You are on page 1of 1

ARTS EXHIBIT (EXPENSES)

With receipts:
BOUGHT FROM: QUANTITY: MATERIALS: TOTAL:
Unitop 3 pcs. Grapes Leaves (P49 each) P147.00
Ading Store 2 pads Pins (P12 per pad) P24.00
Cebu South 1/2 kg. Alambre P45.00
Electrical Hardware
Unitop 5 meters Lights (Gold) P349.00
Sebu Printing Shop 18x120 Tarpaulin P300.00
inch.
Sebu Printing Shop 4x6 ft. Tarpaulin P360.00
Novo 15 pcs. big Frame (P40 each) P600.00
25 pcs. Frame (P25 each) P625.00
small
Anjo 60 meters Alpha Gina (P31 per meter) P1,860
People’s 1 pc. Double Sided Tape P12
Educational Supply 2 pcs. Cartolina (P6.50 each) P13
TOTAL: P4,335.00

Without receipts:
BOUGHT FROM: QUANTITY: MATERIALS: TOTAL:
Cebu South 2 kgs. Alambre (P90 per kg.) P180.00
Electrical Hardware
1/2 kg. Alambre P45.00
Jeepney 6 back and Transportation (P10 per way/2 P120.00
forth persons)
Julie’s Bakeshop 20 pcs. Bread (P6 each) P120.00
Arise and Shine 50 pcs. Ice water (P1 each/2 days) P50.00
Ading Store 3 pcs. Double Sided Tape (P15 each) P45.00
2 boxes Thumb Tacks (P15 per box) P30.00
TOTAL: P590.00

TOTAL EXPENSES:
With receipts= P4,335.00
Without receipts= P590.00
Total= P4,925.00

Total amount collected= P4,980.00


-Total expenses= P4925.00
Remaining= P55.00

You might also like