You are on page 1of 1

ESSAR LABORATORIES AND RESEARCH CENTRE .

INDUCTION AND ORIENTATION RECORD

From HR Department To Mechanical – Building Materials, NDT Personnel Job


Department Reporting Date

TOOLS GIVEN BY HR AND THE WORKING DEPARTMENT HEAD

TOOLS NAME RETURNABLE / NON- TOOLS NAME RETURNABLE / NON-


RETURNABLE RETURNABLE
Apron Non-Returnable
Gloves Non-Returnable
Mask Non-Returnable
Cap Non-Returnable
Helmet (On Site) Returnable
Goggles (On Site) Returnable
Safety Jacket (On Site) Returnable

Mr/Ms…………………………………… has joined in our Organization effective from …………….....…..He /She will be on induction and
orientation program From………………………. To…………………..

Kindly explain the functional responsibilities of each department to her/him


He is looking after testing of Building Materials: Aggregates, Paver Blocks & Concrete

SCHEDULE FOR INDUCTION

Date Time Department Induction/Orientation provided by the Department Provided by Signature


10 to 6 Operations Lab Quality Policy, Quality Objectives, HR Policy &
Impartiality Policy
10 to 6 Mechanical Testing Introduction of al instruments & its use, calibration,
maintenance etc..
10 to 6 Mechanical Testing All materials testing

10 to 6 Mechanical Testing Field Visit

10 to 6 Mechanical Testing GLP & Documentation, Handling of testing materials & Lab
equipments

Declaration

I have under stood the procedure of each department and received the above mentioned tools.

Signature of Personnel

Signature of Process In charge

Signature of HR In charge

Format No.:6.2 F(5) Revision No.0, Revision Date: 3-8-2018 Issue Date: Empty Format Empty Format
10-8-2018 Effective Date: 17-8-2018 Reference Procedure No.: EPM 6.2 prepared by approved by
Page 1 of 1 sign sign

You might also like