You are on page 1of 7
EARTHING/GROUNDING Ne] Comegyen | TYPE OF CONSTRUCTION REMARKS, @ @ o @ eo Eating on snl MV OM. poe 2 0 Eating on double MY OM pole 3 03 Eating on LY Opole ‘Standar Konstruksi Jaringan Distribusi PT. PLN (Persero) Distribusi Bali Kerjasama dengan Polteknik Negeri Bal DRAWINGS LIST : EARTHING LV.MV & No: 41 - 00) ‘Sheet TRANSFORMER S/S ON CONCRETE POLE 00 | scale | sdonal rods ifrecured| K dy a cee A ‘TOP VIEW ‘Standar Konstruksi Jaringan Distribusi PT. PLN (Persero) Distribusi Bali Kerjasama dengan Polteknik Negeri Bal Sheet Tot EARTHING ON SINGLE MV OHL POLE No: 41-01 E01 ‘Seale Thisindication is vai of The earth fauk curert setng is < 308 The earth fauks are ceconneced witin atime < 05 socnds (2.5.3 Sytem wilh fo -resitance neural eating, VE 0161/76) 2. Atr the cooper wire install and the ert is bac and compacted the resizance shall be measired If the resin ert esizance, rot be obtains, earthing rode shal be added nti ens vale isreacted, Measring souk’ be done wth ps. 4 connect! EARTHING REQUIREMENTS STRUCTURE EARTH RESISTANCE = Pole with elec ecuipment aa Every ther ple on ONL wth bare consucor only 150.2 ¢ [mire ‘Ground terial (part of hepa) * mount requred 3 [2-19 [O12 _ | contin roa th cam (016% 2400 mm) ‘reonce stn he instal alang the foe 2 [2-22 [2 | Paratet groove cara 1 | 9-94 |C0aam | cooper stip S0mm = pos] Gade | Arman Deseroaon Drawing Ne Rerarte Kose _| Suman akan No. Somber eterangen ‘Standar Konstruksi Jaringan Distribusi PT. PLN (Persero) Distribusi Bali Kerjasama dengan Polteknik Negeri Bal EARTHING ON SINGLE No:41-02 | Sheet 2of2 MV OHL POLE E01 [scale i Requtec ‘Standar Konstruksi Jaringan Distribusi PT. PLN (Persero) Distribusi Bali Kerjasama dengan Polteknik Negeri Bal EARTHING ON DOUBLE No:41-03 [Sheet 1012 MV OHL POLE E02 [Scale faut currereseting 6 < 30 {aus are connec win atime ¢ 05 seands (2.53 System with ow resist crea eating, VDE 014/76) 2. tr the cooper wire install and the earth sbacfles an compacad the rexstnae shal be measured. If the required eat estance be obtained earthing rods stall be aed url necessary valve isreached. Measrng shoud with os, 4 cnet EARTHING REQUIREMENTS ‘STRUCTURE EARTH RESISTANCE Pole with elec exugment cia ~ Every othe pale on ONL wth bare cndctr only < 150. (6) © [samara [2 [Grounding terial (arto the pote) Amount a equres 5 +The atonal rods 3 wo [4 ng 0d with damp (O16 2400 rem) 219 2 dao (01 » shoud be insaled 2 [2-22 [4 _ | Paral groove dane ‘aang the ine 1 [9-98 |[O0a0m | cooper 50mm ™ pos] Gee | Aout Desiion Drawing No, Remar Kose _| Somos stan No. Gombe xeeranaen PT. PLN (Persero) Distribusi Bali ‘Standar Konstruksi Jaringan Distribusi Kerjasama dengan Politeknik Negeri Bali EARTHING ON DOUBLE Noi 41-04 [Sheet 20f2 MV OHL POLE E02 [scale s+ 9+10 iF Requires ‘Standar Konstruksi Jaringan PT. PLN (Persero) Distribusi Bali Kerjasama dengan Politeknik Negeri Bali EARTHING ON LV OHL, Noi 41-05 [Sheet 1of2 POLE E03 | Scale [aoe [2 [akan © 3 | naw Swapping bce oun a be 8 11-198 | 0,7 m_| Stainless steel strap 20x 0.7 mm {netaled on every pole : 2, foe. tough have be 7 [saan [2 | ert connecter dan S050 mm tale on Every pk © [9-80 | 18m | cooper arp 0 nn? usted green br Sip een 3 [nie rounding ternal op pr op) 2. Tyee en + [trai | __3 | ering trina baton prt tp) Shore <200m festa 7 fen esa. 3 [sea [72 | earting ed wth cp 616 200) me bateatanes eat Oy arallel groove clamp should be 2 [aa [Os | retioe soe! 1 9-90 [7m | cooper strip 50 mm? coe font Oman Drona no arate res} Kose _| Sami Rak No. Gombe eterangen ‘Standar Konstruksi Jaringan Distribusi PT. PLN (Persero) Distribusi Bali Kerjasama dengan Polteknik Negeri Bal EARTHING ON LV OHL Nordi-06 [Sheet 2of2 POLE E03 Scale

You might also like