
8 . 5 20 KV STAINLESS STEEL NEUTRAL EARTHING RESISTOR RATED 12 OHMS, 10 SECONDS. 2 set 2 set 186,070,734 372,141,468 297,713 595,426 2,381,705 4,763,411 377,500,305.37
8 . 6 TRANSFORMER BLAST AND FIRE PREVENTION EQUIPMENT. 2 set 2 set 497,456,580 994,913,160 2,977,132 5,954,263 119,085,270 238,170,540 1,239,037,963.09
9 . 2 CABLE SUPPORT FOR 20 KV POWER CABLE, 20 KV POST INSULATOR, METAL BARS, 1 set 1 set 59,542,635 59,542,635 119,085 119,085 595,426 595,426 60,257,146.54
BIDDER :
FINAL REV 01 Page 14 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
9 . 4 2 x 630 SQMM ALU 20 KV XLPE SINGEL CORE POWER CABLE/PHASE BETWEEN BUS-SECTION 1 lot 1 lot 39,298,139 39,298,139 119,085 119,085 1,190,853 1,190,853 40,608,077.01
CUBICLE AND INTERFACE CUBICLE, INCLUDING CABLE TERMINATIONS AND ACCESSORIES FOR
CONNECTION BETWEEN SETS OF 20 KV SWITCHGEAR TO COMPLETE THE SPECIFIED SCOPE OF
WORK (TOTAL CABLE LEGTH IS APPOX 3 x 2 x 20 M)
9 . 5 SUITABLE LV POWER CABLE, CONTROL CABLE AD NECESSARY EQUIPMENT FOR SUBSTATION 1 lot 1 lot 104,199,611 104,199,611 4,763,411 4,763,411 14,885,659 14,885,659 123,848,680.63
AUXILIARY SUPPLY TO COMPLETE THE SPECIFIED SCOPE OF WORK.
B SUBSTATION AUTOMATION
1 SUBSTATION AUTOMATION HARDWARE
1 . 1 OPERATOR WORK STATION CONSIST OF CPU, KEYBOARD & MOUSE, VDU, ...ETC. 1 lot 1 lot 929,865,421 929,865,421 2,977,132 2,977,132 89,313,952 89,313,952 1,022,156,505.10
Server, minimum 2,67 GHz, RAM 4GB,HD 2x500 GB, Windows, VDU LCD (17"), KVM extender -
1 . 2 LONGGER PRINTER. 1 set 1 set - - - - - - -
1 . 3 COLOUR LASER PRINTER 1 set 1 set - - - - - - -
1 . 4 GPS TIME REFERNCE CLOCK 1 set 1 set - - - - - - -
1 . 5 GATE WAY 1 set 1 set - - - - - - -
1 . 6 MODEM 2 sets 2 sets - - - - - - -
1 . 7 ETHERNET SWITCH FOR INTER-BAY SYSTEM-1. 1 lot 1 lot - - - - - - -
1 . 8 ETHERNET SWITCH FOR INTER-BAY SYSTEM-2. 0 lot 0 lot - - - - - - -
1 . 9 ETHERNET SWITCH FOR CONNECTION TO WAN. 1 set 1 set - - - - - - -
Switch ring menggunakan cooper redundant -
BIDDER :
FINAL REV 01 Page 15 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
BIDDER :
FINAL REV 01 Page 16 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
5 DC POWER SUPPLAY
5 . 1 48 VDC BATTERY SUITABLE FOR SUPPLYING ALL 48 VDC FOR 8 HOURS DISCHARGE 1 set 1 set 93,976,855 93,976,855 595,426 595,426 2,977,132 2,977,132 97,549,413.30
(MINIMUM CAPACITY IS 240 AH 48 VDC, SUBJECT TO CALCULATION).
5 . 2 BATTERY CHARGER MIN 100 A FOR 48 VDC BATTERY COMPLETE WITH PANEL BOARD AND 1 set 1 set 107,558,292 107,558,292 297,713 297,713 1,190,853 1,190,853 109,046,857.93
INCLUDING 3 STEPS VOLTAGE DROPPER (SUBJECT TO CALCULATION).
5 . 3 48 VDC SWITCH FUSE DISTRIBUTION BOARD SUITABLE FOR 48 VDC BATTERY SET, 1 set 1 set 47,634,108 47,634,108 178,628 178,628 595,426 595,426 48,408,162.19
HV EQUIPMENT OF MINIMUM 10 BAYS, MV SWITCHGEAR, ... ETC TO COMPLETE THE SPECIFIED
INCLUDING NECESSARY SPARE MCB.
6 TELECOMUNICATION EQUIPMENT
6 . 1 NODE SDH-ADM 2 sets 2 sets 94,176,847 188,353,694 1,190,853 2,381,705 20,839,922 41,679,844 232,415,243.85
6 . 2 STM-4 LINE INTERFACE (2 PORTS) 2 ports 2 ports 54,523,381 109,046,763 - - - - 109,046,762.66
6 . 3 2 MB INTERFACE (8 PORTS) 2 ports 2 ports 4,337,014 8,674,028 - - - - 8,674,028.15
6 . 4 2 MB DIGITAL BRANCHING 2 sets 2 sets 40,644,743 81,289,487 - - - - 81,289,486.74
6 . 5 DIU DATA INTERFACING UNIT 64 KBPS (4 PORTS) 2 ports 2 ports 54,523,381 109,046,763 - - - - 109,046,762.66
6 . 6 VF 2/4 WIRE E/M INTERFACE (MIN 6 PORTS) 2 ports 2 ports 6,443,680 12,887,360 - - - - 12,887,360.27
6 . 7 VF/SUBSC INTERFACE (MIN 6 PORTS) 2 ports 2 ports 11,895,975 23,791,951 - - - - 23,791,950.79
6 . 8 MAIN DISTRIBUTION FRAME 2 sets 2 sets 15,464,747 30,929,493 - - - - 30,929,493.16
6 . 9 RACK/CABINET 1 lot 1 lot 40,644,743 40,644,743 - - - - 40,644,743.37
6 . 10 DIGITAL TELEPROTECTION 2 sets 2 sets 89,220,137 178,440,274 - - - - 178,440,274.00
6 . 11 PAX (8 TRUNKS - 8 SUBCRIBES) COMPLETE WITH TELEPHONE SET OF EACH SUBSCRIBER 0 set 0 set 187,802,591 - - - - - -
6 . 12 MISCELLANEOUS EQUIPMENT AND MATERIAL INCLUDING CABLES, PATCH CORD, PIG TAIL, 1 lot 1 lot 15,297,872 15,297,872 - - - - 15,297,872.39
TELEPHONE CABLE, CONNECTORS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS
OF EQUIPMENT, ETC, TO COMPLETE THE SCOPE OF WORK.
BIDDER :
FINAL REV 01 Page 17 of 60
SIGNATURE :
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GI 150 KV SUKATANI GOBEL
150 KV SUKATANI GOBEL
1 . 2 MISCELLANEOUS EQUIPMENT AND MATERIAL REQUIRED FOR COMPLETION THE SCOPE OF WO 1 lot 1 lot 2,679,419 2,679,419 119,085 119,085 595,426 595,426 3,393,930.19
FOR CCTV SYSTEM.
1 . 3 FAULT RECORDER EQUIPMENT FREE STANDING STEEL SHEET CUBICLE EQUIPPED WITH THE 2 sets 2 sets 218,279,405 436,558,810 119,085 238,171 1,786,279 3,572,558 440,369,538.46
FOLLOWINGS :
- FAULT RECORDING EQUIPMENT COMPRISING NECESSARY QUANTITY OF FAULT RECORDERS
EQUIPPED WITH OSCILLOGRAPH PRINTER TO RECORD THE INFORMATION OF THE 150 KV
SIDE AS SPECIFIED.
- THE RECORDER SHALL PROVIDED WITH DATE AND TIME INDICATORS AND TIME
SYNCHRONIZING EQUIPMENT CLOCK VIA SATELITE.
1 . 4 INTERFACE MARSHALLING CUBICLE FOR SCADA MINIMUM FOR 10 BAYS. 0 set 0 set - - 119,085 - 2,977,132 - -
- FREE STANDING SHEET STEEL CUBICLE FOR MARSHALLING AND TERMINATING
ALL CONNECTIONS BETWEEN SCADA AND THE CONTROL, RELAY AND
TELECOMMUNICATION IN THE SUBSTATION BUILDING.
- THE CUBICLE SHALL BE EQUIPPED WITH NECESSARY NUMBER OF TERMINAL
AND CABLE GLANDS.
1 . 5 MISCELLANEOUS EQUIPMENT AND MATERIAL REQUIRED FOR COMPLETION THE SCOPE OF WOR 0 lot 0 lot - - - - - - -
FOR FAULT RECORDING.
TOTAL D - - - -
BIDDER :
FINAL REV 01 Page 18 of 60
SIGNATURE :
GARDU INDUK 150 KV SUKATANI GOBEL
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
Name of Bidder :
Total Civil work 19 of 1
REV.01
RAB GI 150 KV SUKATANI GOBEL
Signature of Bidder :
GARDU INDUK 150 KV SUKATANI GOBEL
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 1 : CONTROL BUILDING
I PREPARATION WORK
1 Building Permit ( Ijin Mendirikan Bangunan / IMB ) ls 1.00 28,461,379 28,461,379
2 Site clearing m2 181.25 7,315 1,325,767
3 Setting survey and installation of setting plan ls 1.00 11,384,552 11,384,552
4 Site office ( 4m x 6 m ) ls 1.00 20,492,193 20,492,193
5 Site storage ( 4 m x 10 m ) ls 1.00 22,769,104 22,769,104
6 Soil investigation for controle building :
SPT, DCPT, Core Drilling and Test Lab ls 1.00 8,538,414 8,538,414
Report Sets 3.00 1,707,683 5,123,048
II EARTH WORK
1 Excavation work m3 357.08 40,131 14,329,815
2 Backfiil m3 225.11 23,737 5,343,389
3 Sand layer ( compacted sand, thickness 10 cm ) m3 5.53 179,477 992,151
Name of Bidder :
CBL-150kV 20 of 60
REV.01
RAB GI 150KV SUKATANI GOBEL
Signature of Bidder :
GARDU INDUK 150 KV SUKATANI GOBEL
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 1 : CONTROL BUILDING
VI SANITARY WORK
1 Bath basin complete with accessories No 1.00 174,831 174,831
2 Squatting water closed complete with accessories No 1.00 312,777 312,777
3 Wash basin complete with accessories No 1.00 5,209,002 5,209,002
4 Installation of water supply pipe PVC dia 1/2 inc complete with clamp ls 1.00 147,999 147,999
and accessories
5 Installation of water waste pipe PVC dia 3 inc complete with clamp ls 1.00 1,604,152 1,604,152
and accessories -
6 Water tank and jet pump 500 watt included steel structures tower unit 1.00 1,366,146 1,366,146
( cap : 1 m3 ) and installation of pipe -
7 Septictank cap 1.5 m3 included infiltrate cap 2 m3 complete with
palm fibre and sand stone unit 1.00 2,837,530 2,837,530
-
VII PAINTING WORK
1 Steel painting m2 22.00 65,951 1,450,916
2 Wall and celling painting m2 954.68 22,843 21,807,854
IX CABLE DUCT
1 Concrete cable duct ( K 175; Fe : 100 kg m3 )
included galvanized cable tray steel anggle 50.50.4 and plate bordes m -
for type cable duct I -
2 Concrete cable duct ( K 175; Fe : 100 kg m3 )
included galvanized cable tray steel anggle 50.50.4 and plate bordes m 20.57 2,922,227 60,110,201
for type cable duct II -
3 Concrete cable duct ( K 175; Fe : 100 kg m3 )
included galvanized cable tray steel anggle 50.50.4 and plate bordes m 6.75 2,922,227 19,733,796
for type cable duct III -
4 Concrete cable duct ( K 175; Fe : 100 kg m3 )
included galvanized cable tray steel anggle 50.50.4 and plate bordes m 23.19 2,922,227 67,751,824
for type cable duct IV -
5 Concrete cable duct ( K 175; Fe : 100 kg m3 )
included galvanized cable tray steel anggle 50.50.4 and plate bordes m
for type cable duct V
Name of Bidder :
CBL-150kV 21 of 60
REV.01
RAB GI 150KV SUKATANI GOBEL
Signature of Bidder :
GARDU INDUK 150 KV SUKATANI GOBEL
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 1 : CONTROL BUILDING
XI LIGHTNING PROTECTION
1 Arder/ground rod icluded pipa and cable BC 25 mm2 and all accessories Lot 1.00 5,692,276 5,692,276
clamps steel plate, material support and pole, grounding system for
controle building
Name of Bidder :
CBL-150kV 22 of 60
REV.01
RAB GI 150KV SUKATANI GOBEL
Signature of Bidder :
GARDU INDUK 150 KV SUKATANI GOBEL
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 1 : 20 KV ROOM
I PREPARATION WORK
1 Building Permit ( Ijin Mendirikan Bangunan / IMB ) ls 1.00 28,461,379 28,461,379
2 Site clearing m2 312.50 7,315 2,285,805
3 Setting survey and installation of setting plan ls 1.00 11,384,552 11,384,552
4 Site office ( 4m x 6 m ) ls 1.00 20,492,193 20,492,193
5 Site storage ( 4 m x 10 m ) ls 1.00 22,769,104 22,769,104
6 Soil investigation for controle building :
SPT, DCPT, Core Drilling and Test Lab ls 1.00 8,538,414 8,538,414
Report Sets 1.00 1,707,683 1,707,683
II EARTH WORK
1 Excavation work m3 618.93 40,131 24,837,998
2 Backfiil m3 390.19 23,737 9,261,858
3 Sand layer ( compacted sand ) m3 6.32 179,477 1,135,015
Name of Bidder :
CBL-20kV 23 of 60
REV.01
RAB GI 150KV SUKATANI GOBEL
Signature of Bidder :
GARDU INDUK 150 KV SUKATANI GOBEL
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 1 : 20 KV ROOM
VI SANITARY WORK
1 Bath basin complete with accessories No 1.00 174,831 174,831
2 Squatting water closed complete with accessories No 1.00 312,777 312,777
3 Wash basin complete with accessories No 1.00 5,209,002 5,209,002
4 Installation of water supply pipe PVC dia 1/2 inc complete with clamp ls 1.00 147,999 147,999
and accessories
5 Installation of water waste pipe PVC dia 3 inc complete with clamp ls 1.00 1,604,152 1,604,152
and accessories
6 Water tank and jet pump 500 watt included steel structures tower unit 1.00 1,366,146 1,366,146
( cap : 1 m3 ) and installation of pipe
7 Septictank cap 1.5 m3 included infiltrate cap 2 m3 complete with
palm fibre and sand stone unit 1.00 2,837,530 2,837,530
IX CABLE DUCT
1 Concrete cable duct ( K 175; Fe : 100 kg m3 )
included galvanized cable tray steel anggle 50.50.4 and plate bordes m 41.95 2,922,227 122,587,406
for type cable duct I
2 Concrete cable duct ( K 175; Fe : 100 kg m3 )
included galvanized cable tray steel anggle 50.50.4 and plate bordes m 11.20 2,922,227 32,728,938
for type cable duct II
3 Concrete cable duct ( K 175; Fe : 100 kg m3 )
included galvanized cable tray steel anggle 50.50.4 and plate bordes m -
for type cable duct III
4 Concrete cable duct ( K 175; Fe : 100 kg m3 )
included galvanized cable tray steel anggle 50.50.4 and plate bordes m 2.05 2,922,227 5,990,565
for type cable duct IV
5 Concrete cable duct ( K 175; Fe : 100 kg m3 )
included galvanized cable tray steel anggle 50.50.4 and plate bordes m
for type cable duct V
Name of Bidder :
CBL-20kV 24 of 60
REV.01
RAB GI 150KV SUKATANI GOBEL
Signature of Bidder :
GARDU INDUK 150 KV SUKATANI GOBEL
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 1 : 20 KV ROOM
XI LIGHTNING PROTECTION
1 Arder/ground rod icluded pipa and cable BC 25 mm2 and all accessories Lot 1.00 5,692,276 5,692,276
clamps steel plate, material support and pole, grounding system for
controle building
Name of Bidder :
CBL-20kV 25 of 60
REV.01
RAB GI 150KV SUKATANI GOBEL
Signature of Bidder :
GARDU INDUK 150 KV SUKATANI GOBEL
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 2 : SWITCHYARD FOR CIVIL WORKS
4LB, 2TB, 1BC, 1 SB
II Site Works
1 Earth Work
a. Site Clearing m2 7,056 7,315 51,611,638
b. Common Excavation m3 - -
c. Back fill with selected material m3 - -
d. Import fill with selected material m3 - -
e. Slope protection (stone masonry) m3 - -
f. Soil Disposal m3 - -
g. Plank name project unit 1 960,991 960,991
h. Fence security of project 2 m high m' 126 793,417 99,970,595
i. Bouwplank m' 364 76,205 27,738,745
2 Road (new)
a. Prepare compacted subgrade m2 - -
b. Macadam surface course m2 - -
c. Base structure (Sub base & Base coarse) m2 728 214,441 156,112,725
d. 50 mm Asphalt hot mix m2 728 16,508 12,017,533
e. 50 mm Asphalt penetration m2 - -
TOTAL II 1,854,713,264
(RUPIAH)
(RUPIAH)
402,070,059.61
1,181,466,000.00
1,583,536,060
(RUPIAH)
1,583,536,060
0
UNIT PRICE TOTAL PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4x5
1 Concrete Work
2 Reinforcement Work
3 Excavation Work
4 Filling Work
5 Steel Work
TOTAL -
- Material
- Triplex12 mm shett 1.00 153,691 153,691
- Beam meranti 6/12 frame 3.00 187,845 563,535
- Colour paint kg 2.00 22,769 45,538
- Nail kg 0.50 25,615 12,808
- Concrete 1 pc : 3 sand : 5 split m3 0.07 374,267 24,327
- Remuneration
- Paint worker man/day 1.00 62,615 62,615
- Worker man/day 2.00 45,538 91,076
- Supervisor man/day 0.10 74,000 7,400
799,900 161,091
960,991
- Material
- Dolken stick 1.00 31,308 31,308
- Plank meranti 2/20 sheet 0.07 187,845 13,149
- Zinc sheet 1.20 70,584 84,701
- Nail kg 0.50 25,615 12,808
- Remuneration
- Carpenter man/day 0.50 62,615 31,308
- Supervisor man/day 0.05 74,000 3,700
141,965 35,007
176,973
3 1 (one) m Bowplank
- Material
- Plank meranti 2/20 m3 0.01 3,016,906 30,169
- Tiang Pancang m 3
0.01 3,016,906 30,169
- Nail kg 0.25 25,615 6,404
- Remuneration
- Carpenter man/day 0.090 62,615 5,635
- Kepala Tukang man/day 0.020 74,000 1,480
- Worker man/day 0.028 45,538 1,275
- Supervisor man/day 0.015 74,000 1,073
66,742 9,463
76,205
4 1 m3 Excavation of Soil
- Material
- Sand m3 1.00 165,076 165,076
- Remuneration
- Worker man/day 0.30 45,538 13,661
- Supervisor man/day 0.01 74,000 740
165,076 14,401
1 m Compacted Sand layer (tebal 10 Cm)
2
179,477
9 1 m3 Brick 1 pc : 4 ps
- Material
- Red brick unit 500.00 569 284,614
- Portland cement (PC) kg 104.50 1,480 154,659
- Sand m3 0.41 165,076 67,021
- Remuneration
- Tukang man/day 1.50 62,615 93,923
- Kepala Tukang man/day 0.15 74,000 11,100
- Pekerja man/day 4.50 45,538 204,922
- Mandor man/day 0.38 74,000 27,750
506,294 337,694
843,988
10 1 m2 plaster cement 1 pc : 4 ps thickness 10 mm
- Material
- Portland cement (PC) kg 4.48 1,480 6,630
- Sand m3 0.02 165,076 2,641
- Remuneration
- Brick layer man/day 0.22 62,615 13,775
- Worker man/day 0.30 45,538 13,661
- Supervisor man/day 0.02 74,000 1,480
9,272 28,917
38,188
11 1 m2 Brafend 1 pc : 2 ps
- Material
- Portland cement (PC) kg 7.14 1,480 10,567
- Sand m3 0.01 165,076 1,882
- Remuneration
- Brick layer man/day 0.10 62,615 6,262
- Worker man/day 0.30 45,538 13,661
- Supervisor man/day 0.01 74,000 740
12,449 20,663
33,112
ANALISA HARGA SATUAN
PENGADAAN DAN PEMASANGAN PERALATAN GARDU INDUK 150 kV SUKATANI GAOBEL
- Material
- Portland cement (PC) kg 4.34 1,480 6,423
- Sand m3 0.04 165,076 6,603
- Remuneration
- Brick layer man/day 0.10 62,615 6,262
- Worker man/day 0.30 45,538 13,661
- Supervisor man/day 0.01 74,000 740
13,026 20,663
33,689
13 1 m3 Concrete 1 pc : 3 sand : 5 split
- Material
- Portland cement (PC) kg 237.00 1,480 350,758
- Sand m 3
0.57 165,076 94,093
- crushstone m3 0.95 176,461 167,638
- Equipment
- Concrete mixer hour 1.10 39,846 43,831
- Remuneration
- Tukang Batu man/day 0.50 62,615 31,308
- Pekerja man/day 6.00 45,538 273,229
- Supervisor man/day 0.30 74,000 22,200
- Kepala Tukang man/day 0.05 74,000 3,700
612,489 374,267
986,756
14 1 m3 Concrete K 175
- Material
- Portland cement (PC) kg 340.00 1,480 503,197
- Sand m3 0.54 165,076 89,141
- crushstone m3 0.85 176,461 150,344
- Equipment
- Concrete mixer hour 1.20 39,846 47,815
- Remuneration
- Brick layer man/day 1.00 62,615 62,615
- Worker man/day 6.00 45,538 273,229
- Supervisor man/day 0.30 74,000 22,200
742,683 405,859
1,148,542
15 1 m3 Concrete K 225
- Material
- Portland cement (PC) kg 407.00 1,480 602,357
- Sand m3 0.49 165,076 80,887
- crushstone m 3
0.81 176,461 142,933
- Equipment
- Concrete mixer hour 1.20 39,846 47,815
- Remuneration
- Brick layer man/day 1.00 62,615 62,615
- Worker man/day 6.00 45,538 273,229
- Supervisor man/day 0.30 74,000 22,200
ANALISA HARGA SATUAN
PENGADAAN DAN PEMASANGAN PERALATAN GARDU INDUK 150 kV SUKATANI GAOBEL
16 1 m3 Concrete K 500
- Material
- Portland cement (PC) kg 588.00 1,480 870,235
- Sand m3 0.50 165,076 83,198
- crushstone m3 0.66 176,461 117,170
- Equipment
- Concrete mixer hour 1.20 39,846 47,815
- Remuneration
- Brick layer man/day 1.00 62,615 62,615
- Worker man/day 6.00 45,538 273,229
- Supervisor man/day 0.30 74,000 22,200
1,070,603 405,859
1,476,463
17 1 m3 stone Masonry 1 PC : 2 Sand
- Material
- stone masonry m3 1.10 176,461 194,107
- Portland cement (PC) kg 252.00 1,480 372,958
- Sand m3 0.43 165,076 70,983
- Remuneration
- Brick layer man/day 1.30 62,615 81,400
- Worker man/day 3.60 45,538 163,938
- Supervisor man/day 0.18 74,000 13,320
638,047 258,657
896,704
18 1 m3 stone Masonry 1 PC : 3 Sand
- Material
- stone masonry m3 1.10 176,461 194,107
- Portland cement (PC) kg 185.00 1,480 273,798
- Sand m3 0.56 165,076 92,112
- Remuneration
- Brick layer man/day 1.30 62,615 81,400
- Worker man/day 2.50 45,538 113,846
- Supervisor man/day 0.18 74,000 13,320
560,017 208,565
19 100 kg steel work : 768,582
- Material
- Steel Bar (Reinforcement) U 24, BJTP-24 kg 105.00 12,523 1,314,916
- concreteWire kg 1.50 22,769 34,154
- Remuneration
- Steel worker man/day 2.00 62,615 125,230
- Worker man/day 2.00 45,538 91,076
- Supervisor man/day 0.50 74,000 37,000
1,349,069 253,306
Per kg 13,491 2,533
16,024
20 100 kg steel work :
- Material
ANALISA HARGA SATUAN
PENGADAAN DAN PEMASANGAN PERALATAN GARDU INDUK 150 kV SUKATANI GAOBEL
- Remuneration
- Steel worker man/day 2.00 62,615 125,230
- Worker man/day 2.00 45,538 91,076
- Supervisor man/day 0.50 74,000 37,000
1,408,838 253,306
Per kg 14,088 2,533
16,621
21 1.00 ton stell Structure
- Material
- Steel Structure (HTS) ton 0.68 19,922,966 13,597,424
- Steel Structure (MS) ton 0.37 18,784,510 6,903,308
- Bolt and Nuts NO 120.00 17,077 2,049,219
- Band plate ton 0.04 19,922,966 697,304
- Remuneration
- Steel worker man/day 10.00 62,615 626,150
- Worker man/day 20.00 45,538 910,764
- Supervisor man/day 2.00 74,000 147,999
23,247,255 1,684,914
Per kg 23,247 1,685
24,932
22 1 m2 Formwork
- Material
- Wooden m3 0.04 3,016,906 120,676
- Nail kg 0.75 25,615 19,211
3.00
- Remuneration
- Tukang man/day 0.26 62,615 16,280
- Kepala Tukang man/day 0.00 62,615 -
- Pekerja man/day 0.30 45,538 13,661
- Mandor man/day 0.02 74,000 1,480
139,888 31,421
171,309
23 1 m2 Ceilling (include. Frame & hanger)
- Material
- triplex (4 mm 4'x8'x4) sheet 0.34 85,384 29,347
- List Profile m1 2.08 17,077 35,571
- Nail kg 0.15 25,615 3,842
- Wooden m3 0.01 3,016,906 24,135
- Remuneration
- Carpenter man/day 0.40 62,615 25,046
- Worker man/day 0.50 45,538 22,769
- Supervisor man/day 0.00 74,000 222
92,895 48,037
140,932
24 1 m2 Floor Ceramic
- Material
- Ceramic tile 30x30 m2 1.05 45,538 47,815
- Portland Cement (PC) kg 10.00 1,480 14,800
- Sand m3 0.05 165,076 7,428
- Remuneration
- Brick layer man/day 0.36 62,615 22,541
ANALISA HARGA SATUAN
PENGADAAN DAN PEMASANGAN PERALATAN GARDU INDUK 150 kV SUKATANI GAOBEL
25 1 m2 Wall Ceramic
- Material
- Ceramic tile 10x10 m2 1.05 45,538 47,815
- Portland Cement (PC) kg 9.30 1,480 13,764
- Remuneration
- Brick layer man/day 0.45 62,615 28,177
- Worker man/day 0.90 45,538 40,984
- Supervisor man/day 0.04 74,000 2,960
61,579 72,121
133,700
26 1 m2 Metal Roof
- Material
- Corrugated metal steel m2 1.05 70,584 74,113
- Nail drat pcs 9.00 2,846 25,615
- Remuneration
- Carpenter man/day 2.00 62,615 125,230
- Worker man/day 0.10 45,538 4,554
- Supervisor man/day 0.00 74,000 74
99,729 129,858
229,587
27 1 m2 Steel painting
- Material
-Naturally Paint (Meni) kg 0.20 28,461 5,692
- Colour painting steel kg 0.35 22,769 7,969
- Sand Paper sheet 0.10 4,554 455
- Kuas NO 0.10 11,385 1,138
0.01
- Remuneration
- Worker Paint man/day 0.10 62,615 6,262
- Worker man/day 0.25 45,538 11,385
- Supervisor man/day 0.00 74,000 74
15,255 17,720
32,975
28 1 m2 Wall painting
- Material
- Plamur kg 0.15 22,769 3,415
- Colour painting wall kg 0.35 22,769 7,969
- Sand Paper sheet 0.10 4,554 455
- Kuas / Rol NO 0.01 11,385 114
- Remuneration
- Worker Paint man/day 0.10 62,615 6,262
- Worker man/day 0.10 45,538 4,554
- Supervisor man/day 0.00 74,000 74
11,954 10,889
22,843
29 1 m2 Road (New)
1 m2 Base Structure
- Soil Excavation
ANALISA HARGA SATUAN
PENGADAAN DAN PEMASANGAN PERALATAN GARDU INDUK 150 kV SUKATANI GAOBEL
- Remuneration
- Pekerja man/day 0.68 45,538 30,738
- Mandor man/day 0.06 74,000 4,647
- Stomwalls operator hour 0.02 85,384 2,049
177,006 37,435
214,441
30 1 m2 Penetration thickness 6 cm
- Material
- Aspalt hot 60/70 kg 8.40 16,508 138,664
- Crushed stone 2 - 3 cm m3 0.06 176,461 10,588
- Dust split m3 0.01 176,461 2,118
- Split m3 0.02 187,845 4,508
- Firewood m3 0.01 187,845 2,029
- Remuneration
- Pekerja man/day 0.43 45,538 19,673
- Kepala Tukang man/day 0.07 74,000 5,328
- Mandor man/day 0.02 74,000 1,598
- Operator hour 0.01 85,384 615
157,906 27,214
185,120
35 1 m' Drainage
Remuneration
- Brick Layer Orang/hari 1.50 62,615 93,923
- Worker Orang/hari 4.00 45,538 182,153
- Supervisor Orang/hari 0.20 74,000 14,800
738,288 290,875
1,029,163
Remuneration
- Excavation of Soil m3 0.65 40,131 26,085
- Back Filling m3 0.33 23,737 7,833
- Erection of Fence ls 1.00 62,615 62,615
696,884 96,533
793,417
Remuneration
- Excavation of Soil m3 3.38 40,131 135,641
- Back Filling m3 1.69 23,737 40,115
- Erection of Fence ls 1.00 187,845 187,845
3,794,427 363,602
4,158,028
Remuneration
- Excavation of Soil m3 2.88 40,131 115,576
ANALISA HARGA SATUAN
PENGADAAN DAN PEMASANGAN PERALATAN GARDU INDUK 150 kV SUKATANI GAOBEL
Remuneration
- Excavation of Soil m3 2.00 40,131 80,261
- Back Filling m3 0.72 23,737 17,090
- Erection of Gate ls 1.00 569,228 569,228
1,906,648 666,579
2,573,227
43 1 m3 Gravelling
- Material
- gravel m3 1.10 278,922 306,814
- Remuneration
- Worker man/day 0.30 45,538 13,661
- Supervisor man/day 0.01 74,000 740
306,814 14,401
1 m2 Compacted gravel (tebal 20 Cm) 321,215
44 1 m2 Site Clearing
- Remuneration
- Worker man/day 0.120 45,538 5,465
- Supervisor man/day 0.025 74,000 1,850
45 1 m' Kerbs
UNIT RATE
NO. ITEM PEKERJAAN UNIT REMARK
(Rp.)
I MATERIAL :
UNIT RATE
NO. ITEM PEKERJAAN UNIT REMARK
(Rp.)
UNIT RATE
NO. ITEM PEKERJAAN UNIT REMARK
(Rp.)
II REMUNERATION
UNIT RATE
NO. ITEM PEKERJAAN unit REMARK
(Rp.)
III RENT OF EQUIPMENT
1 Concrete Mixer hour 39,846
2 Communication of equipment unit/day 119,538
3 Stringing of equipment unit/day 853,841
4 Cassing hour 19,354
5 Fasility of lamp hour 18,215
6 Forklift hour 278,922
7 Gauge hour 34,154
8 Generator hour 85,384
9 Jack Hydrolic hour 28,461
10 Pully unit/day 68,877
11 Car ( truck ) unit/day 586,304
12 Computer + printer unit/day 34,154
13 Drilling pile of machine hour 193,537
14 Diesel hammer hour 34,154
15 Cutting of machine hour 74,000
16 Mobilisasion driven of machine or drilling machine ls 313,075
17 Support equipment ( key + safety belt ) unit/day 7,400
18 Welder of machine hour 28,461
19 Pipe Tremi hour 30,738
20 Stamper /Stomwalls hour 39,846
21 Cord meter 23,908
22 Place of work hour 56,923
23 Theodolit hour 29,600
24 Vibrator hour 32,140
25 Drilling of machine hour 23,338
HARGA DASAR MATERIAL DAN UPAH
PENGADAAN DAN PEMASANGAN PERALATAN GARDU INDUK 150 kV SUKATANI GOBEL
GI 150 KV SUKATANI GOBEL
SCHEDULE 2 : Steel structure and Foundation price analysis for 150 kV Switchgear
TOTAL 9,022,261
Note:
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : Disconnecting Switches(DS)or Disconnecting Switches-Earth(DSE)/ set
TOTAL 16,552,049
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : Capacitor Voltage Transformer ( CVT), 1 set = 3 unit
TOTAL 9,152,509
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : Current Transformer ( CT ), 1 set = 3 unit
TOTAL 7,718,546
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : Lighting Arrester (LA), 1 set = 3 unit
TOTAL 7,347,451
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : Post Insulator (PI) / Unit
TOTAL 6,724,677
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : Marshalling Kiosk (MK) / Unit
TOTAL 4,959,520
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : NGR / Unit
TOTAL 6,072,361
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : POWER TRANSFORMER 60 MVA
TOTAL 93,956,387
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : Auxiliaries Transformer 200 kVA/ Unit
TOTAL 4,056,934
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : Gantry MP1
TOTAL 41,442,889
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :
Foundation : Oil Pit
TOTAL 21,511,140
Note:
1. For owner Refference & Evaluation
2. Design of Foundation base on estimated allowable bearing capacity : 0.70 kg/cm2
3. Shall be installed in Daftar Isian 1 Bill no. 1
Name of Bidder : KSO PT. WISMA SARANA TEKNIK - PT. MENARA INDRA UTAMA
Signature of Bidder :