• Ensure the owner of the property signs the application form. The
designated owner listed on the land title must sign the permit application or provide
a signed letter granting authorization to someone else (e.g. contractor; property
manager), otherwise the permit application will not be accepted.
• F
ollow the required Formatting Standards when submitting
documents. These can be found directly on eBuild or on the City’s website at
Regina.ca/build and may help speed up the review process.
Regina.ca/build
• U
sing a design professional for your project? Many projects require the
seal of a professional engineer or architect licensed to practice in the Province of
Saskatchewan. Speak to your designer, contractor or look at our website advisory for
more information.
• A
pplications on newly subdivided land: If you are constructing on a newly
subdivided piece of land, please note that significant work is required before we can
accept a permit application. Once ISC completes the title, it takes approximately two-
four weeks to process, catalogue and complete the set up for the new parcels of land.
Regina.ca/build