You are on page 1of 1

DAILY LOG SHEET DATE:______________________

PROJECT SERVICE HOSPITAL RADIOLOGY BULDING CHILLER NO__________________


DRIECT FIRED ABSORPTION CHILLER/HEATER(HITACHI) TIME ON/OFF_________________
CHILLER MOEL NO: HAUCGH 630 EXSD UNIT MFG NO_________________

Ht Gen, Pressure Kpa

HT Concentration %
PRESSURE PSI VACUUM TEMEPERTURE FUEL GAS FAN LEVELS

Control valve %

Main Pressure(PSI)
Exhaust Gas Temp

Burner Pressure(Kpa)
Absorber Temp

Fans In operation
Refrigent temp
Pressure (Mpa)

HT Gen, Temp
Absorber Kpa

LT Generator
MFB %
^ P 10 PSI ^ P7 PSI

Evaporator
Child Water Cooling Water

Generator
Absorber
TIME Cooling Water Chilled Water

Generator
VOLTS
IN OUT IN OUT IN OUT IN OUT

7:00 ⃝ ⃝ ⃝ ⃝
8:00 ⃝ ⃝ ⃝ ⃝
9:00 ⃝ ⃝ ⃝ ⃝
10:00 ⃝ ⃝ ⃝ ⃝
11:00 ⃝ ⃝ ⃝ ⃝
12:00 ⃝ ⃝ ⃝ ⃝
13:00 ⃝ ⃝ ⃝ ⃝
14:00 ⃝ ⃝ ⃝ ⃝
15:00 ⃝ ⃝ ⃝ ⃝
16:00 ⃝ ⃝ ⃝ ⃝
17:00 ⃝ ⃝ ⃝ ⃝
18:00 ⃝ ⃝ ⃝ ⃝
19:00 ⃝ ⃝ ⃝ ⃝
20:00 ⃝ ⃝ ⃝ ⃝
21:00 ⃝ ⃝ ⃝ ⃝
22:00 ⃝ ⃝ ⃝ ⃝
23:00 ⃝ ⃝ ⃝ ⃝
0:00 ⃝ ⃝ ⃝ ⃝
1:00 ⃝ ⃝ ⃝ ⃝
2:00 ⃝ ⃝ ⃝ ⃝
3:00 ⃝ ⃝ ⃝ ⃝
4:00 ⃝ ⃝ ⃝ ⃝
5:00 ⃝ ⃝ ⃝ ⃝
6:00 ⃝ ⃝ ⃝ ⃝

Shift A Singnature_________________________ Shift B Singnature____________________________ Shift C Singnature______________________________ Supervisor Singnature___________________________

You might also like