UPTIME MAGAZINE

june/july 17
for reliability leaders and asset managers
JUNE/JULY 2017

uptimemagazine.com
LER
An Asset Manager’s Guide

STRATEGY
TO ACTION
James Mourafetis

T
he Feb/March 2017 Uptime article, “An Asset Manager’s Guide to Finally, approach the respective vice president. Don’t reverse the hier-
Harvest Management Commitment,” explained how to sell your archical steps, otherwise you end up asking the vice president before the
company’s vision to the executive level team of your organization. department managers weigh in, creating an awkward situation.
If you were not successful in getting to this point, don’t feel bad; not
even a handful of asset managers across the globe have achieved successful 2. Invite an objective third party to baseline performance
enterprise asset management (EAM) transformation. However, if you were
through fact-based observed and analyzed assessments
successful at harvesting management commitment, it is now time to take
the next step and take it quickly: turning strategy into action! Generally speaking, there are two main truths about an organization’s
The important thing to remember is to have a vision of what your suc- failure to self-attempt continuous improvement. One, an organization’s
cessful EAM will look like. Do not underestimate the power of gaining man- structure is designed to perform repetitive daily functions. Good industrial
agement commitment. process design, which includes all processes in the organization, is often
Here are the four crucial steps, including important reports, necessary not implemented at the outset of these daily functions. This means good
to move forward with EAM. industrial process design is not part of the repetitive functional process.
Therefore, poorly run processes are repeated day in and day out, and they
1. Determine poor performing operational areas within are even viciously guarded to ensure the repetition does not change, even
for the sake of improvement. This creates a culture where senior and mid-
each EAM work stream in order to establish a pilot
dle managers safeguard original organizational design practices and block
within each work stream good industrial process design. The result is an organization that cannot
Every company has known weak performing functions, whether it is in and will not change.
the process of sales, operations and planning, engineering change orders, Two, even when an organization has good intentions to break these
operations, or after delivery services. In order to implement change and cultural chains by establishing an internal continuous improvement (CI) team,
strengthen the weak functions, it is important for asset managers to go to this internal team is limited by its own fear of change unless there is outside
the right parties in the right order for their buy-in – a process that is extremely intervention. By promoting persons from within to the CI team, the existing
delicate. culture is reinforced. This leads to the CI team using math and science to
It is crucial to start with the department level managers and gain their reinforce its own poor practices. It’s understandable. Why would the CI team
commitment to allow for a fact-based assessment of the known weaknesses. make or recommend changes if its visionary members know they may one
Not only does this show respect for the department managers, it also pro- day be reassigned to those whom they want to change?
vides them the opportunity to take the initiative and start the EAM process Internal assessments always will be seen as biased within and between
with the team. departments. That is why it is absolutely necessary to hire third-party con-
Next, present the department level managers’ assessment of weaknesses sultants who are boots on the ground operators and can develop fact-based
to the executive level asset steering committee for approval. This ensures assessments without bias to speak the truth through observation, analysis
the department managers do not lead you down a wrong path. Since asset and facts. Remember, in many organizations, department managers will be
managers might not always know the functional problems very well, an in- defensive and want to discredit findings. Therefore, it is important to select
accurate assessment could steer you into a dead-end operation where there the right consulting firm that has the emotional maturity to baseline fact-
is not enough activity to determine a baseline for improvement. based performance.

40 june/july 17
3. Have the third party report the assessment sensitivity. These consultants provide fact-based reports that baseline the
and pilot program to the executive level current performance of the assessed scope and make realistic recommenda-
tions, complete with projected base and best-case financial and operational
asset steering committee improvements. The assessment reports need to reflect the magnitude and
The knowledge that the department and their respective vice president impact of the overarching asset measures and assess each measure in terms
will have their souls exposed to the executive management team is fright- of operating expense (Opex) and capital expenditure (Capex).
ening to that department. Luckily, consulting firms experienced in this area Figures 1 through 6 provide sample elements of such fact-based assess-
know how to manage this process effectively, professionally and with great ment reports in the operation of trains.

Yard  moves  are  supported  by  2,  3,  or  4  crews  of  two.  Based  on  observa:ons  and  discussions  with  
locomo:ve  a>endants,  the  move  types  vary  across  shi?s,  with  night  shi?  suppor:ng  more   Current  staffing  is  not  matched  to  workload  a?er  factoring  for  work  content,  unplanned  work,  
ac:vity  due  to  maintenance  and  servicing  needs.   arrival  varia:on  and  planned  worker  absence  
Workload(VS.(Capacity(Model(
(Loca2on:"S&I"""Cra9:"Cleaner)"
S&I  Cleaner    
Shi?  Pa>ern   Observed Activity Service  &  InspecJon  (S&I):   1800" 1800"

Su   Mo   Tu   We   Th   Fr   Sa  
•  Cleaner  uJlizaJon  is  66%    
1440" 1440"
0!

0!

0!

0!

0!

0!

0!

0!

0!

1!

1!

1!

1!

1!

1!

1!

1!

0!

0!

0!

0!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

3!

0!

0!

0!

1!

1!

1!

1!

1!

1!

1!

1!

1!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

1!

1!

1!

1!

1!

1!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

1!

1!

1!

1!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

1!

0!

0!

0!

0!

1!

1!

1!

1!

1!

1!

1!

1!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

1!

1!

1!

1!

1!

1!

1!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

0!

1!

1!

1!

1!

1!

1!

1!

0!

1!

1!

1!

1!

0!

0!
07:00                               1080" 1080"

09:00                               •  Big  drop  is  during  10  p.m.  –  6  a.m.  shiF,  which  has  light   720" 720"

11:00                               Day Shift


!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
Evening Shift Night Shift workload  from  trains  with  regular  coach  cars.   360" 360"

13:00                              
0" 0"
07:00 15:00 23:00 7:00 •  Workload  exceeds  current  staffing  during  10  a.m.  –  1  
0:00" 1:00" 2:00" 3:00" 4:00" 5:00" 6:00" 7:00" 8:00" 9:00" 10:00" 11:00" 12:00" 13:00" 14:00" 15:00" 16:00" 17:00" 18:00" 19:00" 20:00" 21:00" 22:00" 23:00"

15:00                               Regular"coach" Superliner"coach" Regular"Sleeper" Superliner"sleeper" Diner" Locomo2ve" Availabe"work"mins"


Based&on&planned&jobs&

17:00                               p.m.  slot.  This  causes  delays.   Workload(VS.(Capacity(Model(


From Servicing, Receive, Build Maintenance and S&I  Pipefi>er   (Loca2on:"S&I"""Cra9:"Pipefiter)"
19:00                              
Departure Trains, To Servicing Servicing Support •  Carman,  pipefi`er,  laborer,  machinist  and  electrician   540" 540"

21:00                              
uJlizaJon  are  in  20-­‐40%  range  even  aFer  factoring  for  
480" 480"

420" 420"
23:00                              
01:00                               unscheduled  repairs.   360"

300"
360"

300"
Moving   Not  Moving   No  Obvs.  
03:00                              
240" 240"

180" 180"

05:00                               StaJon   120" 120"

60" 60"

     2  Crews  of  two   42%   •  Cleaner  uJlizaJon  is  22%.  Big  drop  is  due  to  redundant   0"
0:00" 1:00" 2:00" 3:00" 4:00" 5:00" 6:00" 7:00" 8:00" 9:00" 10:00" 11:00" 12:00" 13:00" 14:00" 15:00" 16:00" 17:00" 18:00" 19:00" 20:00" 21:00" 22:00" 23:00"
0"

     3  Crews  of  two  (8  &  10  hour)  (4  in  Winter)   58%   staffing  that  overlaps  with  work  scope  of  outlier  locaJons.   Regular"coach" Superliner"coach" Regular"Sleeper" Superliner"sleeper"
Workload(VS.(Capacity(Model(
Diner" Locomo2ve" Availabe"work"mins"
Based&on&planned&jobs&

 4  Crews  of  two  (Overlapping  10  hour  shiFs)   •  Carman,  pipefi`er  and  laborer  uJlizaJon  are  in  15-­‐20%   420"
 Sta:on  Cleaner   (Loca2on:"CUS"""Cra8:"Cleaner)"
420"
*  All  shiFs  have  addiJonal  ground  crew  of  2-­‐3  
(Mechanic  and  Electrician)  
range.  These  losses  are  driven  by  need  to  provide   360" 360"

coverage  at  StaJon.   300"

240"
300"

240"

180" 180"

120" 120"

Proposed  Ac:on:  
60" 60"

Workload  in  winter  is  roughly  twice  as  heavy  due  to  increased  need  for  maintenance  and  service  support,  addiJonal  Jme   0" 0"

Redesign  staffing  matrix  for  S&I  and  StaJon  


0:00" 1:00" 2:00" 3:00" 4:00" 5:00" 6:00" 7:00" 8:00" 9:00" 10:00" 11:00" 12:00" 13:00" 14:00" 15:00" 16:00" 17:00" 18:00" 19:00" 20:00" 21:00" 22:00" 23:00"

spent  with  switches  due  to  ice  and  snow,  and  complicaJons  arising  from  components  freezing  in  low  temperatures.  
Regular"coach" Superliner"coach" Regular"Sleeper" Superliner"sleeper" Diner" Locomo2ve" Availabe"work"mins"
Based&on&planned&jobs&

Performance  improvement  of  suppliers  can  reduce  late  orders  from  9%  to  3%.  
Structure  of  supplier  base  enables  you  to  focus  on  the  26  major  ones  developing  a  direct  relaHonship  
for  cost  and  quality  improvements.  This  has  not  been  regularly  done  in  the  past  (excepHon:  rails).  
Nine  percent  of  all  P/Os  due  in  2015  have  been  delayed  more  than  one  week.  

•  Expenses  are  concentrated  in  26   VENDOR'PAYMENT'IN'ACTUAL'CURRENCY'$'

major  vendors  >  80.000  Can  $.  


$7.000.000,00$$

$6.000.000,00$$

•  There  are  no  scorecards  or   $5.000.000,00$$


80$%$of$expenses$for$26$suppliers$

performance  KPI  for  smaller  suppliers  


$4.000.000,00$$

$3.000.000,00$$

in  place.     $2.000.000,00$$

•  Delivery  performance  is  monitored,  


VENDOR$PAYMENT$IN$ACTUAL$CURRENCY$$$
$1.000.000,00$$

but  ongoing  issues  are  reducing  


$0,00$$
$

U E$L $
IL M $

FA ON MIL H$L $
EN RU AIL E$
$C IO C$

CS A $

H IT R AN GN $
$B $H $A L $

RIE AU N$I $
S $
N DU EN AD D.$

ER S$( IP $

EP FA KO $
FE ES RIN $

.$ $
$

M $PR LAT S$L NA $

U OD S$L $
CT CT D$

ER OT ING C$

$
IT Y TR $

Q S$I $

IM C$
M $

IT AB T$
E $

TE 9)$ $
$S C$

$
X$M LE U KA A$
N
/C IC E
RA STO TD

C C

O AD NC

H A C
IL A S

TE DR IO C
S$C LIC NC

W IE U C

ES

RIS CT NE
LL $L.M G

O $N O LIN $LIM INC

S P IE A D

AN $PR PLIE NC

SM UX NO TD

H $S C C
G EM U

IP C
ER TD

AT 8 D

ED
AM IS A IC U
N RV G

ST T R E

$S W EN
TE $IN

AL CT $IN

EC M $IN

AT Y CT $IN

O R Q $IN

AT C UR $IN

W ITH LE X$IN

$L E
RY IN

U N
G E$C ITE

FA U T
TIO

$B 19 $LT

AN OF E$S AN D

IN ST IQ
EN N T AN $LT

AL
T

H T
IA E$I $L
PH $L

IT
PR AN N$I

X P $I
$P ST A A

S
RA

material  availability.    
O

B
RP

$E
RO E

FA

D AM LO D

$E
U $S

TR U
O

M
D Y$&

N AN
A$C

$M

N
LE E$M
EN PL
AD

TO
D

H
P

$C

O
AN

IT

PR AL HN

IL
IE

S$E
O
$S

E$M
H

AM
$P $I
AN
SC

TW

LD BR

N EC
CO

CW
ST ECH
N

$D

H
IO T

IT
AB

ES

AM
RA

IC

EA CT

RS
U
W
M

AL
$T

U
AIL

RA

SE
ET
O

AT

IS
G
M
$R

RN
RN
SS
RE

U
TE

O
G

IN

Y$F
O
PR

RA
G

Purchase order performance May


2015 in days
Purchase order performance May 2015
#"DAYS"DEV"
  Actual   Late  >  7  days   %  
200$
150$ Project  Orders  -­‐  P:     643   48   7,5%  
100$ Consumable  &  New  CondiEon  
987   118   12,0%  
50$
0$
Order  -­‐  S  &  D:    
!50$ 0$ 1000$ 2000$ 3000$ 4000$ 5000$ 6000$ Repairable  Order  -­‐  M  &R:     350   64   18,3%  
!100$
!150$
Late orders Warranty  Order  -­‐  WM:     48   19   39,6%  
      TOTAL:   2028   249   12,3%  
!200$
!250$
due in 2015
!300$

REALISTIC  
In  the  future,  Site  2  will  have  a  total  of  20  full  1me  employees  (FTE)  dedicated  to  contract  work.   DIMENSION   MEASURE   CURRENT   BEST  CASE  
FUTURE  STATE  
Based  on  Site  1  work  pipeline  and  profitability,  you  can  select  one  of  these  workload  scenarios.            
Lost  &me  injuries  per  200,000  labor  hours   5.38      1    1.5  
SAFETY  
#  lost  &me  injuries   26   3   7  
BASELINE SCENARIO 1 SCENARIO 2 SCENARIO 3
Post  E  90  day  failure  rate  -­‐  loco   2.72      1.5    2.31  
Wheels  and  Engine   Wheels  and  TM   Wheels,  Engine  and  
Baseline  Contract  Produc1on   Focus   Focus   TM  Focus   RELIABILITY   Post  E  90  day  failure  rate  -­‐  car   3.26        2.71  
Expected  1me  
standard  aOer  
Current   improvement   #  delays  per  month  (Mechanical  only)   39   35  
Annual   Arr  –  Dep   Annual   Arr  –  Dep   Annual   Arr  –  Dep  
Contract  Work  Type   Annual   (hrs)  
Prod.  
Prod.   Time   Prod.   Time   Prod.   Time  
PRODUCTION/ Availability  -­‐  Loco   79.1%    90%   85%  
AVAILABILITY   Availability  -­‐  Car   79.3%    90%   85%  
Wheel  Sets   183   4   800   1  week   800   1  week   800   1  week  
Engine  Overhaul   1   400   25   3  weeks   2   -­‐   10   6  weeks   Wrench  turn  &me   45%    80%    60%  
Trac-on  Motor  Repair   4   40   8   250   1  week   150   1  week  
Cars/  locos  wai&ng  for  material   4-­‐6   0   2-­‐3  
Trac-on  Motor  Replace   6   24   16   250   1  week   150   1  week   COST  
Outside  Maintenance   2   30   2   2   2   Inventory  -­‐  relates  to  overstock   $2.6M   $1.3M  
 (as  it  impacts  availability  to  opera&ons)   reduc&on   reduc&on  
Revenue $320,000 $7,212,000 $4,918,000 $5,489,000
#  ideas  from  craU  per  month     <  0.1      2    1  
Annual Profit $47,500 $1,095,000 $696,000 $803,000
Center  of  Excellence  (CoE)  
ENGAGEMENT   Level  0-­‐1    Level  5    Level  4  
1.  Cost  basis  –  es-mated  material  cost  from  work  scope;  labor  cost  based  on  standard  hours,  $74  per  labor  hour,   maturity  matrix  score  
future  efficiency     Supervisor  Leadership  Behavior  compliance   39%     95%    90%  
2.  Revenue  basis  –  20%  material  markup;  15%  labor  markup  
Figures 1-6: Snippets of fact-based assessments in train operations

june/july 17 41
LER

4. Develop work streams to achieve the owners, typically the vice presidents, present their work streams linked to the
overarching asset measure overall financial and operational benefits. For large, heavy asset companies
where sales are typically more than $10 billion, this may be up to a $700
Once the fact-based assessment and recommendations are presented million long-term benefit, which is a very exciting proposition to the CEO
with impact and the asset manager has the executive asset management and board.
steering committee’s attention, it is time to sell the next phase: the develop- Figures 7 through 12 showcase examples of how work streams link to
ment of work streams linking to the overall asset performance measure. In overall company benefits.
the next report to the executive steering committee, the functional business

Identifying contributors to time loss buckets and targeting improvements to reduce


losses is the key to maximizing utilization.

Top level work plan for each stream with clearly defined current and future state, measures
and unit cost impact- Assign Champions for each Work Stream REPEAT FOR EACH WORK STREAM

Current Future
Avg. Terminal Dwell (1)
Improve assignment of locomotives to Avg. Terminal Dwell
Train ID
16.6 hours 14.1 hours

!  ETA based on Real Time Network Condition


!  GPS system that provides
!  Provide LMs complete knowledge of Locomotive
!  LMs cannot plan ahead due accurate ETA
Condition / Health
to the absence of reliable ETA !  On-board sensors and
!  Improve mechanical desk skills and tools
and power condition standardized flags to report
!  Complete assignment process as timely and efficiently
information condition
as possible
!  LMs use judgment to estimate !  Diagnosis tools and training
ETA for mech. desk
!  Flags are unreliable and LMs
Avg. Terminal !  Assignment process
Dwell
depend on service center to Asset Perf completed before locomotive
-2.5 hrs
verify power condition reaches terminal or 8 hours
+5.3% before shop release

Annual impact 2012 2013 2014-17 2018-21


Avg. Terminal Dwell - 0.1 hour - 0.1 hour - 1.0 hour - 1.3 hour

Infrastructure API
Asset Productivity Losses
25% fleet reduction (flat lined demand) ›  Infrastructure vision is set to improving line Engineering Asset Group
Equipment Effective Index - System Overview

speed and smaller maintenance footprints 100%


BASED ON WK 40 DATA
› 
90%
Asset productivity losses can be attributed to 80% 33%

›  Infrastructure limitations 70%


7%
6-8%
2-3% EEI
Ac#ve  road  fleet   › 
60% 1-3% 2-4%
Limited real time track health visibility 50%
1-2% 1-3% <1% 37%
count   ›  Reactive rather than predictive
40%

30%
Impact Utilization Impact Reliability
maintenance 20%

› 
10%
Process and labor planning variations
Asset  Performance  
0%
Total track Time Table Clearance Train Meets / System Maintenance & Slow Signal OOS EEI
time @ speed Speed restrictions Spacing Production / Inspection Orders Delays
Index  Increase   Restrictions Construction

Major Actions Results

0-5 Years 0-10 Years Utilization


3.9%

1.  Increased productivity 1.  Embedded inspections


through standardization 2.  Remote diagnostics
and training
3.  Advanced materials
2.  Integrated asset
Key  ac#ons  to  improve   management 4.  Electronic track Reliability
1.5%
Unit Cost
authorization $169M
API   3.  Targeted capital
investment
4.  Smaller footprints and off
track equipment
$213M Revenue $169M Cost

Locomotive API
Asset Productivity Losses

›  Currently, we have limited real time knowledge of


locomotive condition, location, timing and cost 100% Locomotive Asset EEI
BASED ON WK 40 DATA
› 
90%
Process and quality variations add additional complexity 80% 35%

70% 10%
to managing locomotive assets 60% 2% 2% 4%

› 
10%
These gaps impact service and also reduce asset 50%
9% EEI=
40% 32%
productivity by 30% 30%
20%
Impact Utilization Impact Reliability
10%
0%
Total Active Train to Train Intermediate LOR Reposition Fallout Repair and Other time EEI
fleet time time loss time loss time loss time loss time loss PM time loss loss

Major Actions Results

0-5 Years 0-10 Years Utilization


24.8%

1.  Process standardization 1.  ETA based on Real Time


Network Condition
2.  Asset quality
improvement 2.  Dynamic repositioning
and locomotive Unit Cost
3.  Enterprise Asset Reliability
assignment 6.2% $236M
Management
3.  Condition-based
maintenance
4.  Capacity-based
maintenance scheduling
XXX Revenue $236M Cost

Figures 7-12: Sample report snippets exemplifying work streams linked to


overall company benefit

42 june/july 17
The functional business
Houston Chapter of SMRP
owners present their 11 th annual Maintenance
work streams linked to & Reliability Symposium
August 9—11, 2017
the overall financial and Moody Gardens Hotel
Galveston, TX
operational benefits.
Keynote by R. Keith Mobley, SME
Next Steps Golf Tournament & Workshops August 9, 2017
Once an asset manager has accomplished the above steps, he or she has
achieved the first major milestone of putting strategy into action. Most asset Technical Presentations by speakers from major industries
managers do not make it this far, mainly because they are not successful in following the five pillars of SMRP and a Maintenance &
articulating the linkage between better availability and utilization of assets Operations track August 10th. Panel discussions by industry
for improving operating performance, future Capex offset and contribution leaders on August 11th
margin capacity through improved use of the key assets. This is when an asset
• Great opportunities for learning & networking
manager has the attention of senior management; it is now time to develop
• Net proceeds go to fund scholarships and grants for
and deploy enterprise asset management.
students in the Technical, Maintenance and Reliability fields
• Auction of Sports Memorabilia from Diamonds in the Rough
James Mourafetis is a Senior Vice President and leads
Argo Consulting’s Railroad and Public Transportation • “Stay-cation” for those in the Gulf Coast area—
practice. He is a thought leader in operational excellence Bring the family to Moody Gardens and Schlitterbahn!
and enterprise asset management in the Class 1 rail
industry and the world’s largest public transportation Thank you to the following sponsors & associations for their support
agency. James has led many large and global operational
improvement initiatives, as well as leading industry
initiatives in transportation and mining to improve
the availability, reliability and utilization of infrastructure, equipment and
workforce productivity. www.argoconsulting.com For information or to register visit: www.smrphouston.org

Uptime_MaRS_Ad_2017.indd 1 3/20/2017 1:08:12 PM

Providing
Classes in Airborne
Ultrasound
Certification
Level 1 and
Level 2 Certification

Mr. Ultrasound 770-517-8747 TheUltrasoundInstitute.com

june/july 17 43