You are on page 1of 5

GUIDO COLANGIULI

PSMI EASY - RECAP 2


Easy video course for the Professional Scrum Master I (PSMI) Assessment

Based on Scrum guide 2020
SCRUM TEAM 1
• All people are equal, all roles fall under the Scrum Team;
• The scrum team is fewer than ten people;
• The Developers are equally accountable for every aspect of
the sprint;
• The product owner is the people committed to maximizing
the value;

Follow us on: www.pmguide.cloud


SCRUM TEAM 2
• Only the product owner can change the product backlog;
• If someone wants to change the product backlog need to
convince the Product Owner.
• The product owner is a person, not a committee;
• The product owner can delegate some of his works, but he
remains accountable for it;

Follow us on: www.pmguide.cloud


SCRUM TEAM 3
• The product owner is the only one who can cancel a sprint;
• The Project manager doesn’t exist. The Scrum Master isn’t
a project manager;
• The Scrum Master is a servant leader accountable for the
Scrum Team’s effectiveness;
• The Scrum Master is a Coach and a Guide for all the teams
and the organization.

Follow us on: www.pmguide.cloud


THANK YOU FOR WATCHING
SEE YOU AT THE NEXT VIDEO

Follow us on: www.pmguide.cloud

You might also like