You are on page 1of 5
CURRICULUM VITAE REZKLZAKARIA. S.T Address: Tebet Timur I! B No.5 RT/RW 007/005, South Jakarta KI Jakarta, Indonesia 12820 Mobile Phone No. : +62 852 82929796 Email address 1: rezkizakaria1@gmail.com PERSONAL DETAIL Place / Date of birth: Padang / May 22" 1991 Sex Male Marital status Married Nationality Indonesian Religion Islam Passport ID 1 C1985321, Expired 06 Nov 2023 CAREER SUMMARY Experienced Electrical Engineer with having more than 9 years history working in Electrical Engineering si ‘ages, Including Front End Engineering Design (FEED), Proposal/Tender, Project Detall Engineering Design and Construction EPC with Oil & Gas Project, Coal Fired Power Plant, Geothermal Power Plant & Fertilizer. KEY COMPETENCIES 1) FEED & Detail Engineering Design > Electrical design for preparing and also review deliverables: Electrical Design Basis, Load List calculation, Single Line Diagram, System Study Load flow, Short circuit, Motor starting, Relay coordination study, Cable Sizing, Cable Schedule, UPS Sizing, Power Generator Sizing, Transformer sizing, llumination Level Lighting Calculation, Grounding & Lightning Protection Calculation, Electrical specification, Datasheet, MTO, RFQ & TBE, Wiring diagram, Layout and Detail instalation Interfacing with correspondence’ Owner/Client, Vendor, other discipline, other department and subcontractor, also review for vendor data document. Electrical Design Software (ETAP), Dialux, Intemational standards/codes: IEC, API, ‘ANSI, NEMA, IEEE, NEC, NFPA, Indonesian Standards and Codes, (SN). 2) Construction > Electrical construction supervision checking and control installation, Involved in FAT, SAT & prepare for electrical installation method documents, shutdown work for warranty period. Professional Experiences: From 2013 2017 2018 2019 2020 2022 To Position Company 2016 Electrical Engineer PT.IKPT 2018 Field Electrical Engineer PT. Rekadaya Elektrika 2019 Electrical Engineer PT. Zistech Asia 2020 Superintendent Electrical PT. Rekayasa Industri 2022 Sr. Electrical Engineer PT. Hutama Karya (Persero) Present Sr. Electrical Engineer PT. Kilang Pertamina Balikpapan —_— Rezki Zakaria_CV Blectrical Eng. ——————— EDUCATION + 2009 - 2013 Bachelor Degree of Electrical Power Engineering from PLN Institute of Technology IT-PLN Jakarta with GPA 3.36 /4.00 + 2023-2023 Program Professional Engineer (\r.) from University of Indonesia PROFESSIONAL TRAINING + Electrical Installation ~ PT. PLN (Persero) ~ 2013 + Practice Work at PLTU Coal Fired Power Plant Suralaya, Banten 3400 MW PT. Indonesia Power - 2014 + HSE Training — PT. Inti Karya Persada Tehnik -2015 COMPUTER SKILLS + Microsoft Office (Excel, Word, PowerPoint) + Software ETAP + Dialux, Chaimite ORGANIZATION + Himpunan Mahasiswa Teknik Elektro IT-PLN 2003 + Ikatan Keluarga Besar Teknik Elektro IT-PLN EXPERIENCES / EMPLOYMENT RECORD 4. CompanyName —_ : PT. Kilang Pertamina Balikpapan Industry Energy Position : Sr. Electrical Engineer Duration November 2022 until March 2023 Projects : Refinery Development Master Plant (ROMP) Balikpapan vob Description a, Perform review & approval documents and drawings such as calculation and study earthing and lightning risk assessment, lighting illumination, arc flash study, reliability study, load shedding study, load sharing study, electrical cable schedule, power layout, lighting and small power layout, electrical equipment layout, cable routing layout, panelboard schedule, earthing and lightning protection layout, hazardous area classification layout, PAGA system layout, security system layout, telecom system layout, fie alarm layout, mechanical datasheet, motor datasheet, HVAC control cable & instrument schedule, b. Prepare letter of reply and also technical query to Contractor, . Coordination meeting with multi discipline, Lead Electrical Engineer, Manager, System Completion team, Construction team & Consignment with Contractor for speed up engineering documents & drawings. lectrical Eng. 2. Company Name : PT. Hutama Karya (Persero) Industry Construction Division Engineering Procurement Construction (EPC) Posi : Sr. Electrical Engineer & Lead Electrical Engineer Duration : October 2020 until October 2022 Projects : EPC Open Access Development Project Pertamina (Persero) RU-VII Kasim Sorong, Papua Barat, Job Description a. Perform review & approval documents and drawings such as specification electrical, datasheet, calculation, load list calculation, cable sizing, cable schedule, illumination calculation, transformer sizing, UPS sizing, earthing & lightning protection system calculation, system study, overall single line diagram, single line diagram for LV Switchgear, single line diagram for MV Switchgear, Single Line Diagram for Main Distribution Board, AC UPS Single Line Diagram, Battery Charger Single Line Diagram, electrical legend & symbols, typical schematic diagram, power and control cables layout, lighting layout, panel schedule, electrical substation layout, cable routing layout, cable tray layout, earthing and lightning protection layout, power and control connection list, hazardous area classification layout, cathodic protection layout, electrical heat tracing layout, typical installation detail, PAGA system layout, CCTV Layout, telecom system layout, material take off (MTO), Technical Bid Evaluation, Requisition for Quotation (RFQ), Modification Panel Existing & vendor documents & drawings. b. Prepare technical query & technical letter to Client, ©. Coordination with procurement team and vendor to ensure the product quality and delivery time of long lead items supplied by Company are achieved within target. d. Interfacing meeting with other discipline, other department and also Client. e, Witness FAT cable, Panel Distribution Board, UPS, LV & MV Switchgear. 3. CompanyName —_: PT. Rekayasa Industri Industry EPC Position : Superintendent Electrical / Construction Electrical Engineer Duration August 2019 until September 2020 Projects : Rantau Dedap Geothermal Power Plant Project Job Description a. Prepare grounding calculation system, lightning protection system calculation, lighting illumination level calculation, prepare Single line diagram external 150 KV Transmission line, electrical legend & symbols, prepare datasheet for transmission line, lighting system, grounding & lightning protection, LV system equipment, bulk material, cable tray, prepare electrical standard installation drawing, and prepare procedure test. b. Review and create cable schedule, standard drawing installation, system study, single line diagram, prepare to construction method electrical installation, construction method grounding grid installation, construction lightning protection system installation, work method for cable pulling, work to permit & job safety analysis. ‘c. Interfacing meeting with Client, other discipline, vendor & subcontractor. Rezki Zakaria_CV Electrical Eng. 4. CompanyName —_: PT. Zi-TechAsi industry : Power Plant EPC Position : Electrical Engineer (Project) Duration + July 2018 until July 2019 Project : Tambak Lorok Combined Cycle Power Plant Block 3 Project Job Description a. Develop Company standard specification for transformer, cable, cable tray & UPS. b. Develop engineering document : Single line diagram, Schematic diagram, load list calculation, Cable sizing calculation, Cable schedule, system study for load flow, short circuit study & motor staring study data sheet for transformer, AC/DC UPS, MCC, Cable tray, Power and control cables, bulk material, lighting, review and develop cable tray layout, review cable route, Technical Bid Evaluation (TBE), Material take off (MTO), . Review Electrical Inspection Test Plan (ITP), document vendor 4. Maintain regular coordination with other department to ensure that production to meet the target. 2. Maintain regular coordination with other department to ensure that production to meet the target {Interfacing meeting with Client, other discipline, vendor & subcontractor. 5. CompanyName —_: PT. Rekadaya Elektrika Industry Power Plant EPC Position Id Electrical Engineer Duration : January 2017 until June 2018 Project : Coal Fired Power Plant, PLTU Anggrek (2 x 25 MW) Gorontalo Job Description: ‘a. Develop engineering document: Datasheet, Calculation, system study for load flow study & load shedding study, Material Take Off (MTO) Single Line Diagram, load list calculation, Cable sizing, Cable Schedule, Cable tray, Interconnection Diagram, Panel Schedule, cable route and Equipment Layout b. Liaise with Vendor in terms of Request of Quotation (RFQ) and TechnicalBid Evaluation (TBE) for cable, transformers, MCC, AC / DC UPS to evaluate vendor proposal. © Coordinate interfacing with other disciplines (Process, Mechanical, Piping, Instrument) in terms of project deliverable submission d. Assist Project Management to prepare Change Order relating deviation between existing design & contract ©. Coordinating with Contractor Engineering to prepare & review shop drawings tobe used for construction team and compare with detail design. {. Modification of engineering design to be suit with actual construction plan Make engineering punch list h. Review Electrical Inspection Test Plan (ITP), FAT Procedure & Quality Control Form (QCF) as per QA/QC inspection requirements at yard. i. Prepare and finalize construction planning, mechanical completion support. Rezki Zakaria_CV ‘Blectrical Eng. Neen ed 6 CompanyName: PT. Inti Karya Persada Tehnik (IKPT) Industry EPC Oil & Gas, LNG, Fertilizer, Petrochemical Position Junior Electrical Engineer Duration October 2013 until October 2016 Projects ¢ 1. Construction of Jakarta Mass Rapid Transit (MRT Jakarta) 2. Kaltin-5 Project 2500 MTPD Ammonia & MTPD Urea Plant-Bontang, East Kalimantan (Shutdown Work) Job Description a. Prepare and create engineering document: Specification for 20 kV Cable Include Termination and Jointing Material, Cable Sizing Calculation, load list calculation, lighting calculation, SLD, Schematic diagram, and Lighting Calculation, Material Take Off (MTO) for Cables, Transformer, MCC, Bulk Material & Lighting. b. Assist Electrical Drafter to make electrical drawing: Lighting Layout Make Data Sheet, Technical Bid Evaluations (TBE) for MRT project, FEED and Proposal Perform Factory Acceptance Test (FAT) to check material quality and performance for cable. . Studying and understanding approved electrical installation procedures anddrawings prior make construction shop drawings. {. Electrical construction supervision checking and control installation process for pre- commissioning & Commissioning, Termination cable, energize for motor solo run, transformer, MCC, lighting, cable tray & finding ground fault for Ungrounded UPS 150 KVA, Prepare work planning and schedule for control the available construction resource. Check the function test, material quantity and plan sequence to beinstal i. Prepare and finalize construction planning, field engineering and mechanical completion ‘support, ap BEEERENCE Andi Wibowo (PT. Rekayasa Industri — Lead Electrical Engineer ) Mobile : +628 1328558366 email: andi_wibowo@rekayasa.co.id + Lonito Garancho (Marubeni Corporation - Senior Electrical Engineer ) Mobile : +628 111386574 email: lonito-garancho@mec.co.id + Wiyono (Rekadaya Elektrika - Lead Electrical Engineer ) Mobile : +628 1230048981 email: wiyono@rekadaya.co.id itriono (PT. Inti Karya Persada Tehnik — Lead Electrical Engineer ) Mobile : +62812186005 Lene ne EE peer Rezki Zakaria_CV Electrical Eng.

You might also like