DEAD LOAD ON TOP CHORDS

FPP
U4

FPP FPP

PR U3 U3'

FPP FPP
U2 U2'

H
FPP FPP
U1 U1'

EPP EPP
L0

L0 L1 L2 L2' L1' L0'


LOL1 X₂ L/2
L

LENGTH (L) = 90 m
BAYLENGTH (BL) = 10 m

PITCH = HL = 14
PR = PRINCIPAL RAFTER
H = L4 ø=tan-1(h/(L/2)) L0U1 = 14 PR
PR2 =√ H2 + (L2)2
H = 90
4 ø=tan-1(22.500
45 ) PR = √ 22.500² + 45² L0U1 = 50.312
4
H = 22.500 m ø=26.57° L0U1 = 12.578 m
PR = 50.312 m

TRIBUTARY AREA OF ROOF SURFACE (TARS)

TARS = L0U1(BL)
X1 = L/8
TARS = 12.578 m (10m) X1 = 90
8
TARS = 125.780 m² X1 = 11.250 m

TRIBUTARY AREA OF VERTICAL ROOF SURFACE (TAVS)

TAVS = X1(BL)
TAVS = 11.250 m (10m)
TAVS = 112.500 m²

WT = WEIGHT OF TRUSS
L
WT = 35.9 (1 + 3.048)
90
WT = 35.9 (1 + 3.048)
WT = 1095.939 Pa

DEAD LOAD ON TOP CHORD


DL on TC = (WR + WP + WB)(TARS) +12(WT)(TAVS)
DL on TC = (216 + 200 + 90)(125.578) + 12 (1095.939)(112.500)
DL on TC = 125291.249 N
DL on TC = 125.291 kN

End Panel Point (EPP) = 62.646kN


Full Panel Point (FPP) = 125.291kN