3" downed From Finished Portico Level /, /~ Manhole open- 21" x21" VY 45" tk- RCC Mat ( M20) Well compacted Earth 9" Brick work Wall - CM 1:6 18mm - Cement Plaster ( CM - 1:4) Flooring (M20) PCC 148 PCC 14:8 my Lope 4 ¥ BRICK WORK WATER TANK PLAN & SECTION VIEW 9" Wirecut Brick work with Mortar Ratio of 1:6 Flooring concrete (M20) Nove 1. Steps may be fed as per ste conditions @ 15 inch intervals 2, Doctor LW shouldbe mixed for Cement plastering and Foosng concrete work should be provided at 10 1 inch ster must be plein rished 5. RCC Mat - Top Main Rod- 0mm # @ 150mm C/C and Bottom Dist Rad # 8mm @ 200 mm CC 6 Manhole open in RCC - 21°21" with extra main ods on Sides CALCULATE Xo yoy Lob