1PROGRAM OF WORK Jalajala Solar
1PROGRAM OF WORK Jalajala Solar
DATE:______________
NAME OF PROJECT:
INSTALLATION OF SOLAR PANEL FOR THE JALAJALA MUNICIPAL HALL
Appropriation:________________________
Source of funds:_______________________
Location: Released:____________________________
Municipal Hall, Jalajala Rizal Cal. Days to Complete:__________________
Desirable starting date:_________________
Mode of Implementation:________________
Project Category:
Special Project
PROJECT DESCRIPTION:
Minimum equipment requirement:
1 PV Components
1.01 550W Solar Panel Pcs 130
1.02 Rail Kits Pcs 70
1.03 Mid Clamp Pcs 150
1.04 End Clamp Pcs 50
1.05 Lfoot Pcs 250
1.06 DC Wire 6mm Boxes 10
1.07 25kW On-Grid Inverter Pcs 4
1.08 DC Breaker Pcs 12
1.07 DC SPD Pcs 12
2 Consumables - -
2.01 Portland Cement bag 15
2.02 Crushed Gravel 3/4" cu.m 3.00
2.03 Washed Sand cu.m 3.00
2.04 EMT Lot 1
2.05 AC Wire 60mm Meter 80
2.06 MDP Lot 1
Description Number
1
Civil and Electrical Works Unit Price Per Unit Total Cost
1 Construction of New __ Sq. M.
Powerhouse
2 Installation of Solar Panels
3. Installation of electrical
wirings
4. Installation of DC Breaker
5 Installation of DC SPD
6 Cement Plaster finish
(Powerhouse)
7 Painting of Powerhouse
TOTAL PHP_______________________