Professional Documents
Culture Documents
Engine Retoque A40g
Engine Retoque A40g
Tightening torques according to Volvo standard tightening torques, unless otherwise specified.
Valve cover
Figure 1
Valve mechanism
Figure 2
Valve mechanism
Figure 4
The illustration shows D13J but the tightening torques and the steps are the same also for other engines
Step 4: Tighten the bolts 8–13 in the order 11, 10, 12, 9, 13, 8. 40 ±3 Nm (30 ±2.2 lbf ft)
Step 5: Angle-tighten the bolts 8–13 in the order 11, 10, 12, 9, 120° ±5°
13, 8.
Step 6: Loosen the bolts 14–19.
Step 7: Tighten the bolts 14–19 in the order 17, 16, 18, 15, 19, 40 ±3 Nm (30 ±2.2 lbf ft)
14.
Step 8: Angle-tighten the bolts 14–20 in the order 17, 16, 18, 120° ±5°
15, 19, 14, 20.
Cylinder head
Figure 5
Step 1: Tighten the bolts in numerical order according to 100 ±5 Nm (74 ±3.7 lbf ft)
figure.
Step 2: Angle-tighten the bolts in numerical order according 120° ±5°
to figure.
Step 3: Angle-tighten the bolts in numerical order according 90° ±5°
to figure.
Timing gear
Figure 6
Timing gear
Figure 7
NOTE!
Install the new gasket from A to B as shown in the figure. Make sure the gasket is correctly positioned in the corners.
Figure 8
NOTE!
Apply sealant 11713514, approx. Ø2 mm (0.078 in), as shown in the figure. The timing gear casing must be installed and torque-
tightened within 20 minutes as the sealant will harden.
Figure 9
Timing gear casing, upper
Flywheel housing
Figure 10
Flywheel housing
Step 1: Tighten the bolts 1–7 (M14 bolts) 160 ±10 Nm (118 ±7.4 lbf ft)
Step 2: Tighten the bolts 8–11 (M10 bolts) 60 ±6 Nm (44 ±4.4 lbf ft)
Step 3: Tighten the bolt 12 (M16 bolt) 100 ±5 Nm (74 ±3.7 lbf ft)
Flywheel
Figure 11
Step 1: Tighten the bolts in numerical order according to 60 ±5 Nm (44 ±3.7 lbf ft)
figure.
Step 2: Angle-tighten the bolts in numerical order according 190° ±10°
to figure.
Step 1: Tighten the bolts in crosswise order. 35 ±5 Nm (25.8 ±3.7 lbf ft)
Step 2: Tighten the bolts in crosswise order. 90 ±10 Nm (66.4 ±7.4 lbf ft)
Step 1: Fasten the cover with the bolts 2 and 7. Tighten to contact.
Step 2: Install the bolts 1, 3–6, 8. Tighten to contact.
Step 3: Tighten the bolts 2 and 7. 24 ±3 Nm (18 ±3 lbf ft)
Step 4: Tighten the bolts 1, 3–6, 8 in numerical order according 24 ±3 Nm (18 ±3 lbf ft)
to figure.
Figure 13
Step 1: Tighten the bolts in numerical order according to 5 ±2 Nm (3.7 ±1.5 lbf ft)
figure.
Step 2: Tighten the bolts in numerical order according to 275 ±45 Nm (203 ±33 lbf ft)
figure.
Figure 14