You are on page 1of 38

N TARA

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

PESO
TARA
77.1
77.6
73.8
79.1
76.7
77.3
76.9
74.7
78.2
74.4
76.1
75.7
76.8
78.2
79.9
80.0
76.8
78.8
78.2
79.6

MOLDES

PESO

PROCTOR

MOLDE

N TARA

21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

VOLUMEN

0
1

2773

2058

2758

2075

2300

2000

2668

2090

4
5

PESO
TARA
77.6
78.8
80.3
80.0
78.7
77.1
78.3
77.5
78.2
81.9
74.4
77.5
74.9
76.4
78.7
77.0
77.7
78.2
80.9
77.9

PESO DE MOLDES DE CBR

6
7
15

PESO MOLDE
ALTURA
DIAMETROVOLUMEN
(SIN BASE)

3917
4081
4040

# #
# #
# #

2335
2323
2305

13
16
17

3945
4100
3840

# #
# #
# #

2323
2335
2305

22
23
24

4086
4000
4047

30
40
41

4168
4012
3931

43
45
47

BASE

AREA

#
#
#
#
#
#

#
#
#

2252
2250
2276

#
#
#

# #
# #
# #

2305
2323
2353

#
#
#

3992
3928
4116

# #
# #
# #

2323
2305
2353

#
#
#

60
61
62

4072
4020
3827

# #
# #
# #

2305
2335
2305

#
#
#

64
65
67

3965
4027
4103

# #
# #
# #

2305
2305
2305

#
#
#

68
69
70

4974
4218
5080

# #
# #
# #

2335
2286
2305

#
#
#

71
72
73

5055
4545
5339

# #
# #
# #

2305
2321
2286

#
#
#

74
75
76

4410
4092
4109

# #
# #
# #

2268
2268
2286

#
#
#

77
78
79

4594
4242
5074

# #
# #
# #

2310
2332
2305

#
#
#

1
2
3

4894
4853
4809

# #
# #
# #

2323
2323
2323

8
9
10

4924
4732
4789

# #
# #
# #

2323
2323
2323

#
#
#

18
19
20

4780
4773
4782

# #
# #
# #

2323
2323
2323

#
#
#

25
26
27

4881
4719
4834

# #
# #
# #

2323
2323
2323

#
#
#

31
32
33

4811
4767
4658

# #
# #
# #

2323
2323
2323

#
#
#

34
35
36

4825
4828
4757

# #
# #
# #

2323
2323
2323

#
#
#

37
38
39

4896
4750
4695

# #
# #
# #

2323
2323
2323

#
#
#

48
49
50

4814
4832
4811

# #
# #
# #

2323
2323
2323

#
#
#

51
52
53

4831
4811
4764

# #
# #
# #

2323
2323
2323

#
#
#

54
55
56

4702
4725
4785

# #
# #
# #

2323
2323
2323

#
#
#

#
#
#

#
#
#

CAPSULAS DE
ALUMINIO
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

PESO
TARA
0
77.1
77.6
73.8
79.1
76.7
77.3
76.9
74.7
78.2
74.4
76.1
75.7
76.8
78.2
79.9
80.0
76.8
78.8
78.2
79.6
77.6
78.8
80.3
80.0
78.7
77.1
78.3
77.5
78.2
81.9
74.4
77.5
74.9
76.4
78.7
77.0
77.7
78.2
80.9
77.9

MOLDES

PESO

PROCTOR

MOLDE

PESO DE MOLDES DE CBR


^

6
7
15

VOLUMEN

0
1

2773

2058

2758

2075

2300

2000

2668

2090

4
5

PESO MOLDE
ALTURA
DIAMETROVOLUMEN
(SIN BASE)

3917
4081
4040

# #
# #
# #

2335
2323
2305

13
16
17

3945
4100
3840

# #
# #
# #

2323
2335
2305

22
23
24

4086
4000
4047

30
40
41

4168
4012
3931

43
45
47

BASE

AREA

#
#
#
#
#
#

#
#
#

2252
2250
2276

#
#
#

# #
# #
# #

2305
2323
2353

#
#
#

3992
3928
4116

# #
# #
# #

2323
2305
2353

#
#
#

60
61
62

4072
4020
3827

# #
# #
# #

2305
2335
2305

#
#
#

64
65
67

3965
4027
4103

# #
# #
# #

2305
2305
2305

#
#
#

68
69
70

4974
4218
5080

# #
# #
# #

2335
2286
2305

#
#
#

71
72
73

5055
4545
5339

# #
# #
# #

2305
2321
2286

#
#
#

74
75
76

4410
4092
4109

# #
# #
# #

2268
2268
2286

#
#
#

77
78
79

4594
4242
5074

# #
# #
# #

2310
2332
2305

#
#
#

1
2
3

4894
4853
4809

# #
# #
# #

2323
2323
2323

8
9
10

4924
4732
4789

# #
# #
# #

2323
2323
2323

#
#
#

18
19
20

4780
4773
4782

# #
# #
# #

2323
2323
2323

#
#
#

25
26
27

4881
4719
4834

# #
# #
# #

2323
2323
2323

#
#
#

31
32
33

4811
4767
4658

# #
# #
# #

2323
2323
2323

#
#
#

34
35
36

4825
4828
4757

# #
# #
# #

2323
2323
2323

#
#
#

37
38
39

4896
4750
4695

# #
# #
# #

2323
2323
2323

#
#
#

48
49
50

4814
4832
4811

# #
# #
# #

2323
2323
2323

#
#
#

51
52
53

4831
4811
4764

# #
# #
# #

2323
2323
2323

#
#
#

54
55
56

4702
4725
4785

# #
# #
# #

2323
2323
2323

#
#
#

#
#
#

#
#
#

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Sergut
Campamento 101+500
Banco de prestamo lado izq.
Terrapln
Grava arcilla Color Marrn

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000
Profundidad, m / capa, n
Descripcin de la muestra:
Molde

Registro:
25
Fecha:
29-jul.-2010

n.

Molde + suelo hmedo

7560

8073

8099

7595

Peso del molde

3134

3134

3134

3134

Peso suelo hmedo

4426

4939

4965

4461

Volumen del molde

g/cm

2204

2204

2204

2204

Densidad suelo hmedo

g/cm

2.008

Cpsula

2.241
2.253
DETERMINACIN DE LA HUMEDAD

2.024

n.

16

Cpsula+suelo hmedo

354.10

370.70

325.80

355.60

Cpsula+suelo seco

327.00

340.20

296.80

319.80

Peso del gua

27.10

30.50

29.00

35.80

Peso cpsula

47.20

56.60

51.60

57.50

Peso suelo seco

279.80

283.60

245.20

262.30

Humedad

9.7

10.8

11.8

13.6

Humedad mdia

9.69

10.75

11.83

13.65

g/cm

1.831

2.023

2.014

1.781

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

Energia Compactacin
Golpes kg/cm2
56

28.22

Tipo
Modificado

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

2.040

Humedad ptima, %:

11.2

2.060
2.040

2.020

Densidad Aparente Seca, g/cm

2.000
1.980
1.960

1.940
1.920
1.900

1.880
1.860
1.840
1.820

1.800
1.780

10

11

12

13

Humedad, %
Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Sergut

Procedencia muestra

Campamento 101+500

Registro:

Muestra, n, Tramo, KM+000

Banco de prestamo lado izq.

Profundidad, m / capa, n

Terrapln

Descripcin de la muestra:

Grava arcilla Color Marrn

25
Fecha:
29-jul.-2010
MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

109.0

112.1

102.2

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Sergut

Procedemcia muestra

Campamento 101+500

Registro:

Muestra, n, Tramo, KM+000

Banco de prestamo lado izq.

Profundidad, m / capa, n

Terrapln

Descripcin de la muestra:

Grava arcilla Color Marrn

25
Fecha:
29-jul.-2010

GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

112.1

41.11

52.41

102.2 80 24.63

28.84

ndice de Soporte Califrnia, %

109.0

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:

2.040

Humedad ptima, %:

11.2

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Convisa
32+100
Rio Quibribey (prog. 0+000 poblac. Charal)

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:

7.00

Fecha:

15/07/10

Profundidad, m / capa, n

Deposito aluvial

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

10235

10390

10530

10590

Peso del molde

5405

5405

5405

5405

Peso suelo hmedo

4830

4985

5125

5185

Volumen del molde

g/cm

2104

2104

2104

2104

Densidad suelo hmedo

g/cm

2.296

Cpsula

2.369
2.436
DETERMINACIN DE LA HUMEDAD

n.

23

10

12

446.00

462.00

491.00

445.00

Cpsula+suelo seco

435.00

443.00

464.00

415.00

Peso del gua

11.00

19.00

27.00

30.00

Peso cpsula

41.1

46.4

85.0

85.0

Peso suelo seco

393.90

396.60

379.00

330.00

Humedad

2.8

4.8

7.1

9.1

Humedad mdia

2.8

4.8

7.1

9.1

g/cm

2.233

2.261

2.274

2.259

Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

Energia Compactacin
Golpes kg/cm2
56

28.22

Tipo
Modificado

2.464

Cpsula+suelo hmedo

Densidad suelo seco

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

2.274

Humedad ptima, %:

7.0

Grfico: Densidad Seca vs Contenido de Humedad

Densidad Aparente Seca, g/cm

2.270

2.250

2.230

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

10

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Convisa

Procedencia muestra

32+100

Muestra, n, Tramo, KM+000

Rio Quibribey (prog. 0+000 poblac. Charal)

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Deposito aluvial
MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

97.8

100.6

91.7

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Convisa

Procedemcia muestra

32+100

Muestra, n, Tramo, KM+000

Rio Quibribey (prog. 0+000 poblac. Charal)

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Deposito aluvial
GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

41.11

52.41

91.7 80 24.63

28.84

ndice de Soporte Califrnia, %

97.8
100.6

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:
Humedad ptima, %:

2.274
7.0

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Convisa
5+100
Prestamo lateral

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:
Fecha:

12.00
14/07/10

Profundidad, m / capa, n

Prestamo lateral lado izquierdo

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

5330

5480

5585

5500

Peso del molde

3453

3453

3453

3453

Peso suelo hmedo

1877

2027

2132

2047

Volumen del molde

g/cm

959

959

959

959

Densidad suelo hmedo

g/cm

1.957

Cpsula

2.114
2.223
DETERMINACIN DE LA HUMEDAD

2.135

n.

10

12

Cpsula+suelo hmedo

393.10

330.10

352.90

371.10

Cpsula+suelo seco

374.30

308.50

325.10

334.00

Peso del gua

18.80

21.60

27.80

37.10

Peso cpsula

41.1

46.4

85.0

85.0

Peso suelo seco

333.20

262.10

240.10

249.00

Humedad

5.6

8.2

11.6

14.9

Humedad mdia

5.6

8.2

11.6

14.9

g/cm

1.853

1.953

1.992

1.858

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

Energia Compactacin
Golpes kg/cm2
56

Tipo

28.22

Modificado

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

1.996

Humedad ptima, %:

10.9

Grfico: Densidad Seca vs Contenido de Humedad

2.010

Densidad Aparente Seca, g/cm

1.990

1.970
1.950
1.930
1.910
1.890
1.870
1.850

10

11

12

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

13

14

15

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Convisa

Procedencia muestra

5+100

Muestra, n, Tramo, KM+000

Prestamo lateral

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Prestamo lateral lado izquierdo


MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

111.4

114.6

104.5

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Convisa

Procedemcia muestra

5+100

Muestra, n, Tramo, KM+000

Prestamo lateral

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Prestamo lateral lado izquierdo


GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

114.6

41.11

52.41

104.5 80 24.63

28.84

ndice de Soporte Califrnia, %

111.4

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:

1.996

Humedad ptima, %:

10.9

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Convisa
6+500
Prestamo lateral

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:

11.00

Fecha:

14/07/10

Profundidad, m / capa, n

Prestamo lateral lado izquierdo

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

5210

5425

5520

5425

Peso del molde

3453

3453

3453

3453

Peso suelo hmedo

1757

1972

2067

1972

Volumen del molde

g/cm

959

959

959

959

Densidad suelo hmedo

g/cm

1.832

Cpsula

2.056
2.155
DETERMINACIN DE LA HUMEDAD

2.056

n.

Cpsula+suelo hmedo

364.00

310.00

352.00

313.00

Cpsula+suelo seco

339.00

282.00

314.00

273.00

Peso del gua

25.00

28.00

38.00

40.00

Peso cpsula

45.2

39.1

46.4

41.1

Peso suelo seco

293.80

242.90

267.60

231.90

Humedad

8.5

11.5

14.2

17.2

Humedad mdia

8.5

11.5

14.2

17.2

g/cm

1.688

1.844

1.887

1.754

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

Energia Compactacin
Golpes kg/cm2
56

28.22

Tipo
Modificado

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

1.889

Humedad ptima, %:

13.8

Grfico: Densidad Seca vs Contenido de Humedad


1.890
1.870

Densidad Aparente Seca, g/cm

1.850

1.830
1.810
1.790
1.770
1.750

1.730
1.710
1.690
1.670
1.650

10

11

12

13

14

15

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

16

17

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Convisa

Procedencia muestra

6+500

Muestra, n, Tramo, KM+000

Prestamo lateral

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Prestamo lateral lado izquierdo


MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

117.8

121.1

110.4

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Convisa

Procedemcia muestra

6+500

Muestra, n, Tramo, KM+000

Prestamo lateral

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Prestamo lateral lado izquierdo


GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

121.1

41.11

52.41

110.4 80 24.63

28.84

ndice de Soporte Califrnia, %

117.8

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:

1.889

Humedad ptima, %:

13.8

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Convisa
7+100
Rio Caripo

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:
Fecha:

14.00
14/07/10

Profundidad, m / capa, n

Deposito aluvial

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

10135

10330

10455

10485

Peso del molde

5405

5405

5405

5405

Peso suelo hmedo

4730

4925

5050

5080

Volumen del molde

g/cm

2104

2104

2104

2104

Densidad suelo hmedo

g/cm

2.248

Cpsula

2.341
2.400
DETERMINACIN DE LA HUMEDAD

2.414

n.

Cpsula+suelo hmedo

436.00

371.00

400.00

450.00

Cpsula+suelo seco

423.00

354.00

375.00

415.00

Peso del gua

13.00

17.00

25.00

35.00

Peso cpsula

45.2

39.1

40.0

41.8

Peso suelo seco

377.80

314.90

335.00

373.20

Humedad

3.4

5.4

7.5

9.4

Humedad mdia

3.4

5.4

7.5

9.4

g/cm

2.173

2.221

2.234

2.207

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

56

Tipo

28.22

Modificado

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

2.234

Humedad ptima, %:

7.0

Grfico: Densidad Seca vs Contenido de Humedad

2.240

Densidad Aparente Seca, g/cm

Energia Compactacin
Golpes kg/cm2

2.220

2.200

2.180

2.160

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Convisa

Procedencia muestra

7+100

Muestra, n, Tramo, KM+000

Rio Caripo

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Deposito aluvial
MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

99.6

102.4

93.4

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Convisa

Procedemcia muestra

7+100

Muestra, n, Tramo, KM+000

Rio Caripo

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Deposito aluvial
GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

41.11

52.41

93.4 80 24.63

28.84

ndice de Soporte Califrnia, %

99.6
102.4

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:
Humedad ptima, %:

2.234
7.0

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Convisa
12+000
Rio Yacumita

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:

9.00

Fecha:

15/07/10

Profundidad, m / capa, n

Deposito aluvial

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

10245

10445

10570

10590

Peso del molde

5405

5405

5405

5405

Peso suelo hmedo

4840

5040

5165

5185

Volumen del molde

g/cm

2104

2104

2104

2104

Densidad suelo hmedo

g/cm

2.300

Cpsula

2.395
2.455
DETERMINACIN DE LA HUMEDAD

2.464

n.

Cpsula+suelo hmedo

492.00

476.00

459.00

436.00

Cpsula+suelo seco

483.00

459.00

436.00

408.00

Peso del gua

9.00

17.00

23.00

28.00

Peso cpsula

41.8

40.0

45.2

39.1

Peso suelo seco

441.20

419.00

390.80

368.90

Humedad

2.0

4.1

5.9

7.6

Humedad mdia

2.0

4.1

5.9

7.6

g/cm

2.254

2.302

2.318

2.291

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

56

28.22

Resultado Ensayo de Compactacin

Tipo

Densidad Aparente Seca Mxima, g/cm3:

Modificado

2.319

Humedad ptima, %:

5.7

Grfico: Densidad Seca vs Contenido de Humedad

2.330

Densidad Aparente Seca, g/cm

Energia Compactacin
Golpes kg/cm2

2.310

2.290

2.270

2.250

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Convisa

Procedencia muestra

12+000

Muestra, n, Tramo, KM+000

Rio Yacumita

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Deposito aluvial
MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

95.9

98.6

89.9

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Convisa

Procedemcia muestra

12+000

Muestra, n, Tramo, KM+000

Rio Yacumita

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Deposito aluvial
GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

98.6

41.11

52.41

89.9 80 24.63

28.84

ndice de Soporte Califrnia, %

95.9

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:
Humedad ptima, %:

2.319
5.7

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Convisa
12+900
Cantera La Cruz

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:

13.00

Fecha:

14/07/10

Profundidad, m / capa, n

Cantera

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

9830

10000

10105

10140

Peso del molde

5405

5405

5405

5405

Peso suelo hmedo

4425

4595

4700

4735

Volumen del molde

g/cm

2104

2104

2104

2104

Densidad suelo hmedo

g/cm

2.103

Cpsula

2.184
2.234
DETERMINACIN DE LA HUMEDAD

2.250

n.

Cpsula+suelo hmedo

468.70

407.50

365.40

471.80

Cpsula+suelo seco

456.90

391.20

344.40

436.30

Peso del gua

11.80

16.30

21.00

35.50

Peso cpsula

40.0

45.2

39.1

41.8

Peso suelo seco

416.90

346.00

305.30

394.50

Humedad

2.8

4.7

6.9

9.0

Humedad mdia

2.8

4.7

6.9

9.0

g/cm

2.045

2.086

2.090

2.065

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

56

28.22

Tipo
Modificado

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

2.093

Humedad ptima, %:

6.0

Grfico: Densidad Seca vs Contenido de Humedad

2.100

Densidad Aparente Seca, g/cm

Energia Compactacin
Golpes kg/cm2

2.080

2.060

2.040

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

10

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Convisa

Procedencia muestra

12+900

Muestra, n, Tramo, KM+000

Cantera La Cruz

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Cantera
MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

106.3

109.3

99.6

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Convisa

Procedemcia muestra

12+900

Muestra, n, Tramo, KM+000

Cantera La Cruz

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Cantera
GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

109.3

41.11

52.41

99.6 80 24.63

28.84

ndice de Soporte Califrnia, %

106.3

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:
Humedad ptima, %:

2.093
6.0

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Sergut
99+940
Prestamo lateral

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:

10.00

Fecha:

14/07/10

Profundidad, m / capa, n

Prestamo lateral derecho

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

5265

5400

5525

5530

Peso del molde

3453

3453

3453

3453

Peso suelo hmedo

1812

1947

2072

2077

Volumen del molde

g/cm

959

959

959

959

Densidad suelo hmedo

g/cm

1.889

Cpsula

2.030
2.161
DETERMINACIN DE LA HUMEDAD

2.166

n.

12

Cpsula+suelo hmedo

397.00

318.00

504.00

254.20

Cpsula+suelo seco

386.00

305.00

469.00

231.80

Peso del gua

11.00

13.00

35.00

22.40

Peso cpsula

87.0

88.0

85.0

41.1

Peso suelo seco

299.00

217.00

384.00

190.70

Humedad

3.7

6.0

9.1

11.7

Humedad mdia

3.7

6.0

9.1

11.7

g/cm

1.822

1.915

1.980

1.938

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

Energia Compactacin
Golpes kg/cm2
56

28.22

Tipo
Modificado

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

1.980

Humedad ptima, %:

9.3

Grfico: Densidad Seca vs Contenido de Humedad

2.000
1.980

Densidad Aparente Seca, g/cm

1.960
1.940

1.920
1.900
1.880
1.860

1.840
1.820
1.800

10

12

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

14

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Sergut

Procedencia muestra

99+940

Muestra, n, Tramo, KM+000

Prestamo lateral

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Prestamo lateral derecho


MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

112.3

115.5

105.3

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Sergut

Procedemcia muestra

99+940

Muestra, n, Tramo, KM+000

Prestamo lateral

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Prestamo lateral derecho


GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

115.5

41.11

52.41

105.3 80 24.63

28.84

ndice de Soporte Califrnia, %

112.3

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:
Humedad ptima, %:

1.980
9.3

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Sergut
95+100
Prestamo lateral

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:

6.00

Fecha:

6/07/10

Profundidad, m / capa, n

Prestamo lateral izquierdo

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

5245

5415

5530

5470

Peso del molde

3453

3453

3453

3453

Peso suelo hmedo

1792

1962

2077

2017

Volumen del molde

g/cm

959

959

959

959

Densidad suelo hmedo

g/cm

1.869

Cpsula

2.046
2.166
DETERMINACIN DE LA HUMEDAD

2.103

n.

10

11

Cpsula+suelo hmedo

344.00

331.00

434.00

420.00

Cpsula+suelo seco

330.00

312.00

398.00

378.00

Peso del gua

14.00

19.00

36.00

42.00

Peso cpsula

88.0

85.0

91.0

86.0

Peso suelo seco

242.00

227.00

307.00

292.00

Humedad

5.8

8.4

11.7

14.4

Humedad mdia

5.8

8.4

11.7

14.4

g/cm

1.766

1.888

1.938

1.839

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

Energia Compactacin
Golpes kg/cm2
56

28.22

Tipo
Modificado

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

1.942

Humedad ptima, %:

11.0

Grfico: Densidad Seca vs Contenido de Humedad

1.960
1.940

Densidad Aparente Seca, g/cm

1.920
1.900
1.880
1.860
1.840

1.820
1.800
1.780
1.760
1.740

10

12

14

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

16

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Sergut

Procedencia muestra

95+100

Muestra, n, Tramo, KM+000

Prestamo lateral

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Prestamo lateral izquierdo


MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

114.5

117.8

107.4

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Sergut

Procedemcia muestra

95+100

Muestra, n, Tramo, KM+000

Prestamo lateral

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Prestamo lateral izquierdo


GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

117.8

41.11

52.41

107.4 80 24.63

28.84

ndice de Soporte Califrnia, %

114.5

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:

1.942

Humedad ptima, %:

11.0

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Sergut
98+100
C. O Botadero

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:

3.00

Fecha:

6/07/10

Profundidad, m / capa, n

C. O Botadero

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

10135

10340

10495

10480

Peso del molde

5405

5405

5405

5405

Peso suelo hmedo

4730

4935

5090

5075

Volumen del molde

g/cm

2104

2104

2104

2104

Densidad suelo hmedo

g/cm

2.248

Cpsula

2.346
2.419
DETERMINACIN DE LA HUMEDAD

2.412

n.

11

10

Cpsula+suelo hmedo

474.00

429.00

422.00

435.00

Cpsula+suelo seco

457.00

408.00

395.00

400.00

Peso del gua

17.00

21.00

27.00

35.00

Peso cpsula

86.0

87.0

91.0

85.0

Peso suelo seco

371.00

321.00

304.00

315.00

Humedad

4.6

6.5

8.9

11.1

Humedad mdia

4.6

6.5

8.9

11.1

g/cm

2.150

2.202

2.222

2.171

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

Energia Compactacin
Golpes kg/cm2
56

28.22

Tipo
Modificado

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

2.223

Humedad ptima, %:

8.5

Grfico: Densidad Seca vs Contenido de Humedad

2.240

Densidad Aparente Seca, g/cm

2.220

2.200

2.180

2.160

2.140

10

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

11

12

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Sergut

Procedencia muestra

98+100

Muestra, n, Tramo, KM+000

C. O Botadero

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

C. O Botadero
MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

100.1

102.9

93.8

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Sergut

Procedemcia muestra

98+100

Muestra, n, Tramo, KM+000

C. O Botadero

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

C. O Botadero
GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

102.9

41.11

52.41

93.8 80 24.63

28.84

ndice de Soporte Califrnia, %

100.1

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:
Humedad ptima, %:

2.223
8.5

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Sergut
98+320
Prestamo lateral

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:

4.00

Fecha:

5/07/10

Profundidad, m / capa, n

Prestamo lateral izquierdo

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

5325

5480

5555

5460

Peso del molde

3453

3453

3453

3453

Peso suelo hmedo

1872

2027

2102

2007

Volumen del molde

g/cm

959

959

959

959

Densidad suelo hmedo

g/cm

1.952

Cpsula

2.114
2.192
DETERMINACIN DE LA HUMEDAD

2.093

n.

Cpsula+suelo hmedo

279.50

300.70

345.40

285.70

Cpsula+suelo seco

260.20

275.30

309.10

252.10

Peso del gua

19.30

25.40

36.30

33.60

Peso cpsula

39.1

41.1

40.0

46.4

Peso suelo seco

221.10

234.20

269.10

205.70

Humedad

8.7

10.8

13.5

16.3

Humedad mdia

8.7

10.8

13.5

16.3

g/cm

1.795

1.907

1.931

1.799

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

Energia Compactacin
Golpes kg/cm2
56

28.22

Tipo
Modificado

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

1.938

Humedad ptima, %:

12.7

Grfico: Densidad Seca vs Contenido de Humedad

1.960
1.940

Densidad Aparente Seca, g/cm

1.920
1.900
1.880
1.860

1.840
1.820
1.800
1.780

10

11

12

13

14

15

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

16

17

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Sergut

Procedencia muestra

98+320

Muestra, n, Tramo, KM+000

Prestamo lateral

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Prestamo lateral izquierdo


MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

114.8

118.0

107.6

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Sergut

Procedemcia muestra

98+320

Muestra, n, Tramo, KM+000

Prestamo lateral

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

Prestamo lateral izquierdo


GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

118.0

41.11

52.41

107.6 80 24.63

28.84

ndice de Soporte Califrnia, %

114.8

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:

1.938

Humedad ptima, %:

12.7

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100

101

102

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE

NDICE DE SOPORTE CALIFORNIA


ENSAYO DE COMPACTACIN

LABORATRIO DE SUELOS
FRENTE

Mtodo AASHTO T- 180

Sergut
Campamento
Muestra 2 (M-2)

Contratista
Procedencia muestra
Muestra, n / Tramo, KM+000

Registro:
Fecha:

8.00
19/07/10

Profundidad, m / capa, n

M-2

Descripcin de la muestra:
Molde

n.

Molde + suelo hmedo

10030

10420

10640

10460

Peso del molde

5405

5405

5405

5405

Peso suelo hmedo

4625

5015

5235

5055

Volumen del molde

g/cm

2104

2104

2104

2104

Densidad suelo hmedo

g/cm

2.198

Cpsula

2.384
2.488
DETERMINACIN DE LA HUMEDAD

2.403

n.

10

11

Cpsula+suelo hmedo

521.00

508.00

490.00

592.00

Cpsula+suelo seco

505.00

481.00

454.00

535.00

Peso del gua

16.00

27.00

36.00

57.00

Peso cpsula

85.0

86.0

87.0

91.0

Peso suelo seco

420.00

395.00

367.00

444.00

Humedad

3.8

6.8

9.8

12.8

Humedad mdia

3.8

6.8

9.8

12.8

g/cm

2.118

2.231

2.266

2.129

Densidad suelo seco


Martillo

Moldeo

Peso

Altura

Capas

4.536

45.72

2058.0

Energia Compactacin
Golpes kg/cm2
56

Tipo

28.22

Resultado Ensayo de Compactacin


Densidad Aparente Seca Mxima, g/cm3:

Modificado

2.269

Humedad ptima, %:

9.2

Grfico: Densidad Seca vs Contenido de Humedad

2.280
2.260

Densidad Aparente Seca, g/cm

2.240
2.220
2.200
2.180

2.160
2.140
2.120
2.100

10

11

Contenido de Humedad (%)


Obs.:

Mod. S 04 (05/06).xls

Laboratorista:

Visto:

12

13

14

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


LABORATRIO DE SUELOS
FRENTE

ENSAYOS DE EXPANSIN Y PENETRACIN

Contratista

Sergut

Procedencia muestra

Campamento

Muestra, n, Tramo, KM+000

Muestra 2 (M-2)

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

M-2
MOLDEO DE PROBETAS

Molde

n.

Nmero de capas

Nmero de golpes/capa

56

25

12

Condicin de saturacin

Antes

Despues

Antes

Despues

Antes

Molde + suelo hmedo

12030

11910

11725

Peso del molde

6640

6675

6730

Peso suelo hmedo

5390

5235

4995

Volumen del molde

g/cm

2232

2250

2203

Densidad suelo hmedo

g/cm

2.415

2.327

2.267

Despues

DETERMINACIN DE LA HUMEDAD
Cpsula

355

Cpsula+suelo hmedo

308.00

335.00

307.00

Cpsula+suelo seco

287.00

330.00

286.00

Peso del gua

21.00

5.00

21.00

Peso cpsula

41.80

41.10

45.20

Peso suelo seco

245.20

288.90

240.80

Humedad

8.6

1.7

8.7

Humedad media

8.6

1.7

8.7

g/cm

2.224

2.287

2.085

98.0

100.8

91.9

Densidad suelo seco


Grado de Compactacin

EXPANSIN
MOLDE N
FECHA

HORA

7/6/2010
7/7/2010
7/8/2010
7/9/2010
7/10/2010
Altura Inicial
Expansin Final

14:00
14:00
14:00
14:00
14:00

LECT.

DIFER.

mm

mm

0.00
1.90
2.20
2.30
2.35

0.00
1.90
2.20
2.30
2.35
115.8
2.03

mm

MOLDE N

EXPANSIN

LECT.

DIFER.

MOLDE N

EXPANSIN

mm

mm

0.00
1.64
1.90
1.99
2.03

0.00
2.56
2.74
2.84
2.90

0.00
2.56
2.74
2.84
2.90
115.8
2.50

LECT.

DIFER.

EXPANSIN

mm

mm

0.00
2.21
2.37
2.45
2.50

0.00
1.70
1.80
1.85
0.00

0.00
1.70
1.80
1.85
0.00
115.8
0.00

%
0.00
1.47
1.55
1.60
0.00

PENETRACIN - Anillo 1163 - Presin=(1,534 x Lectura + 12,390)/19,32 cm 2 )


TIEMPO

PENETRACIN

PRESIN
PADRN

MOLDE N
Lectura Correc.

4
Presin

MOLDE N
CBR

Lectura Correc.

5
Presin

MOLDE N
CBR

Lectura Correc.

min

mm

POL

0.0

0.000

0.5

0.63

0.025

13

11

1.0

1.27

0.050

26

21

16

1.5

1.90

0.075

40

29

2.0

2.54

0.100

3.0

3.81

0.150

4.0

5.08

0.200

6.0

7.62

0.300

171

8.0

10.16

0.400

191

Kg/cm

70.3

0.0001

51

0.0001

450

kg/cm2

36.37 51.73

99
105.46

136

0.0001

38

0.0001

kg/cm2

75.91 71.98

67

0.0001

kg/cm2

28.91

41.11

32

688

55.27

52.41

100

210

17.32

24.63

76

375

30.42

28.84

91

109

375

2.07

min.

2.05

min.

2.04

min.

Correcciones 0,2":

4.07

min.

4.05

min.

4.04

min.

Obs.:
Laboratorista:

57

Correcciones 0,1":

Mod. S 04 (05/06).xls

CBR

25
356

64
948

0.0001

6
Presin

Visto:

SUPERVISIN TCNICA Y AMBIENTAL DE LA CONSTRUCCIN DE LAS OBRAS DE


MEJORAMIENTO Y PAVIMENTACIN DEL TRAMO YUCUMO - RURRENABAQUE

NDICE DE SOPORTE CALIFORNIA


Mtodo AASHTO T-193

LABORATRIO DE SUELOS
FRENTE

GRFICOS

Contratista

Sergut

Procedemcia muestra

Campamento

Muestra, n, Tramo, KM+000

Muestra 2 (M-2)

Profundidad, m / capa, n

Registro:
0
Fecha:

0.00

Descripcin de la muestra:

1/0/1900

M-2
GRFICO DE PENETRACIN

Lectura Anillo Dinamomtrico, 0,0001 mm

1000

800

600

400

200

0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Tiempo, minuto
4

Adoptado

GRFICO DE CBR X COMPACTACIN


GC 100 0,1"

0,2"

51.73

71.98

41.11

52.41

91.9 80 24.63

28.84

ndice de Soporte Califrnia, %

98.0
100.8

60

40

20

0
90

91

92

93

94

95

96

97

98

99

Grado de Compactacin, %
0,1"

0,2"

CBR Adoptado

RESULTADOS FINALES
Densidad Mxima Suelo Seco, g/cm3:
Humedad ptima, %:

2.269
9.2

Expansin, %:

2.5

CBR a 95% de Compactacin, %

38.0

CBR a 97% de Compactacin, %

45.6

CBR a 100% de Compactacin, %

49.7

Obs.:

Mod. S 04 (05/06).xls

Laboratorista: Benito Mamani

Visto:

100