You are on page 1of 1
mannesmann Dera pin 15019.2 .c 2800 Capacities on Main Boom with | ssb/tsL Superlift 360° Capacity (t) = Load + Hook Block Gina GRO YES GINTINAD counterweight 160 t SL-Mast 30.0 m Type 2421 Central ballast ot SL-Cwt.-Radius 15.0 m Track 8.4m tia | Breeepatartnbts te} (m) 0.0 50.0 100.0 = 150.0 = 200.0 250.0 16 7.0" 79,08 z = : 20 7407820 z : 22 2.0 14.0 - - - 24 63.0 72.0 713.0 - ~ 26 5002.0 i 3 fn) eee ee i i 30 42.0 68.0 70.0 ~ “ a = = «= oD : °. moe) eee : : 42 20.0 39.0 58.0 64.0 “ 46 15.0 32.0 50.0 62.0 62.0 46 ap)060U en |B O 54 7.0 22.0 37.0 52.0 57.0 8 to i000 55.0 62 > 15.0 27.0 40.0 51.0 52.0 66 é i20020OCgkDtC ALD 43:0 %0 e 200328 ran 74 - 7.0 17.0 28.0 39.0 42.0 7” : so isto a80 3803 82 - - 12.0 22.0 31.0 36.0 86 7 7 ino igo 30 ao 0OCODStit«ieSCSCt«éS oa ss Es bag aaah 98 - i 13.0 20.0 21.0 102 : m0 ano in: 106 - - - 10.0 13.0 13.0 ite 2 : 3 a0 3.0 3.0 HE: *2x 3 *2x 3 *2x 3 *2x 3 *2x 3 22 3 ix 5 lx & ix 5 ix 5 ix 5 ix 5 DS: 51000320 22000320 23000320 24000320 25000320 26000320 i= ms, ae point 1anew f= thy took Hinck tose not wondh te proven! DS = operating mode switch on PAT-console * = double hook block In case of runner mounted, you have to reduce the load by the weight of the runner plus the weight of the hook block on the runner. If the jib suspension rods are on the main boom, you will have to reduce the lead by the half weight of the xodo. 8316, 22.10.1998 0,0,0 878 199 40 - 9

You might also like