STRATEGI PELAKSANAAN PEKERJAAN

PROJECT TBBM SUB MARINE TANJUNG BATU


START

PEKEERJAAN PEKERJAAN PEKERJAAN


ENGINEERING PROCUREMENT KONSTRUKSI / FABRIKASI

Input Design Procurement


(Shop Drawing) Plan Pekerjaan Konstruksi / Fabrikasi

TIDAK

Detail Engineering Material Temporary / Alat Bantu


> Surveying Check by
> Pembuatan Shop Quality
Informasi Data Dari NK Proses Procurement
Drawing
> Pembuatan Procedure YA

Delivery Product Completion Fabrication


TIDAK
Check by
NK
Sandblasting & Painting

YA Material TIDAK TIDAK


Receiving Dikembalikan ke Vendor
Inspection
Check by
Quality

YA YA

Penyimpanan di Warehouse &


Instalasi
Update Status Material

TIDAK

Material Issued
Punch List

YA

SELESAI
As Built Document