PROJECT :
CONSULTANT :
CONTRACTOR :
TABLE OF CONTENTS
2 STEEL STRUCTURE HAND OVER - As per Design DWG. ASME SEC.Ⅰ All check list W W W W
INSPECTION - Manufacturer’s Instruction ASME B31.1 & Steel structure
- MS for CFBC installation work ASME Sec.Ⅸ inspection format
- Refer MS list & reference AWS D1.1
code list(Attachment.2)
- Refer to WPS list
(Attachenet.3)
- Refer to visual inspection
Criteria(Attachment.6)
2 HANGERS
2.1 Steam drum hanger rod installation - As per Design DWG. ASME SEC.Ⅰ ITP-M-106-06
1) Hanger rod location & fit-up check - Manufacturer’s Instruction ASME B31.1 ITP-M-106-07 W S S S
2) NUT setting & Damage check - MS for CFBC installation work ASME Sec.Ⅸ W S S S
3) Hanger rod visual check - Refer MS list & reference AWS D1.1 W S S S
- Bending / Notch / other damage code list(Attachment.2)
2.2 Furnace hanger rod installation - Refer to WPS list(No.1~6)
1) Hanger rod location & fit-up check (Attachenet.3) W S S S
2) NUT setting & Damage check - Refer to visual inspection W S S S
3 Hanger rod visual check Criteria(Attachment.6) W S S S
- Bending / Notch / other damage
2.3 Convection hanger rod installation
1) Hanger rod location & fit-up check W S S S
2) NUT setting & Damage check W S S S
3) Hanger rod visual check W S S S
- Bending / Notch / other damage
2.4 NDE(PT) : Hanger rod support lug W R R R
2.5 Removal of Temporary erection W S S S
Fitting
6 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
6.3 Dimension check - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) ITP-M-106-60 W S W W
- Length, Diagonal, Vertical, Width etc
6.4 Removal of Temporary erection fitting W S S S
9 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51 W R R R
ASME B31.1/136.4.5
⑨ PWHT - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
6) Dimension check - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) ITP-M-106-12 W S W W
- Length & Diagonal
9.3 Air Leak check - ASME B31.1 & ASME SEC.I - ASME B31.1 & ASME SEC.I ITP-M-106-057 W S W W
9.4 Removal of Temporary erection fitting W S S S
10 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
5) Dimension check - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) ITP-M-106-11 W S W W
- Length, Diagonal, vertical, width etc ITP-M-106-12
10.3 Air Leak check - ASME B31.1 & ASME SEC.I - ASME B31.1 & ASME SEC.I ITP-M-106-057 W S W W
10.4 Removal of Temporary erection W S S S
Fitting
Note.1 Final header level and location will be take place after the tube welding is complete.
11 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
6) Dimension check(Note.1)
- Length, diagonal, vertical alignment etc - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) ITP-M-106-11 W S W W
11.3 Removal of Temporary erection Fitting ITP-M-106-12 W S S S
Note.1 Dimension checks include header level and location when the assembly is complete and vertical alignment of the panels.
12 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
6) Dimension check(Note.1)
- Length, diagonal, vertical alignment etc - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) ITP-M-106-12 W S W W
12.3 Removal of Temporary erection Fitting W S S S
Note.1 Dimension checks include header level and location when the assembly is complete and vertical alignment of the panels.
13 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
5) Dimension check(Note.1) - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) ITP-M-106-12 W S W W
- Length & diagonal
13.3 Removal of Temporary erection W S S S
fitting
Note.1 Dimension checks include header level and location when the assembly is complete and vertical alignment of the panels.
14 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
6) Dimension check(Note.1) - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) ITP-M-106-12 W S W W
- Length & Diagonal - ASME B31.1 & ASME SEC.I
14.3 Removal of Temporary erection W S S S
fitting
Note.1 Dimension checks include header level and location when the assembly is complete.
15 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
6) Dimension check(Note.1) - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) ITP-M-106-12 W S W W
- Length & Diagonal
15.3 Removal of Temporary erection W S S S
fitting
Note.1 Dimension checks include header level and location when the assembly is complete.
16 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
6) Dimension check(Note.1) - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) ITP-M-106-12 W S W W
- Length & Diagonal
16.3 Removal of Temporary erection W S S S
fitting
Note.1 Dimension checks include header level and location when the assembly is complete.
Note.1 Scope of system: The integral pipework within the super-heater system and main steam pipework to the boiler terminal point.
Note.1 Scope of system: The integral pipework within the super-heater system and main steam pipework to the boiler terminal point.
Note.1 Scope of system: The integral pipework within the re-heater system from the cold reheater line through to the boiler terminal point for reheater.
Note.1 Scope of system: The integral pipework within the re-heater system from the cold reheater line through to the boiler terminal point for hot rehaeter.
25 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
25.3 Installation of pipe supports - ASME B31.1 & ASME SEC.I - ASME B31.1 & ASME SEC.I ITP-M-106-49
1) Fit-up W S S S
2) Final welding inspection - Visual inspection W S S S
Criteria(Attach#6)
25.4 Dimension inspection - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) W S W W
25.5 Removal of Temporary erection W S S S
fitting
29 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT(If possible) - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
29.9 Dimension inspection - ASME B31.1 & ASME SEC.I - ASME B31.1 & ASME SEC.I ITP-M-106-46 W S W S
Length, Level, diagonal, vertical - Tolerance table(Attach#4.5)
etc
29.10 Removal of Temporary erection W S W W
fitting
30 ⑦ Final visual inspection - ASME B31.1 & ASME SEC.I - Visual inspection ITP-M-106-53 W S W W
Criteria(Attach#6)
⑧ NDE(Butt -RT ) - MD1-0-T-030-5-00323& - ASME SEC.V NDT Report W R R R
ASME B31.1 & ASME SEC.I ASME SEC.I PW-51
ASME B31.1/136.4.5
⑨ PWHT(If possible) - MD1-0-T-030-5-00327& - ASME SEC.I PW-39 PWHT Report W R R R
ASME B31.1 & ASME SEC.I ASME B31.1/ 132
30.9 Installation of pipe supports - ASME B31.1 & ASME SEC.I - ASME B31.1 & ASME SEC.I ITP-M-106-49
1) Fit-up - Visual inspection W S S S
2) Final welding inspection Criteria(Attach#6) W S S S
30.10 Dimension inspection - ASME B31.1 & ASME SEC.I - Tolerance table(Attach#4.5) W S W W
30.11 Removal of Temporary erection W S S S
fitting
Note.1 Scope of system: The integral pipework within the re-heater system from the cold reheater line through to the boiler terminal point for reheater.
39-1 INSTRUMENT WORK - As per Design DWG - ITP-I-100(ITP for Instrumentation ITP-I-100-01
- Manufacturer’s Instruction work) ITP-I-100-02
- ITP-I-100(ITP for Instrumentation - ERQ 4.6 /11 ITP-I-100-03
work) ITP-I-100-04
- MS for CFBC installation work
- ERQ 4.6 /11
Note.1 Method statement for hydro test shall be submitted. Hydro test package will divide as per the pressure in accordance with FW recommendation.
2 Welding Inspection
1) WPS/PQR - Each applicable WPS & R R R R
ASME IX
2) Welder Qualification - MD1-0-T-030-5-00052 & R R R R
ASME IX
3) Fit-up - Each applicable WPS - Rootgap:2.4±0.8mm ITP-P-100-01/02 W S S S
Root gap/Alignment/Angle etc Alignment : Max.2mm
Angle : 37˚±2.5˚
4) Pre-heating - ASME B31.1 & - ASME B31.1 Preheating Report W S W/S R
Each applicable WPS
4 NDE before PWHT(If required) ASME B31.1 / ERQ 4.11 - ASME B31.1& NDT Report W R S/R R
1) NDE Procedure - MD1-0-T-030-5-00323 ERQ4.11
2) Review NDE Report - MD1-0-T-030-5-00324 - ASME SEC.V
- MD1-0-T-030-5-00325 - ASME SEC.I PW-51
- MD1-0-T-030-5-00326
5 Post Weld Heat Treatment - ASME B31.1 / ERQ 4.11 - ASME B31.1 PWHT Report W R S/R R
- Heat Treat Procedure - ASME SEC.ⅠPW-39
6 Hardness check after PWHT - ASME B31.1/ERQ 4.11 - Max.275HB Hardness W R S/R R
(Only 9Cr material be applied) - MD1-0-T-030-05-00131 report
7 NDE(UT) after PWHT(If required) - ASME B31.1 / ERQ 4.11 - ASME B31.1 & NDT Report W R S/R R
1) NDE Procedure - MD1-0-T-030-5-00323 ERQ 4.11
2) Review NDE Report - MD1-0-T-030-5-00324 - ASME SEC.V
- MD1-0-T-030-5-00325 - ASME SEC.I PW-51
- MD1-0-T-030-5-00326
3 HD-WPS-ASME-A003 C/S 1 to 1 GTAW+SMAW 5 ~19.0 ER70S-2/3/6 E7016/7018 Carbon Piping & Tube
12 HD-WPS-ASME-A011 Alloy 4 to 4 GTAW+SMAW 5 ~ 34.2 ER80S-B2 E8016-B2/E8018-B2 Alloy piping & tube
18 HD-WPS-ASME-A016 Alloy + Alloy 5A to 15E GTAW+SMAW 5 ~ 34.2 ER90S-B3 E9016-B3/E9018-B3 Piping & tube(Alloy Dissimilar welding)
21 HD-WPS-ASME-A018 SS+ Alloy 8 to 15E GTAW+SMAW 5 ~ 34.2 ERNiCr-3 ENiCrFe-3 Piping & tube(Dissimilar welding)
1 0 up to 100 ±1 ±1 ±1
2 100 up to 200 ±1 ±1 ±1
5 800 up to 1600 ±3 ±1 ±2
8 6400 up to 12800 ±6 ±4 ±5
Note. This table shall be applied for main equipment, duct, economizer, air preheat etc when installed at site.
2 Seismic stopper ±1
4 Buckstay installation ±2
GENERAL NOTES:
(a) For double welded butt joints, this limitation on reinforcement given above shall apply separately to both inside and outside
surfaces of the joint.
(b) For single welded butt joints, the reinforcement limits given above shall apply to the outside surface of the joint only.
(c) The thickness of weld reinforcement shall be based on the thickness of the thinner of the materials being joined.
(d) The weld reinforcement thicknesses shall be determined from the higher of the abutting surfaces involved.
(e) Weld reinforcement may be removed if so desired
Note.
1) The “size” of an equal leg fillet weld shall be described by the leg length of the largest inscribed isosceles triangle.
2) The “size” of an unequal leg fillet weld shall be described using both leg lengths and their location on the members to be joined.
3) Angle , as noted in the above figures, may vary from the 90 deg angle as shown based on the angle between the surfaces to be welded.
4) For an equal leg fillet weld where the angle between the members being joined is 90 deg, the theoretical throat shall be 0.7 × leg length. For
other fillet welds, the theoretical throat shall be based on the leg lengths and the angle between the members to be joined.
5) For all fillet welds, particularly unequal leg fillet welds with angle less than 90 deg, the theoretical throat shall lie within the cross section of the
deposited weld metal and shall not be less than the minimum distance through the weld.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-01
HYUNDAI ENG. & CONST. CO., LTD.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-03
HYUNDAI ENG. & CONST. CO., LTD.
See dwg
See dwg
See dwg
See dwg
See dwg
C.L OF CYCLONE
See dwg
See dwg
See dwg
See DWG See DWG
C.L OF FURNACE
See dwg
See dwg
: ACTUAL DIMENSION
: DRAWING DIMENSION
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-04
HYUNDAI ENG. & CONST. CO., LTD.
See dwg
CYCLONE”C” CYCLONE”B” CYCLONE”A”
See dwg
: ACTUAL DIMENSION
: DRAWING DIMENSION
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-05
HYUNDAI ENG. & CONST. CO., LTD.
[TYPICAL]
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
See dwg
See dwg
See dwg
See dwg
0
0
0
0
See dwg
See dwg
See dwg
See dwg
See dwg
See dwg
See dwg
See dwg
0
0
See dwg
See dwg
See dwg
See dwg
: ACTUAL DIMENSION
: DRAWING DIMENSION
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-07
HYUNDAI ENG. & CONST. CO., LTD.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-08
HYUNDAI ENG. & CONST. CO., LTD.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-09
HYUNDAI ENG. & CONST. CO., LTD.
[TYPICAL]
Panel No Check Point Result Remark Panel No Check Point Result Remark
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-10
HYUNDAI ENG. & CONST. CO., LTD.
: ACTUAL DIMENSION
: DRAWING DIMENSION
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-11
HYUNDAI ENG. & CONST. CO., LTD.
[TYPICAL]
: ACTUAL DIMENSION
: DRAWING DIMENSION
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-12
HYUNDAI ENG. & CONST. CO., LTD.
: ACTUAL DIMENSION
: DRAWING DIMENSION
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-013
HYUNDAI ENG. & CONST. CO., LTD.
[TYPICAL]
Dimension
1 2 3 4 5 6 7 8 9 10 ~ N Remark
Elevation
FL.+
FL.+
FL.+
FL.+
FL.+
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-14
HYUNDAI ENG. & CONST. CO., LTD.
[TYPICAL]
Front right coner Front left coner Rear right coner Reart left coner Remark
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-15
HYUNDAI ENG. & CONST. CO., LTD.
Dimension Dimension
“A” Coil “A”
Coil
Front Front
Rear Rear
Front Front
Rear Rear
Front Front
Rear Rear
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-16
HYUNDAI ENG. & CONST. CO., LTD.
[ TYPICAL]
Dimension
1 2 3 4
J
No.1
No.2
No.3
No.4
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-17
HYUNDAI ENG. & CONST. CO., LTD.
[TYPICAL]
Tag No
Dimension
“A”
Tag No
Dimension
“A”
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-18
HYUNDAI ENG. & CONST. CO., LTD.
Tag No
Dimension
“A”
Tag No
Dimension
“A”
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-19
HYUNDAI ENG. & CONST. CO., LTD.
[ TYPICAL]
: ACTUAL DIMENSION
: DRAWING DIMENSION
Dimension
A B C D E REMARK
No
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-20
HYUNDAI ENG. & CONST. CO., LTD.
“H” “G”
“A” “F”
CL. OF EXP.JOINT
SQUARE TYPE
“B” “E”
“C” “D”
“A” “D”
CL. OF EXP.JOINT
: ACTUAL DIMENSION
ROUND TYPE
: DRAWING DIMENSION
“B”
“C”
[ TYPICAL]
Tag No
Dimension
“A”
Tag No
Dimension
“A”
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-01
HYUNDAI ENG. & CONST. CO., LTD.
[TYPICAL ]
Dimension
1 2 3 4 5 6 7 8 9 10 11 12 Remark
Elevation
FL.+
FL.+
FL.+
FL.+
FL.+
FL.+
FL.+
FL.+
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-22
HYUNDAI ENG. & CONST. CO., LTD.
Elevation
“A” “B” “A” “B” “A” “B” “A” “B”
FL.+
FL.+
FL.+
FL.+
FL.+
FL.+
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-23
HYUNDAI ENG. & CONST. CO., LTD.
[TYPICAL]
Dimension 1 2 3 4 5 6 7 8 Remark
Support No
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-24
HYUNDAI ENG. & CONST. CO., LTD.
[TYPICAL]
Dimension 1 2 3 4 5 6 7 8 Remark
Support No
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-25
HYUNDAI ENG. & CONST. CO., LTD.
“B”
“A”
Dimension
A B Remark
Support No
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-26
HYUNDAI ENG. & CONST. CO., LTD.
[TYPICAL]
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-27
HYUNDAI ENG. & CONST. CO., LTD.
Dimension
Dimension A Remark B Remark
Tagt No Tagt No
PIT TE
PIT TE
PIT TE
PIT TE
PW TW
PW TW
PW TW
PW TW
PW TW
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-28
HYUNDAI ENG. & CONST. CO., LTD.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-29
HYUNDAI ENG. & CONST. CO., LTD.
Refer to the sealing settings place and install the straight edge.
Total variation should be in 0.50 mm.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-30
HYUNDAI ENG. & CONST. CO., LTD.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-31
HYUNDAI ENG. & CONST. CO., LTD.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-32
HYUNDAI ENG. & CONST. CO., LTD.
Turn one circuit and check the run out of the bearing housing after total loading.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-33
HYUNDAI ENG. & CONST. CO., LTD.
Tighten the gradienter and ensure that the gradienter is not moving. Check the rotor after loading.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-34
HYUNDAI ENG. & CONST. CO., LTD.
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-35
HYUNDAI ENG. & CONST. CO., LTD.
THEORETICAL
LOCATION Min.setting Max.Seeting Remark
VALUE(mm)
NOTE : FIND OUT THE MAX RUN OUT OF PIN AND MEASURE THE GAP A&B WITH THIS POINT
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-36
HYUNDAI ENG. & CONST. CO., LTD.
1 6 11 16
2 7 12 17
3 8 13
4 9 14
5 10 15
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
2 Hanger Rod
5 Seismic Stopper
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-38
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
3 Pipe Support
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-39
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
2 Seismic Support
3 Welding Joint
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-40
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
2 Hanger Rod
5 Seismic Stopper
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-41
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
2 Hanger Rod
5 Economizer coil
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-42
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-43
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Clearance
3 Casing
4 Thermowell
5 Expansion joint
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-44
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
3 Slide bearing
4 Final welding
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-45
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
2 Roof chamber
5 Inside cleaning
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-46
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material verification
4 Final welding
5 Expansion joint
6 Damper(direction etc)
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-47
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
2 Seal welding
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-48
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-49
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material Verification
4 Equipment Alignment
Base Grouting
5 1)Surface Preparation
2) Mixing And Curing Of Grouting
Final Acceptance
7 (Cleanliness, Touch-Up,
Appurtenances)
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-50
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material Verification
Equipment Foundation And
2
Anchor Bolt
3 Equipment Handling And Setting
Equipment Alignment &
4
Preliminary Coupling Alignment
Base Grouting
5 1)Surface Preparation
2) Mixing And Curing Of Grouting
6 Anchor Bolt Tightening
Final Coupling Alignment After
7
Completion Of Piping Connection
Final Acceptance
8 (Cleanliness, Touch-Up,
Appurtenances)
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-51
HYUNDAI ENG. & CONST. CO., LTD.
DESCRIPTION : AREA :
SKETCH :
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
Line No : Material :
SIGN
DATE
RESULT
NO. INSPECTION LOCATION REMARK
ACC’ REJ’ N/A
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-54
HYUNDAI ENG. & CONST. CO., LTD
REMARKS :
SUBCONTRACTOR : DATE :
CONTRACTOR : DATE :
EMPLOYER : DATE :
FORM NO. :ITP-M-106-55
PUNCH LIST
Page : of
PUNCH LIST
LINE NO :
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
0
90
180
270
[TYPICAL]
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-58
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material Verification
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-59
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material Verification
5 Final welding
Dimension check(Dimension,
6
Diagonal, Vertical, width etc)
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-60
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC’ REJ’ N/A
1 Material Verification
2 Alignment
3 Lelvelness
4 Support installation
5 Final welding
Dimension check(Dimension,
6
Diagonal, Vertical, width etc)
REMARKS :
SIGNATURE DATE
SUBCONTRACTOR :
FOSTER WHEELER :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-106-61