SURVEYING AND TRANSPORATION
6. A closed traverse has the following data.
ENGINEERING
Find the corrected bearing of line CD by
INSTRUCTION: READ EACH QUESTION transit rule
CAREFULLY, CHOOSE THE BEST ANSWER A. S 65° 17’52”W C. S 65° 48’ 29” W
OUT OF THE CHOICES. B. S 65° 62’11”W D. S 65° 26’ 45” W
7. To determine the area of a triangular lot
DURATION: 4 HOURS ABC, a surveyor set-up a transit at point P
inside the lot and recorded the following
WARNING: FORMS SUBMITTED LATER THAN bearing and distances of each corners of the
5:15PM WILL NOT BE RECORDED. lot from P. Determine the area of the lot in
square meter.
150 m. The transit is set up at A with the 47. SITUATION: A steel tape with coefficient of
traverse axis 1.5 m above the ground, the linear expansion of 0.0000116 per °C is
point C is 87°45’ and the vertical angle was used to measure a line which was
between a horizontal line of sight from A to found to be 532.28 m long and when the
C is 35°24’. The transit is then set up at B temperature was 35°C. Find the
and an angle ABC is measured and found temperature correction per tape length
43. SITUATION: A 50m tape weighs 2kg. for the measured line.
at t he 8m and 25m marks. If a pull of 6kg 49. Refer to the situation in the previous
is applied, Determine the correction due to problem. Find the correct length of the line.
44. Refer to the situation in the previous compound curve is 300mand the radius of
problem. Determine the correct distance the second curve is 100m, because of big
45. Refer to the situation in the previous the desirable rate of change of normal
problem. The same tape was used to acceleration is 0.60m/s3, determine the