1.00
0.30
0.30
Over Flow
Steel ladder walk way
Opening 70 *150 cm
5.55
20cm wall
0.20
Out let
Clean Out
B inlet B
0.30
1.00
Scale 1:100
+ 13.15 + 13.15
+ 12.00 + 12.00
+ 8.00 + 8.00
+ 4.00 + 4.00
7.50
0.20
25mm pipe
1.15
0.18
0.20
Slab
Scale 1:20
Reinforcement Top
and bottom
5.50
20mm @15cm c/c
20mm @15cm c/c both
Both direction Top and
bottom Layers
direction Section A-A
Scale 1:25
C1 C2 C1 Columns Details
Type No size (cm ) Main Steel Ties Shape
1.00
0.40
C1 2 10 mm
8 40*40 8 25 mm 0.40
1.00 5.50 5.50 1.00
@25cm c/c
0.50
Footing Mat Thickness C2 2 10 mm
1 50*50 8 25 mm
70cm @25cm c/c 0.50
3 20 mm
contineous
Braces : 40 * 40cm 3 20 mm 10 mm@20cm
c/c all span
@ levels 4m and 8m contineous
from footing
0.40
3 20mm Cont
0.40 0.50
5.50 5.50
5.50 5.50
At all corners
aditional bars Opening 70*70
3 Nos cm for inspection
5 No 16mm
20mm@ bottom
At top both direction
length (2m) R.C Walls
0.15 0.70 0.15
0.45
0.40
0.30
m
Roof Opening
Scale 1:20
5.50
e e
0.20 0.20
0.20 0.20
1.20 1.50
5.50 5.50
0.40
0.40 0.50
20mm @15cm c/c both 20mm @15cm c/c both
direction ( one bent one straight ) direction ( one bent one straight )
Section (e-e) Slab t=40cm
2.00 2.00
0.20
0.40
0.20
0.15
Horizontals bars 0.20 Horizontals
f 12mm @15cm c/c 12mm @15cm c/c
both faces both faces
f f f f
See beams
Slab steel Reinforcements
0.50
0.40 0.40
Note: All corners must be chamfered external and internal
Opening Scale 1:50
0.70 *1.50
B2 B2
C
B1
B1 B2 5.50
C C
d
B2 B2
5.50
d 5.50
Scale 1:100
0.20
Internal Wall s
see Wall 0.30
Renforcement
External Walls
2 25mm (See Wall
Cotinuons Reinforcement)
Slab 0.20
40
0.40
Slab
Stirrups 10mm 2 25mm Cotineous
0.80
@15cm c/c 0.80
Stirrups 10mm
40
7 25mm 0.40
@15cm c/c
Cotinuons
0.40
6 25mm Cotineous
50cm All Length
Beam B2 Section d -d Beam B1 Section c-c
Scale 1:25 Scale 1:25
3 20mm Cont
0.40 0.50
5.50 5.50
Columns Details
Type No size (cm ) Main Steel Ties Shape
0.40 3 20 mm
2 10 mm
C1 8 40*40 8 25 mm contineous
@25cm c/c 0.40
10
2 10 mm
0.50
3 20 mm
C2 8 25 mm mm@20cm
1 50*50 @25cm c/c contineous
0.50
c/c all span
0.40
MS Steps
Steel Rail Rail
2.75 Opening 2.50 2.50
2.75
2.50
1.20
0.40
0.80
0.40
0.80
B1 Mid B2
Side beams beams
40 *80 cm 4.00 4.00
50 *80
cm
Brases 40 * 40 cm
steel steps
25mm@30cm c/c
with protection half
ring
4.00 As bill
OutLet Pipe
0.40 B.R.C 10x10x0.5cm reinforced
1.50 0.50 0.40 1.50 4.00 0.50 concrete manhole (pits) for the
20cm Compacted sub
valves size (1x1x0.80)m Cleaning outlet
base type B
15cm plain concretet Valve Valve As bill .
Earth
level at
least 0.50
0.10
1.00 5.45 5.45 1.00 0.10 1.00 5.50 5.50 1.00
Lean concrete Lean concrete
Tank Piping
( Section B-B) Scale 1:100
Scale 1:100