Uptime JuneJuly - James Mourafetis 1
Uptime JuneJuly - James Mourafetis 1
june/july 17
for reliability leaders and asset managers
JUNE/JULY 2017
uptimemagazine.com
LER
An Asset Manager’s Guide
STRATEGY
TO ACTION
James Mourafetis
T
he Feb/March 2017 Uptime article, “An Asset Manager’s Guide to Finally, approach the respective vice president. Don’t reverse the hier-
Harvest Management Commitment,” explained how to sell your archical steps, otherwise you end up asking the vice president before the
company’s vision to the executive level team of your organization. department managers weigh in, creating an awkward situation.
If you were not successful in getting to this point, don’t feel bad; not
even a handful of asset managers across the globe have achieved successful 2. Invite an objective third party to baseline performance
enterprise asset management (EAM) transformation. However, if you were
through fact-based observed and analyzed assessments
successful at harvesting management commitment, it is now time to take
the next step and take it quickly: turning strategy into action! Generally speaking, there are two main truths about an organization’s
The important thing to remember is to have a vision of what your suc- failure to self-attempt continuous improvement. One, an organization’s
cessful EAM will look like. Do not underestimate the power of gaining man- structure is designed to perform repetitive daily functions. Good industrial
agement commitment. process design, which includes all processes in the organization, is often
Here are the four crucial steps, including important reports, necessary not implemented at the outset of these daily functions. This means good
to move forward with EAM. industrial process design is not part of the repetitive functional process.
Therefore, poorly run processes are repeated day in and day out, and they
1. Determine poor performing operational areas within are even viciously guarded to ensure the repetition does not change, even
for the sake of improvement. This creates a culture where senior and mid-
each EAM work stream in order to establish a pilot
dle managers safeguard original organizational design practices and block
within each work stream good industrial process design. The result is an organization that cannot
Every company has known weak performing functions, whether it is in and will not change.
the process of sales, operations and planning, engineering change orders, Two, even when an organization has good intentions to break these
operations, or after delivery services. In order to implement change and cultural chains by establishing an internal continuous improvement (CI) team,
strengthen the weak functions, it is important for asset managers to go to this internal team is limited by its own fear of change unless there is outside
the right parties in the right order for their buy-in – a process that is extremely intervention. By promoting persons from within to the CI team, the existing
delicate. culture is reinforced. This leads to the CI team using math and science to
It is crucial to start with the department level managers and gain their reinforce its own poor practices. It’s understandable. Why would the CI team
commitment to allow for a fact-based assessment of the known weaknesses. make or recommend changes if its visionary members know they may one
Not only does this show respect for the department managers, it also pro- day be reassigned to those whom they want to change?
vides them the opportunity to take the initiative and start the EAM process Internal assessments always will be seen as biased within and between
with the team. departments. That is why it is absolutely necessary to hire third-party con-
Next, present the department level managers’ assessment of weaknesses sultants who are boots on the ground operators and can develop fact-based
to the executive level asset steering committee for approval. This ensures assessments without bias to speak the truth through observation, analysis
the department managers do not lead you down a wrong path. Since asset and facts. Remember, in many organizations, department managers will be
managers might not always know the functional problems very well, an in- defensive and want to discredit findings. Therefore, it is important to select
accurate assessment could steer you into a dead-end operation where there the right consulting firm that has the emotional maturity to baseline fact-
is not enough activity to determine a baseline for improvement. based performance.
40 june/july 17
3. Have the third party report the assessment sensitivity. These consultants provide fact-based reports that baseline the
and pilot program to the executive level current performance of the assessed scope and make realistic recommenda-
tions, complete with projected base and best-case financial and operational
asset steering committee improvements. The assessment reports need to reflect the magnitude and
The knowledge that the department and their respective vice president impact of the overarching asset measures and assess each measure in terms
will have their souls exposed to the executive management team is fright- of operating expense (Opex) and capital expenditure (Capex).
ening to that department. Luckily, consulting firms experienced in this area Figures 1 through 6 provide sample elements of such fact-based assess-
know how to manage this process effectively, professionally and with great ment reports in the operation of trains.
Yard
moves
are
supported
by
2,
3,
or
4
crews
of
two.
Based
on
observa:ons
and
discussions
with
locomo:ve
a>endants,
the
move
types
vary
across
shi?s,
with
night
shi?
suppor:ng
more
Current
staffing
is
not
matched
to
workload
a?er
factoring
for
work
content,
unplanned
work,
ac:vity
due
to
maintenance
and
servicing
needs.
arrival
varia:on
and
planned
worker
absence
Workload(VS.(Capacity(Model(
(Loca2on:"S&I"""Cra9:"Cleaner)"
S&I
Cleaner
Shi?
Pa>ern
Observed Activity Service
&
InspecJon
(S&I):
1800" 1800"
Su
Mo
Tu
We
Th
Fr
Sa
• Cleaner
uJlizaJon
is
66%
1440" 1440"
0!
0!
0!
0!
0!
0!
0!
0!
0!
1!
1!
1!
1!
1!
1!
1!
1!
0!
0!
0!
0!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
3!
0!
0!
0!
1!
1!
1!
1!
1!
1!
1!
1!
1!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
1!
1!
1!
1!
1!
1!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
1!
1!
1!
1!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
1!
0!
0!
0!
0!
1!
1!
1!
1!
1!
1!
1!
1!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
1!
1!
1!
1!
1!
1!
1!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
0!
1!
1!
1!
1!
1!
1!
1!
0!
1!
1!
1!
1!
0!
0!
07:00
1080" 1080"
09:00 • Big drop is during 10 p.m. – 6 a.m. shiF, which has light 720" 720"
13:00
0" 0"
07:00 15:00 23:00 7:00 • Workload
exceeds
current
staffing
during
10
a.m.
–
1
0:00" 1:00" 2:00" 3:00" 4:00" 5:00" 6:00" 7:00" 8:00" 9:00" 10:00" 11:00" 12:00" 13:00" 14:00" 15:00" 16:00" 17:00" 18:00" 19:00" 20:00" 21:00" 22:00" 23:00"
21:00
uJlizaJon
are
in
20-‐40%
range
even
aFer
factoring
for
480" 480"
420" 420"
23:00
01:00
unscheduled
repairs.
360"
300"
360"
300"
Moving
Not
Moving
No
Obvs.
03:00
240" 240"
180" 180"
60" 60"
2
Crews
of
two
42%
• Cleaner
uJlizaJon
is
22%.
Big
drop
is
due
to
redundant
0"
0:00" 1:00" 2:00" 3:00" 4:00" 5:00" 6:00" 7:00" 8:00" 9:00" 10:00" 11:00" 12:00" 13:00" 14:00" 15:00" 16:00" 17:00" 18:00" 19:00" 20:00" 21:00" 22:00" 23:00"
0"
3
Crews
of
two
(8
&
10
hour)
(4
in
Winter)
58%
staffing
that
overlaps
with
work
scope
of
outlier
locaJons.
Regular"coach" Superliner"coach" Regular"Sleeper" Superliner"sleeper"
Workload(VS.(Capacity(Model(
Diner" Locomo2ve" Availabe"work"mins"
Based&on&planned&jobs&
4
Crews
of
two
(Overlapping
10
hour
shiFs)
• Carman,
pipefi`er
and
laborer
uJlizaJon
are
in
15-‐20%
420"
Sta:on
Cleaner
(Loca2on:"CUS"""Cra8:"Cleaner)"
420"
*
All
shiFs
have
addiJonal
ground
crew
of
2-‐3
(Mechanic
and
Electrician)
range.
These
losses
are
driven
by
need
to
provide
360" 360"
240"
300"
240"
180" 180"
120" 120"
Proposed
Ac:on:
60" 60"
Workload in winter is roughly twice as heavy due to increased need for maintenance and service support, addiJonal Jme 0" 0"
spent
with
switches
due
to
ice
and
snow,
and
complicaJons
arising
from
components
freezing
in
low
temperatures.
Regular"coach" Superliner"coach" Regular"Sleeper" Superliner"sleeper" Diner" Locomo2ve" Availabe"work"mins"
Based&on&planned&jobs&
Performance
improvement
of
suppliers
can
reduce
late
orders
from
9%
to
3%.
Structure
of
supplier
base
enables
you
to
focus
on
the
26
major
ones
developing
a
direct
relaHonship
for
cost
and
quality
improvements.
This
has
not
been
regularly
done
in
the
past
(excepHon:
rails).
Nine
percent
of
all
P/Os
due
in
2015
have
been
delayed
more
than
one
week.
$6.000.000,00$$
$3.000.000,00$$
in place. $2.000.000,00$$
U E$L $
IL M $
FA ON MIL H$L $
EN RU AIL E$
$C IO C$
CS A $
H IT R AN GN $
$B $H $A L $
RIE AU N$I $
S $
N DU EN AD D.$
ER S$( IP $
EP FA KO $
FE ES RIN $
.$ $
$
U OD S$L $
CT CT D$
ER OT ING C$
$
IT Y TR $
Q S$I $
IM C$
M $
IT AB T$
E $
TE 9)$ $
$S C$
$
X$M LE U KA A$
N
/C IC E
RA STO TD
C C
O AD NC
H A C
IL A S
TE DR IO C
S$C LIC NC
W IE U C
ES
RIS CT NE
LL $L.M G
S P IE A D
AN $PR PLIE NC
SM UX NO TD
H $S C C
G EM U
IP C
ER TD
AT 8 D
ED
AM IS A IC U
N RV G
ST T R E
$S W EN
TE $IN
AL CT $IN
EC M $IN
AT Y CT $IN
O R Q $IN
AT C UR $IN
W ITH LE X$IN
$L E
RY IN
U N
G E$C ITE
FA U T
TIO
$B 19 $LT
AN OF E$S AN D
IN ST IQ
EN N T AN $LT
AL
T
H T
IA E$I $L
PH $L
IT
PR AN N$I
X P $I
$P ST A A
S
RA
material
availability.
O
B
RP
$E
RO E
FA
D AM LO D
$E
U $S
TR U
O
M
D Y$&
N AN
A$C
$M
N
LE E$M
EN PL
AD
TO
D
H
P
$C
O
AN
IT
PR AL HN
IL
IE
S$E
O
$S
E$M
H
AM
$P $I
AN
SC
TW
LD BR
N EC
CO
CW
ST ECH
N
$D
H
IO T
IT
AB
ES
AM
RA
IC
EA CT
RS
U
W
M
AL
$T
U
AIL
RA
SE
ET
O
AT
IS
G
M
$R
RN
RN
SS
RE
U
TE
O
G
IN
Y$F
O
PR
RA
G
REALISTIC
In
the
future,
Site
2
will
have
a
total
of
20
full
1me
employees
(FTE)
dedicated
to
contract
work.
DIMENSION
MEASURE
CURRENT
BEST
CASE
FUTURE
STATE
Based
on
Site
1
work
pipeline
and
profitability,
you
can
select
one
of
these
workload
scenarios.
Lost
&me
injuries
per
200,000
labor
hours
5.38
1
1.5
SAFETY
#
lost
&me
injuries
26
3
7
BASELINE SCENARIO 1 SCENARIO 2 SCENARIO 3
Post
E
90
day
failure
rate
-‐
loco
2.72
1.5
2.31
Wheels
and
Engine
Wheels
and
TM
Wheels,
Engine
and
Baseline
Contract
Produc1on
Focus
Focus
TM
Focus
RELIABILITY
Post
E
90
day
failure
rate
-‐
car
3.26
2.71
Expected
1me
standard
aOer
Current
improvement
#
delays
per
month
(Mechanical
only)
39
35
Annual
Arr
–
Dep
Annual
Arr
–
Dep
Annual
Arr
–
Dep
Contract
Work
Type
Annual
(hrs)
Prod.
Prod.
Time
Prod.
Time
Prod.
Time
PRODUCTION/ Availability
-‐
Loco
79.1%
90%
85%
AVAILABILITY
Availability
-‐
Car
79.3%
90%
85%
Wheel
Sets
183
4
800
1
week
800
1
week
800
1
week
Engine
Overhaul
1
400
25
3
weeks
2
-‐
10
6
weeks
Wrench
turn
&me
45%
80%
60%
Trac-on
Motor
Repair
4
40
8
250
1
week
150
1
week
Cars/
locos
wai&ng
for
material
4-‐6
0
2-‐3
Trac-on
Motor
Replace
6
24
16
250
1
week
150
1
week
COST
Outside
Maintenance
2
30
2
2
2
Inventory
-‐
relates
to
overstock
$2.6M
$1.3M
(as
it
impacts
availability
to
opera&ons)
reduc&on
reduc&on
Revenue $320,000 $7,212,000 $4,918,000 $5,489,000
#
ideas
from
craU
per
month
<
0.1
2
1
Annual Profit $47,500 $1,095,000 $696,000 $803,000
Center
of
Excellence
(CoE)
ENGAGEMENT
Level
0-‐1
Level
5
Level
4
1. Cost
basis
–
es-mated
material
cost
from
work
scope;
labor
cost
based
on
standard
hours,
$74
per
labor
hour,
maturity
matrix
score
future
efficiency
Supervisor
Leadership
Behavior
compliance
39%
95%
90%
2. Revenue
basis
–
20%
material
markup;
15%
labor
markup
Figures 1-6: Snippets of fact-based assessments in train operations
june/july 17 41
LER
4. Develop work streams to achieve the owners, typically the vice presidents, present their work streams linked to the
overarching asset measure overall financial and operational benefits. For large, heavy asset companies
where sales are typically more than $10 billion, this may be up to a $700
Once the fact-based assessment and recommendations are presented million long-term benefit, which is a very exciting proposition to the CEO
with impact and the asset manager has the executive asset management and board.
steering committee’s attention, it is time to sell the next phase: the develop- Figures 7 through 12 showcase examples of how work streams link to
ment of work streams linking to the overall asset performance measure. In overall company benefits.
the next report to the executive steering committee, the functional business
Top level work plan for each stream with clearly defined current and future state, measures
and unit cost impact- Assign Champions for each Work Stream REPEAT FOR EACH WORK STREAM
Current Future
Avg. Terminal Dwell (1)
Improve assignment of locomotives to Avg. Terminal Dwell
Train ID
16.6 hours 14.1 hours
Infrastructure API
Asset Productivity Losses
25% fleet reduction (flat lined demand) › Infrastructure vision is set to improving line Engineering Asset Group
Equipment Effective Index - System Overview
30%
Impact Utilization Impact Reliability
maintenance 20%
›
10%
Process and labor planning variations
Asset
Performance
0%
Total track Time Table Clearance Train Meets / System Maintenance & Slow Signal OOS EEI
time @ speed Speed restrictions Spacing Production / Inspection Orders Delays
Index
Increase
Restrictions Construction
Locomotive API
Asset Productivity Losses
70% 10%
to managing locomotive assets 60% 2% 2% 4%
›
10%
These gaps impact service and also reduce asset 50%
9% EEI=
40% 32%
productivity by 30% 30%
20%
Impact Utilization Impact Reliability
10%
0%
Total Active Train to Train Intermediate LOR Reposition Fallout Repair and Other time EEI
fleet time time loss time loss time loss time loss time loss PM time loss loss
42 june/july 17
The functional business
Houston Chapter of SMRP
owners present their 11 th annual Maintenance
work streams linked to & Reliability Symposium
August 9—11, 2017
the overall financial and Moody Gardens Hotel
Galveston, TX
operational benefits.
Keynote by R. Keith Mobley, SME
Next Steps Golf Tournament & Workshops August 9, 2017
Once an asset manager has accomplished the above steps, he or she has
achieved the first major milestone of putting strategy into action. Most asset Technical Presentations by speakers from major industries
managers do not make it this far, mainly because they are not successful in following the five pillars of SMRP and a Maintenance &
articulating the linkage between better availability and utilization of assets Operations track August 10th. Panel discussions by industry
for improving operating performance, future Capex offset and contribution leaders on August 11th
margin capacity through improved use of the key assets. This is when an asset
• Great opportunities for learning & networking
manager has the attention of senior management; it is now time to develop
• Net proceeds go to fund scholarships and grants for
and deploy enterprise asset management.
students in the Technical, Maintenance and Reliability fields
• Auction of Sports Memorabilia from Diamonds in the Rough
James Mourafetis is a Senior Vice President and leads
Argo Consulting’s Railroad and Public Transportation • “Stay-cation” for those in the Gulf Coast area—
practice. He is a thought leader in operational excellence Bring the family to Moody Gardens and Schlitterbahn!
and enterprise asset management in the Class 1 rail
industry and the world’s largest public transportation Thank you to the following sponsors & associations for their support
agency. James has led many large and global operational
improvement initiatives, as well as leading industry
initiatives in transportation and mining to improve
the availability, reliability and utilization of infrastructure, equipment and
workforce productivity. www.argoconsulting.com For information or to register visit: www.smrphouston.org