You are on page 1of 2

1 Document Organization

After the Day-to-Day Transaction Processing of the Process Order GASCO Production Users want to
view and compare the Production Report and the Production Achievement Along with the Loading.
1.1 Document Log

Version Created
Versio
Status Date by (Name/E- Role Comments
n
Mail/Company)

July 25, Siddhanth.nair@


Draft Author
2022 sap.com

Click here Choos


Choose
to enter a e an
an item.
date. item.

1.2 Integration

The Integration with the Sales Department when Ever there is Loading that has been taking Place

2 Justification
Since GASCO is Moving from Oracle to SAP, GASCO Team Requires similar Report to be Developed in
the NATVE SAP GUI in ALV Format.

3 Functional Description
Since GASCO is Performing the Transaction on a Daily basis for the production , Issue and Loading
along with the Planning , the Report will provide a Comprehensive view for the Plan Vs Actual along
with the Loading Data , with the PDF Output , so that GASCO Team can Send this PDF to Various
Other Department Outside the GASCO Organization.

4 Frequency and Timing


The Transaction Volume of Generating ALV Report and PDF Print Will be Done on a Daily basis

5 Dependencies
The Data Should be Available in the Data base of the Loading and Production in Order to Generate
the Data in the Tabular Format.

6 Validation Criteria
The Data Must be matching the Actual data Posted By the GASCO PRP Team.
7 Functional Design
The Functional Design is Expected to be in the Form of Module Pool where in the GASCO User will be
able to View Multiple Data in a Single Screen

8 Report Output

You might also like