MASROOR BIN ARIFIN [2022120317]

EVALUATION OF POTENTIAL
RISK AT THE DANGEROUS
BENDS IN SEMPORNA,
SABAH.

01 STEP 1: IDENTIFYING EXISTING


AND POTENTIAL RISKS
Sources of Risk
Riders ride and drivers drive their vehicles at high speed at the dangerous bends.
Tools Identify Risk
Inspection
Detailed observation of the speed of road users at the bends.
Orientation
Gain a through information about accident at the bends
Loss
Vehicles and even worse are lives.
Peril
High speed vehicles at the dangerous bends
Hazard
Irresponsible road users

STEP 2: EVALUATING POTENTIAL RISKS


02 Accidents at the dangerous bends is low in
frequency but high in severity because it is involves
high costs to repair the vehicles and someone's life.

STEP 3: EXAMINING ALTERNATIVE


RISK MANAGEMENT TECHNIQUES

03
RISK CONTROL RISK FINANCING
Loss Control Retention
Prevention The road users will bear with
the consequences of the loss.
Authorities need to put up speed This will ultimately put them
limit signs at those bends, so the in a crisis which they don't
road users know the speed limit at want to be in.
those bends.
Insurance
Reduction
Paying a company monthly
Use rolling barriers system as road for a certain amount of money
divider at those bends to avoid in an agreement if any
vehicle get a serious damage. accidents occur especially at
those dangerous bends. The
Risk Avoidance insurance company would
agree to pay specific amount
Authorities should avoid from build based on the agreement.
another bends that similar to those
dangerous bends.

04 STEP 4: SELECTING AND IMPLEMENTING


THE RISK MANAGEMENT PROGRAMME
Insurance is a great way to deal with the dangers of collisions on
Rawang's dangerous curves. This risk will be transfer to another party
involves a contractual agreement whereby the other party assumes the
risk and is liable for the loss in the event of loss. In return, the insurance
company will agrees to pay a stated sum on the occurrence of certain
risks specified in the contract.

STEP 5: EVALUATING, REVIEWING AND


05 CONTROLLING THE RISK MANAGEMENT
PROGRAMME

Evaluating and Controlling are key in maintaining the performance and


results of the method that are used in controlling the risk at the dangerous
bends which is Insurance. The road users will pay the premium to the
insurance company.

REVIEWING DATA OBTAINED BEFORE AND AFTER ADJUSTMENTS TO DECIDE WHETHER TO


KEEP THE INSURANCE METHOD OR MOVE TO A BETTER APPROACH. NORMALLY, REVIEWS
OCCUR AT THE END OF THE YEAR, WITH COMPARISONS TO THE PREVIOUS YEAR'S RESULTS