BOQ Um Al-Tuyour Project - FINAL
BOQ Um Al-Tuyour Project - FINAL
1.2 Supply and install a suitable control panel for the sumersible pump, Soft Start, The works
includes all the requirements and accessories. No. 0.00 1.00 1.00 950,000 200,000 1,150,000
1.3 Supply and install a power factor correction panel (PFC), with all requirements and
accessories No. 0.00 1.00 1.00 150,000 25,000 175,000
1.4 Supply and install GI pipes (rising pipes/Threaded/) DN 125 mm, (5.5-6) mm thickness, with
all necessary works and accessories. Thickness and origin should be specified in the offer M 75.00 0.00 75.00 27,000 3,000 0
1.5 Supply and install GI Pipes and connections with flanges DN (125) mm from well head to
pumping room (with concrete supports where needed), with all necessary works and
M 0.00 14.00 14.00 27,000 5,000 448,000
accessories (elbows, tees, flanges… etc.)
1.6 Supply and install gate Valve with flange DN (125) mm PN (16), with all requirements and
accessories No. 0.00 1.00 1.00 225,000 50,000 275,000
1.7 Supply and install check valve with flange DN (125) mm PN (16), with all requirements and
accessories No. 0.00 1.00 1.00 225,000 50,000 275,000
1.8 Supply and install flow meter with flange DN (125) mm PN (16), with all requirements and
accessories No. 0.00 1.00 1.00 275,000 25,000 300,000
1.9 Install flat electrical submersible cable (BSH) with section 3x35mm2, with all requirements
and accessories. M 110.00 0.00 110.00 3,000 0
1.10 Supply and install dry running protection cable with two electrodes (2*1.5)mm, with all
requirements and accessories M 0.00 110.00 110.00 500 200 77,000
1.11 Supply and install pressure meter (Oil Type), (that measures up to (150)% of the operational
pressure) with all requirements and accessories of good quality European brand No. 0.00 1.00 1.00 75,000 15,000 90,000
1.12 Supply and install electrical high-pressure protection switch, (220) V, with connecting to
control panel with all requirements and accessories No. 0.00 1.00 1.00 125,000 25,000 150,000
1.13 Supply and install dosing pump with flow (5) l/h and pressure (18) with all accessories, with
all requirements, electrical connections and accessories No. 0.00 2.00 2.00 350,000 25,000 750,000
1.14 Painting all pipes and connections out of the BH with uniform paint
L.S 0.00 1.00 1.00 50,000 25,000 75,000
1.15 Supply and install pressure relief valve for water hammer protection including suitable joints,
connect water exit hole to a suitable drainage. The valve must withstand 125% of the
operating pressure of the pipeline No. 0.00 1.00 1.00 150,000 25,000 175,000
2 Electrical Power Works for the BH equipment
2.1 Supply and install automatic change over control panel ATS a per the specificqations with
all requirements and accessories No. 0.00 1.00 1.00 900,000 75,000 975,000
2.2 Installation of generator (100) KVA, including offloading, connect it to the change over
panel, with all requirements and accessories. The installation should be within an external
metal shed with concrete pavement with dimensions suitable for the generator. The No. 0.00 1.00 1.00 725,000 250,000 975,000
expected approximate dimensions of the generator is 4.8x1.4x2.2m
2.3 Supply and install NYY electrical cable (3x70 + 35)mm2, for connecting generator set with
change over panel, connecting from change over panel to control panel in the old pumping
room, with all requirements and accessories M 0.00 8.00 8.00 15,000 5,000 160,000
3 Electrical transformer
3.1 Install Overhead Transformer (20/0.4)KV rated power (100)KVA
No. 0.00 1.00 1.00 225,000 225,000
4.2 Provide and Install MV outdoor Load Break Switch (20) KV with all necessary accessories
and works No. 0.00 1.00 1.00 350,000 75,000 425,000
4.3 Provide and install MV lightning arrester (20)KV with all necessary accessories and works
No. 0.00 3.00 3.00 50,000 5,000 165,000
4.4 Provide and install MV fuse base (20)KV with (10)A fuse with all necessary accessories and
works No. 0.00 3.00 3.00 50,000 5,000 165,000
4.5 Provide and install MV Polymer Surge Arrester with all necessary accessories and works
No. 0.00 3.00 3.00 25,000 3,000 84,000
4.6 Provide and install MV Insulator holder, composite insulator fitting with all necessary works
No. 0.00 6.00 6.00 25,000 3,000 168,000
4.7 Provide and install Distribution Dead-end Insulator with all necessary accessories and works
No. 0.00 3.00 3.00 40,000 5,000 135,000
4.10 Provide and Install Low Voltage NYY cable (4*95)mm2 with all necessary accessories and
works M 0.00 28.00 28.00 15,000 5,000 560,000
4.11 Provide and Install Low Voltage control panel (160 A) with all necessary accessories and
works No. 0.00 1.00 1.00 350,000 75,000 425,000
4.12 Provide and Install Aluminum busbar for MV with all necessary accessories and works
Kg 0.00 12.00 12.00 4,000 2,000 72,000
4.13 Provide and Install Aluminum line for grounding (50)mm2 with all necessary accessories
and works Kg 10.00 0.00 10.00 5,000 1,500 0
4.14 Provide and install metal L-section 4*4 mm2 with all necessary accessories and works
Kg 0.00 5.00 5.00 1,000 500 7,500
4.15 Galvanized Rod with coupling for grounding with all necessary accessories and works
No. 8.00 0.00 8.00 15,000 5,000 0
4.16 Excavation for steel tower and ground bed, surplus deportation
m3 18.00 0.00 18.00 10,000 2,000 0
4.18 Concrete for steel tower (200)kg/m3 with all necessary works
m3 5.50 0.00 5.50 25,000 5,000 0
4.19 Concrete for steel tower (350)kg/m3 with all necessary works
m3 0.50 0.00 0.50 35,000 5,000 0
5.2 Provide and Install power tower (steel) (13.5/25) with holder and Anti-climb Barbed with all
necessary accessories and works No. 1.00 0.00 1.00 650,000 125,000 0
5.3 Provide and Install power tower (steel) (13.5/16) with holder and Anti-climb Barbed with all
necessary accessories and works No. 2.00 0.00 2.00 450,000 150,000 0
5.4 Provide and Install power tower (steel) (13.5/6300) with Overhead Transformer holder, chair
and Anti-climb Barbed with all necessary accessories and works No. 3.00 0.00 3.00 450,000 150,000 0
5.5 Provide and install MV Polymer Surge Arrester with all necessary accessories and works
No. 20.00 7.00 27.00 10,000 2,000 84,000
5.6 Provide and install Distribution Dead-end Insulator (21/120)mm2 with all necessary
accessories and works No. 10.00 8.00 18.00 35,000 2,000 296,000
5.7 Provide and install Long Rod Insulator (21/120)mm2 with all necessary accessories and
works No. 9.00 0.00 9.00 35,000 2,000 0
5.8 Provide and install MV Insulator holder, composite insulator fitting with all necessary works
No. 40.00 12.00 52.00 10,000 1,000 132,000
5.9 Provide and Install U-Shaped Bolt (with Nut) with all necessary accessories and works
No. 20.00 7.00 27.00 10,000 2,000 84,000
5.10 Provide and Install ACSR (50/8)mm2 with all necessary accessories and works
Kg 0.00 351.00 351.00 2,500 2,000 1,579,500
5.11 Provide and Install Aluminum line for grounding with all necessary accessories and works
Kg 30.00 0.00 30.00 2,500 1,500 0
5.13 Galvanized Rod with coupling for grounding with all necessary accessories and works
No. 24.00 0.00 24.00 25,000 5,000 0
5.14 Excavation for steel tower and ground bed, surplus deportation
m3 57.00 0.00 57.00 10,000 2,000 0
5.16 Concrete for steel tower (200)kg/m3 with all necessary works
m3 18.00 0.00 18.00 25,000 5,000 0
5.17 Concrete for steel tower (350)kg/m3 with all necessary works
m3 1.66 0.00 1.66 40,000 5,000 0
6.1.2 Cement plaster /350 Kg cement/, average thickness /1.5 cm/ for ceiling and external walls
m2 0.00 98.00 98.00 3,000 1,000 392,000
6.1.3 Provide and paint the internal walls and ceiling for generator and trasformer rooms with
white oil-based paint /3 layers/. m2 0.00 24.00 24.00 1,000 500 36,000
6.1.4 Provide and install ceramic tiles, light blue color for internal walls and ceiling for pumping
room. The tiles should be first class and clorine resistant. m2 0.00 68.00 68.00 6,000 1,000 476,000
6.1.5 Provide and install mosaic tiles /30x30x3/ cm with wall skirt, white cement with local
aggregate caliber /4/, with slurry and all necessary works, according to administration opinion m2 0.00 24.00 24.00 5,000 1,000 144,000
6.1.6 Provide and install tortoise pavement tiles with slurry and all necessary works, according to
administration opinion m2 0.00 43.50 43.50 4,500 1,000 239,250
6.1.7 Provide and install precast concrete curb stones 300 Kg cement/m3, /50×40 cm/, /15 cm/
thickness. m 0.00 50.00 50.00 1,500 500 100,000
6.1.9 Metal window frame dim (110*105)cm including installing and cement plaster around the
frame (200) kg/m3, protection frame four parts made from metal bars (1*1)cm with metal No. 4.00 0.00 4.00 50,000 25,000 0
mesh with square holes (2*2)cm
6.1.10 Windows (105x110)cm with glass, two shutters openable, every shutter include two parts
filled with glass No. 4.00 0.00 4.00 50,000 15,000 0
6.1.11 metal door frame dim (210*160)cm includeing installing and cement plaster around the
frame (200) kg/m3 No. 1.00 0.00 1.00 50,000 15,000 0
6.1.13 5mm thickness glass for windows, dimensions (75*55) cm, with fixing properly, with all
necessary works and accessories. m2 0.00 4.50 4.50 10,000 1,000 49,500
6.1.14 Cast concrete base suitable for (125) kva generator,dimensions (300*110*25 cm) reinforced
concrete (350) kg/m3 according to Hama Water Board Standards m3 0.00 1.00 1.00 125,000 5,000 130,000
6.1.15 Provide and align stone for the sub-flooring layer. Stone should be stiff and agreed by the
supervisors from WB and Sarc Water engineer m3 0.00 11.80 11.80 10,000 3,000 153,400
6.1.16 Pavement concrete (250) kg/m3,10cm thickness for the bavement and enterance
m3 5.00 -1.00 4.00 50,000 5,000 -55,000
6.2.2 Provide and install couple fluorescent lighting equipment /2×40 Watt/ with electrical switch
inside suitable box including all needed connection and works. EA 0.00 4.00 4.00 15,000 2,000 68,000
6.3.2 Connecting generator exhaust out of the pumping room, included all necessary works and
accessories EA 0.00 1.00 1.00 25,000 25,000
6.3.3 Plastic tank /100/L for sodium Hypochlorite, rounded shape with filling slot, suction slot for
dosing pump, with suitable base /20/ cm high No. 0.00 1.00 1.00 50,000 10,000 60,000
6.3.4 Provide and install PVC pipes, diameter /100 mm/ for electrical caples. The cable from the
BH head to the room should be installed within a PVC pipe of diameter 100mm installed
50cm under the ground m 0.00 12.00 12.00 5,000 1,000 72,000
6.3.5 Provide and install drain with all needed connection, accessories and other works.
EA 0.00 1.00 1.00 5,000 500 5,500
6.3.6 Provide and install Flanged GI pipes /50 mm/ for rain water with all accessories and needed
works. m 0.00 8.00 8.00 10,000 1,000 88,000
6.4.5 Provide and install copper bars (1.5 m length, 5/8" section), to be installed in the discharging
holes with all needed accessories and connections of good quality local manufacturing EA 0.00 4.00 4.00 25,000 5,000 120,000
7 Pipeline Works
7.1 Excavation Works
7.1.1 Trench excavation of all types (soil - hard rocks - asphalt - cocncrete - …. Etc), width /55
cm/ to depth between /110 - 250 cm/ above pipes according to drawings and suitable for
/160 mm/ PE pipes. The Excavation products has to be removed to the public dumping m 2000.00 117.00 2117.00 9,000 1,053,000
area or backfill the suitable parts without compensation for the contractor.
7.2.2 Install PE pipes using butt welding method, external diameter /160 mm/, including spread
/30 cm/ of sand, /15 cm/ under and above the pipe and filling the sides well. With warning m 0.00 1400.00 1400.00 4,000 5,600,000
strips
7.2.3 Provide PE pipes, external diameter /160 mm/ PN/10/ with all required fittings and
accessories. Including the required tests and certificates m 0.00 739.00 739.00 6,500 4,803,500
7.2.4 Install PE pipes using butt welding method, external diameter /160 mm/, including spread
/30 cm/ of sand, /15 cm/ under and above the pipe and filling the sides well. With warning m 0.00 739.00 739.00 4,000 2,956,000
strips
7.2.5 Provide and install GI flanged pipes DN 150 mm, PN 40 Kg/cm2 for High-Elevated tank
connections, with all accessories and needed works. m 0.00 35.00 35.00 25,000 5,000 1,050,000
7.2.6 Provide and install GI flanged pipes DN 80 mm, PN 25/40 Kg/cm2 for washing vavles
connections, with all accessories and needed works. m 0.00 4.00 4.00 20,000 5,000 100,000
7.2.7 Provide and install GI flanged pipes DN 80 mm, PN 25/40 Kg/cm2 for rainwater drainage,
with all accessories and needed works. m 0.00 0.00 0.00 10,000 2,000 0
7.2.8 Provide and install GI Flanged elbow DN 150 mm, PN 16 Kg/cm2 with all needed
accessories. EA 0.00 3.00 3.00 25,000 5,000 90,000
7.2.9 Provide and install flanged float valve DN 150 mm,PN 25 Kg/cm2 with all needed
accessories. EA 0.00 1.00 1.00 50,000 25,000 75,000
7.2.10 Provide and install flanged air release valve DN 60 mm, PN suitable with pipe pressure with
all needed accessories. EA 0.00 2.00 2.00 100,000 25,000 250,000
7.2.11 Provide, fabricate and install pipeline fittings PN suitable with the pipes with all needed
works. Kg 0.00 150.00 150.00 4,000 1,000 750,000
7.2.12 Provide and install gate valve, DN 150 mm with all needed accessories and connection
works. EA 0.00 1.00 1.00 250,000 50,000 300,000
7.2.13 Provide and install gate valve, DN 80 mm with all needed accessories and connection
works. EA 0.00 1.00 1.00 120,000 30,000 150,000
7.4.2 Provide, spread and compact single gradient gravel, according to the technical specifications
m2 0.00 325.00 325.00 3,000 1,000 1,300,000
7.4.3 Provide, spread and compact crushed limestone with appropriate gradient, according to the
technical specifications m3 0.00 200.00 200.00 3,000 1,000 800,000
7.4.4 Execute Hot mix asphalt layer with thickness 10 cm after compaction, including spreading of
/MC0/ layer, 2.5 kg/m2 according to the technical standards with the required tests m3 0.00 63.53 63.53 45,000 20,000 4,129,450